IDEAS home Printed from https://ideas.repec.org/p/ces/ceswps/_7885.html
   My bibliography  Save this paper

Under/Over-Investment and Early Renegotiation in Public-Private Partnerships

Author

Listed:
  • Daniel Danau
  • Annalisa Vinella

Abstract

We consider a public-private partnership in an infrastructure project, which requires specialised expertise during the construction stage for the infrastructure to operationalise. This entails that, after an investment is made to begin building the infrastructure, its construction is completed at a cost, which increases with the investment at an increasing rate, and is higher if the government replaces the firm beforehand. The likelihood of a lower operating cost increases as well with the initial investment. Once the infrastructure is in place, the firm manages it, taking advantage of the (usual) synergy between construction and operation. Given the characteristics of the project, the firm has an incentive to either under-invest or over-invest in early construction, seeking a renegotiation thereafter. We show that, in a renegotiation-proof contract, the marginal cost of the investment facing the government is either above or below the marginal “technological” cost of the investment, at optimum. Accordingly, the resulting investment - although enhanced - is either below or above the efficient level. The contractual payoff of the firm is above its renegotiation payoff in the former case, below in the latter. We further show that when the firm holds private information on the operating conditions, the government may welcome a contractual renegotiation either as a way of containing (avoiding) the distortions due to the informational gap, or as a tool to pass the cost of construction completion onto the firm, or both.

Suggested Citation

  • Daniel Danau & Annalisa Vinella, 2019. "Under/Over-Investment and Early Renegotiation in Public-Private Partnerships," CESifo Working Paper Series 7885, CESifo.
  • Handle: RePEc:ces:ceswps:_7885
    as

    Download full text from publisher

    File URL: https://www.cesifo.org/DocDL/cesifo1_wp7885_0.pdf
    Download Restriction: no
    ---><---

    Other versions of this item:

