IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v145y2003i3p621-634.html
   My bibliography  Save this article

Reducing the cost of defects in multistage production systems: A budget allocation perspective

Author

Listed:
  • Hadjinicola, George C.
  • Soteriou, Andreas C.

Abstract

No abstract is available for this item.

Suggested Citation

  • Hadjinicola, George C. & Soteriou, Andreas C., 2003. "Reducing the cost of defects in multistage production systems: A budget allocation perspective," European Journal of Operational Research, Elsevier, vol. 145(3), pages 621-634, March.
  • Handle: RePEc:eee:ejores:v:145:y:2003:i:3:p:621-634
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(02)00216-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sampath Rajagopalan & Medini R. Singh & Thomas E. Morton, 1998. "Capacity Expansion and Replacement in Growing Markets with Uncertain Technological Breakthroughs," Management Science, INFORMS, vol. 44(1), pages 12-30, January.
    2. Kwang‐Fu Li, 1987. "Serial production lines with unreliable machines and limited repair," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(1), pages 101-108, February.
    3. Linguo Gong & Ton de Kok & Jie Ding, 1994. "Optimal Leadtimes Planning in a Serial Production System," Management Science, INFORMS, vol. 40(5), pages 629-632, May.
    4. Ram Akella & S. Rajagopalan & Medini R. Singh, 1992. "Part Dispatch in Random Yield Multistage Flexible Test Systems for Printed Circuit Boards," Operations Research, INFORMS, vol. 40(4), pages 776-789, August.
    5. Anne Spence Wein, 1992. "Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment," Operations Research, INFORMS, vol. 40(3), pages 551-563, June.
    6. S. Rajagopalan & Andreas C. Soteriou, 1994. "Capacity Acquisition and Disposal with Discrete Facility Sizes," Management Science, INFORMS, vol. 40(7), pages 903-917, July.
    7. Donald P. Ballou & Harold L. Pazer, 1982. "The Impact of Inspector Fallibility on the Inspection Policy in Serial Production Systems," Management Science, INFORMS, vol. 28(4), pages 387-399, April.
    8. Iftekhar A. Karimi, 1992. "Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs," Management Science, INFORMS, vol. 38(10), pages 1467-1481, October.
    9. Rebello, Ranjit & Agnetis, Alessandro & Mirchandani, Pitu B., 1995. "Specialized inspection problems in serial production systems," European Journal of Operational Research, Elsevier, vol. 80(2), pages 277-296, January.
    10. Hau L. Lee, 1996. "Input Control for Serial Production Lines Consisting of Processing and Assembly Operations with Random Yields," Operations Research, INFORMS, vol. 44(3), pages 464-468, June.
    11. Kevin B. Hendricks & John O. McClain, 1993. "The Output Process of Serial Production Lines of General Machines with Finite Buffers," Management Science, INFORMS, vol. 39(10), pages 1194-1201, October.
    12. Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
    13. Eric V. Denardo & Christopher S. Tang, 1992. "Linear Control of a Markov Production System," Operations Research, INFORMS, vol. 40(2), pages 259-278, April.
    14. Richard Conway & William Maxwell & John O. McClain & L. Joseph Thomas, 1988. "The Role of Work-in-Process Inventory in Serial Production Lines," Operations Research, INFORMS, vol. 36(2), pages 229-241, April.
    15. Eric V. Denardo & Christopher S. Tang, 1997. "Control of a Stochastic Production System with Estimated Parameters," Management Science, INFORMS, vol. 43(9), pages 1296-1307, September.
    16. Christopher S. Tang, 1990. "The Impact of Uncertainty on a Production Line," Management Science, INFORMS, vol. 36(12), pages 1518-1531, December.
    17. Kevin B. Hendricks, 1992. "The Output Processes of Serial Production Lines of Exponential Machines with Finite Buffers," Operations Research, INFORMS, vol. 40(6), pages 1139-1147, December.
    18. Terry P. Harrison & Holly S. Lewis, 1996. "Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources," Management Science, INFORMS, vol. 42(1), pages 19-36, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. G C Hadjinicola, 2010. "Manufacturing costs in serial production systems with rework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(2), pages 342-351, February.
    2. L. Gong & H. Matsuo, 1997. "Control Policy for a Manufacturing System with Random Yield and Rework," Journal of Optimization Theory and Applications, Springer, vol. 95(1), pages 149-175, October.
    3. Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
    4. Lutz, Christian M. & Roscoe Davis, K. & Sun, Minghe, 1998. "Determining buffer location and size in production lines using tabu search," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 301-316, April.
    5. Tang, Christopher S., 2006. "Perspectives in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 103(2), pages 451-488, October.
    6. Jim (Junmin) Shi & Xiaohang Yue & Yao Zhao, 2014. "Operations sequencing for a multi‐stage production inventory system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(2), pages 144-154, March.
    7. Juhwen Hwang & Medini R. Singh, 1998. "Optimal Production Policies for Multi-Stage Systems with Setup Costs and Uncertain Capacities," Management Science, INFORMS, vol. 44(9), pages 1279-1294, September.
    8. Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
    9. Chen, Chin-Tai & Yuan, John, 2004. "Transient throughput analysis for a series type system of machines in terms of alternating renewal processes," European Journal of Operational Research, Elsevier, vol. 155(1), pages 178-197, May.
    10. Tan, Baris, 1997. "Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failures," European Journal of Operational Research, Elsevier, vol. 101(3), pages 560-576, September.
    11. Qing Li & Shaohui Zheng, 2006. "Joint Inventory Replenishment and Pricing Control for Systems with Uncertain Yield and Demand," Operations Research, INFORMS, vol. 54(4), pages 696-705, August.
    12. Martínez-Costa, Carme & Mas-Machuca, Marta & Benedito, Ernest & Corominas, Albert, 2014. "A review of mathematical programming models for strategic capacity planning in manufacturing," International Journal of Production Economics, Elsevier, vol. 153(C), pages 66-85.
    13. Awi Federgruen & Nan Yang, 2008. "Selecting a Portfolio of Suppliers Under Demand and Supply Risks," Operations Research, INFORMS, vol. 56(4), pages 916-936, August.
    14. Poretus, Evan L. & Angelus, Alexander, 2000. "Simultaneous Production and Capacity Management under Stochastic Demand for Perishable Goods," Research Papers 1419r, Stanford University, Graduate School of Business.
    15. Chand, Suresh & McClurg, Tim & Ward, Jim, 2000. "A model for parallel machine replacement with capacity expansion," European Journal of Operational Research, Elsevier, vol. 121(3), pages 519-531, March.
    16. M-C Wu & L-C Huang & H-M Hsu & T-S Su, 2011. "Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1075-1084, June.
    17. Gerchak, Yigal & Grosfeld-Nir, Abraham, 1998. "Multiple lot-sizing, and value of probabilistic information, in production to order of an uncertain size," International Journal of Production Economics, Elsevier, vol. 56(1), pages 191-197, September.
    18. Ouyang, Yanfeng, 2007. "The effect of information sharing on supply chain stability and the bullwhip effect," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1107-1121, November.
    19. Vernon Ning Hsu, 2002. "Dynamic Capacity Expansion Problem with Deferred Expansion and Age-Dependent Shortage Cost," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 44-54, June.
    20. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:145:y:2003:i:3:p:621-634. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.