IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v145y2003i3p635-644.html
   My bibliography  Save this article

The finite multiple lot sizing problem with interrupted geometric yield and holding costs

Author

Listed:
  • Guu, Sy-Ming
  • Zhang, Alex X.

Abstract

No abstract is available for this item.

Suggested Citation

  • Guu, Sy-Ming & Zhang, Alex X., 2003. "The finite multiple lot sizing problem with interrupted geometric yield and holding costs," European Journal of Operational Research, Elsevier, vol. 145(3), pages 635-644, March.
  • Handle: RePEc:eee:ejores:v:145:y:2003:i:3:p:635-644
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(02)00217-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Evan L. Porteus, 1990. "Note---The Impact of Inspection Delay on Process and Inspection Lot Sizing," Management Science, INFORMS, vol. 36(8), pages 999-1007, August.
    2. Sheldon M. Ross, 1971. "Quality Control under Markovian Deterioration," Management Science, INFORMS, vol. 17(9), pages 587-596, May.
    3. Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
    4. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Divya Tiwari & Rahul Patil & Janat Shah, 2015. "Sequential unreliable newsboy ordering policies," Annals of Operations Research, Springer, vol. 233(1), pages 449-463, October.
    2. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    3. M-C Wu & L-C Huang & H-M Hsu & T-S Su, 2011. "Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1075-1084, June.
    4. Victor F. Araman & Ioana Popescu, 2010. "Media Revenue Management with Audience Uncertainty: Balancing Upfront and Spot Market Sales," Manufacturing & Service Operations Management, INFORMS, vol. 12(2), pages 190-212, December.
    5. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
    6. Inderfurth, Karl & Vogelgesang, Stephanie, 2013. "Concepts for safety stock determination under stochastic demand and different types of random production yield," European Journal of Operational Research, Elsevier, vol. 224(2), pages 293-301.
    7. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
    8. Sy-Ming Guu & Chun-Yi Lin, 2018. "The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico’s heuristic," Annals of Operations Research, Springer, vol. 269(1), pages 167-183, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sy-Ming Guu & Chun-Yi Lin, 2018. "The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico’s heuristic," Annals of Operations Research, Springer, vol. 269(1), pages 167-183, October.
    2. Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
    3. Abraham Grosfeld-Nir & Yigal Gerchak & Qi-Ming He, 2000. "Manufacturing to Order with Random Yield and Costly Inspection," Operations Research, INFORMS, vol. 48(5), pages 761-767, October.
    4. Stephen M. Gilbert & Hena M Bar, 1999. "The value of observing the condition of a deteriorating machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(7), pages 790-808, October.
    5. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
    6. T W Sloan, 2004. "A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 647-656, June.
    7. Abraham Grosfeld‐Nir & Eyal Cohen & Yigal Gerchak, 2007. "Production to order and off‐line inspection when the production process is partially observable," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(8), pages 845-858, December.
    8. Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
    9. Kaijie Zhu & Rachel Q. Zhang & Fugee Tsung, 2007. "Pushing Quality Improvement Along Supply Chains," Management Science, INFORMS, vol. 53(3), pages 421-436, March.
    10. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    11. Khan, Mehmood & Jaber, Mohamad Y. & Bonney, Maurice, 2011. "An economic order quantity (EOQ) for items with imperfect quality and inspection errors," International Journal of Production Economics, Elsevier, vol. 133(1), pages 113-118, September.
    12. Freimer, Michael & Thomas, Douglas & Tyworth, John, 2006. "The value of setup cost reduction and process improvement for the economic production quantity model with defects," European Journal of Operational Research, Elsevier, vol. 173(1), pages 241-251, August.
    13. A. Gürhan Kök & Kevin H. Shang, 2007. "Inspection and Replenishment Policies for Systems with Inventory Record Inaccuracy," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 185-205, February.
    14. Maddah, Bacel & Moussawi, Lama & Jaber, Mohamad Y., 2010. "Lot sizing with a Markov production process and imperfect items scrapped," International Journal of Production Economics, Elsevier, vol. 124(2), pages 340-347, April.
    15. Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
    16. Oner, Selma & Bilgic, Taner, 2008. "Economic lot scheduling with uncontrolled co-production," European Journal of Operational Research, Elsevier, vol. 188(3), pages 793-810, August.
    17. Yassine, Ali & Maddah, Bacel & Salameh, Moueen, 2012. "Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model," International Journal of Production Economics, Elsevier, vol. 135(1), pages 345-352.
    18. Bendavid, Illana & Herer, Yale T., 2009. "Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control," European Journal of Operational Research, Elsevier, vol. 195(1), pages 139-155, May.
    19. Jing Wu & Dan Zhang & Yang Yang & Gongshu Wang & Lijie Su, 2022. "Multi-Stage Multi-Product Production and Inventory Planning for Cold Rolling under Random Yield," Mathematics, MDPI, vol. 10(4), pages 1-21, February.
    20. L-C Lin & K-L Hou, 2005. "An inventory system with investment to reduce yield variability and set-up cost," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(1), pages 67-74, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:145:y:2003:i:3:p:635-644. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.