    References listed on IDEAS

    as
    1. Guasch, J. Luis & Laffont, Jean-Jacques & Straub, Stephane, 2003. "Renegotiation of concession contracts in Latin America," Policy Research Working Paper Series 3011, The World Bank.
    2. Hart, Oliver D & Moore, John, 1988. "Incomplete Contracts and Renegotiation," Econometrica, Econometric Society, vol. 56(4), pages 755-785, July.
    3. Roland Kager & Lucas Harms, 2017. "Synergies from Improved Cycling-Transit Integration: Towards an Integrated Urban Mobility System," International Transport Forum Discussion Papers 2017/23, OECD Publishing.
    4. Oecd, 2007. "Public Procurement Review and Remedies Systems in the European Union," OECD Papers, OECD Publishing, vol. 7(4), pages 1-110.
    5. Iossa, Elisabetta & Martimort, David, 2016. "Corruption in PPPs, incentives and contract incompleteness," International Journal of Industrial Organization, Elsevier, vol. 44(C), pages 85-100.
    6. David Martimort & Stéphane Straub, 2016. "How To Design Infrastructure Contracts In A Warming World: A Critical Appraisal Of Public–Private Partnerships," International Economic Review, Department of Economics, University of Pennsylvania and Osaka University Institute of Social and Economic Research Association, vol. 57(1), pages 61-88, February.
    7. Sidak,J. Gregory & Spulber,Daniel F., 1998. "Deregulatory Takings and the Regulatory Contract," Cambridge Books, Cambridge University Press, number 9780521591591.
    8. Elisabetta Iossa & David Martimort, 2012. "Risk allocation and the costs and benefits of public--private partnerships," RAND Journal of Economics, RAND Corporation, vol. 43(3), pages 442-474, September.
    9. Daniel Danau & Annalisa Vinella, 2017. "From fixed to state‐dependent duration in public‐private partnerships," Journal of Economics & Management Strategy, Wiley Blackwell, vol. 26(3), pages 636-660, September.
    10. Engel, Eduardo M.R:A. & Fischer, Ronald & Galetovic, Alexander, 2019. "Soft budgets and endogenous renegotiations in transport PPPs: An equilibrium analysis," Economics of Transportation, Elsevier, vol. 17(C), pages 40-50.
    11. Quadrini, Vincenzo, 2004. "Investment and liquidation in renegotiation-proof contracts with moral hazard," Journal of Monetary Economics, Elsevier, vol. 51(4), pages 713-751, May.
    12. Mathias Dewatripont, 1988. "Commitment Through Renegotiation-Proof Contracts with Third Parties," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 55(3), pages 377-390.
    13. Grossman, Sanford J & Hart, Oliver D, 1986. "The Costs and Benefits of Ownership: A Theory of Vertical and Lateral Integration," Journal of Political Economy, University of Chicago Press, vol. 94(4), pages 691-719, August.
    14. Neeman, Zvika & Pavlov, Gregory, 2013. "Ex post renegotiation-proof mechanism design," Journal of Economic Theory, Elsevier, vol. 148(2), pages 473-501.
    15. Oecd, 2007. "Public Procurement Review and Remedies Systems in the European Union," SIGMA Papers 41, OECD Publishing.
    16. Frank T. Rothaermel & Charles W. L. Hill, 2005. "Technological Discontinuities and Complementary Assets: A Longitudinal Study of Industry and Firm Performance," Organization Science, INFORMS, vol. 16(1), pages 52-70, February.
    17. Guasch, J. Luis & Straub, Stphane, 2009. "Corruption and concession renegotiations.: Evidence from the water and transport sectors in Latin America," Utilities Policy, Elsevier, vol. 17(2), pages 185-190, June.
    18. Eric Maskin & Jean Tirole, 1999. "Unforeseen Contingencies and Incomplete Contracts," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 66(1), pages 83-114.
    19. David Martimort & Flavio Menezes & Myrna Wooders & DANIEL DANAU & ANNALISA VINELLA, 2015. "Public-Private Contracting under Limited Commitment," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 17(1), pages 78-110, February.
    20. David Martimort & Stéphane Straub, 2016. "How To Design Infrastructure Contracts In A Warming World: A Critical Appraisal Of Public–Private Partnerships," International Economic Review, Department of Economics, University of Pennsylvania and Osaka University Institute of Social and Economic Research Association, vol. 57, pages 61-88, February.
    21. Oliver Hart & Andrei Shleifer & Robert W. Vishny, 1997. "The Proper Scope of Government: Theory and an Application to Prisons," The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 112(4), pages 1127-1161.
    22. Michael Trebilcock & Michael Rosenstock, 2015. "Infrastructure Public-Private Partnerships in the Developing World: Lessons from Recent Experience," Journal of Development Studies, Taylor & Francis Journals, vol. 51(4), pages 335-354, April.
    23. Maskin, Eric, 2002. "On indescribable contingencies and incomplete contracts," European Economic Review, Elsevier, vol. 46(4-5), pages 725-733, May.
    24. Daniel Danau, 2019. "Contract law and Contract theory. A survey and some considerations," Economics Working Paper Archive (University of Rennes 1 & University of Caen) 2019-04, Center for Research in Economics and Management (CREM), University of Rennes 1, University of Caen and CNRS.
    25. Bolton, Patrick, 1990. "Renegotiation and the dynamics of contract design," European Economic Review, Elsevier, vol. 34(2-3), pages 303-310, May.
    26. J. Luis Guasch, 2004. "Granting and Renegotiating Infrastructure Concessions : Doing it Right," World Bank Publications - Books, The World Bank Group, number 15024, December.
    27. Sónia Araújo & Douglas Sutherland, 2010. "Public-Private Partnerships and Investment in Infrastructure," OECD Economics Department Working Papers 803, OECD Publishing.
    28. Frederic Marty & Arnaud Voisin, 2008. "Partnership contracts, project finance and information asymmetries: from competition for the contract to competition within the contract?," Documents de Travail de l'OFCE 2008-06, Observatoire Francais des Conjonctures Economiques (OFCE).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Eva I. Hoppe & Patrick W. Schmitz, 2021. "How (Not) to Foster Innovations in Public Infrastructure Projects," Scandinavian Journal of Economics, Wiley Blackwell, vol. 123(1), pages 238-266, January.
    2. Eva I. Hoppe & Patrick W. Schmitz, 2013. "Public-private partnerships versus traditional procurement: Innovation incentives and information gathering," RAND Journal of Economics, RAND Corporation, vol. 44(1), pages 56-74, March.
    3. Oriol Carbonell-Nicolau & Diego Comin, 2005. "Testing out Contractual Incompleteness: Evidence from Soccer," NBER Working Papers 11110, National Bureau of Economic Research, Inc.
    4. Daniel Danau, 2019. "Contract law and Contract theory. A survey and some considerations," Economics Working Paper Archive (University of Rennes 1 & University of Caen) 2019-04, Center for Research in Economics and Management (CREM), University of Rennes 1, University of Caen and CNRS.
    5. repec:bla:annpce:v:89:y:2018:i:1:p:25-48 is not listed on IDEAS
    6. Daniel Danau & Annalisa Vinella, 2017. "From fixed to state‐dependent duration in public‐private partnerships," Journal of Economics & Management Strategy, Wiley Blackwell, vol. 26(3), pages 636-660, September.
    7. Carbonell-Nicolau Oriol & Comin Diego, 2009. "Testing the Commitment Hypothesis in Contractual Settings: Evidence from Soccer," Journal of Quantitative Analysis in Sports, De Gruyter, vol. 5(4), pages 1-40, October.
    8. Ernst Fehr & Michael Powell & Tom Wilkening, 2014. "Handing Out Guns at a Knife Fight: Behavioral Limitations of Subgame-Perfect Implementation," CESifo Working Paper Series 4948, CESifo.
    9. Fehr, Ernst & Powell, Michael & Wilkening, Tom, 2021. "Behavioral Constraints on the Design of Subgame-Perfect Implementation Mechanisms," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 111(4), pages 1055-1091.
    10. Schmitz, Patrick W., 2013. "Job design with conflicting tasks reconsidered," European Economic Review, Elsevier, vol. 57(C), pages 108-117.
    11. Nicolas Campos & Eduardo Engel & Ronald D. Fischer & Alexander Galetovic, 2019. "Renegotiations and corruption in infrastructure: The Odebrecht case," "Marco Fanno" Working Papers 0230, Dipartimento di Scienze Economiche "Marco Fanno".
    12. Evelyn Korn & Stephan Meisenzahl, 2009. "Contracting still matters! Or: How to design a letter of intent," MAGKS Papers on Economics 200909, Philipps-Universität Marburg, Faculty of Business Administration and Economics, Department of Economics (Volkswirtschaftliche Abteilung).
    13. Schmitz, Patrick W., 2021. "Optimal ownership of public goods under asymmetric information," Journal of Public Economics, Elsevier, vol. 198(C).
    14. Schmitz, Patrick W., 2010. "Contractual solutions to hold-up problems with quality uncertainty and unobservable investments," Journal of Mathematical Economics, Elsevier, vol. 46(5), pages 807-816, September.
    15. Sarmento, Joaquim Miranda & Renneboog, Luc, 2021. "Renegotiating public-private partnerships," Journal of Multinational Financial Management, Elsevier, vol. 59(C).
    16. Müller, Daniel & Schmitz, Patrick W., 2016. "Vertragstheorie: Zum Nobelpreis 2016 für Oliver Hart und Bengt Holmström [Contract Theory: On the Contributions of the 2016 Nobel Laureates Oliver Hart and Bengt Holmström]," MPRA Paper 75233, University Library of Munich, Germany.
    17. Ram Singh, 2018. "Public–private partnerships vs. traditional contracts for highways," Indian Economic Review, Springer, vol. 53(1), pages 29-63, December.
    18. Schmitz, Patrick W., 2015. "Government versus private ownership of public goods: The role of bargaining frictions," Journal of Public Economics, Elsevier, vol. 132(C), pages 23-31.
    19. Ilya Segal & Michael D.Whinston, 2012. "Property Rights [The Handbook of Organizational Economics]," Introductory Chapters,, Princeton University Press.
    20. Pablo Casas-Arce & Thomas Kittsteiner & F. Asís Martínez-Jerez, 2019. "Contracting with Opportunistic Partners: Theory and Application to Technology Development and Innovation," Management Science, INFORMS, vol. 65(2), pages 842-858, February.
    21. Aghion, Philippe & Dewatripont, Mathias & Rey, Patrick, 2002. "On partial contracting," European Economic Review, Elsevier, vol. 46(4-5), pages 745-753, May.

    More about this item

    Keywords

    public-private partnerships; asset specificity; hold-up; over/under-investment; renegotiation;
    All these keywords.

    JEL classification:

    • D82 - Microeconomics - - Information, Knowledge, and Uncertainty - - - Asymmetric and Private Information; Mechanism Design
    • H57 - Public Economics - - National Government Expenditures and Related Policies - - - Procurement
    • H81 - Public Economics - - Miscellaneous Issues - - - Governmental Loans; Loan Guarantees; Credits; Grants; Bailouts

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ces:ceswps:_7885. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Klaus Wohlrabe (email available below). General contact details of provider: https://edirc.repec.org/data/cesifde.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.