IDEAS home Printed from https://ideas.repec.org/a/eee/rensus/v41y2015icp1244-1254.html
   My bibliography  Save this article

Multistage stochastic inexact chance-constraint programming for an integrated biomass-municipal solid waste power supply management under uncertainty

Author

Listed:
  • Wu, C.B.
  • Huang, G.H.
  • Li, W.
  • Xie, Y.L.
  • Xu, Y.

Abstract

In this study, a multistage stochastic inexact chance-constraint programming (MSICCP) model is developed for power supply management under uncertainties. In the MSICCP model, methods of multistage stochastic programming (MSP), interval-parameter programming (IPP), and chance-constraint programming (CCP) are introduced into a general optimization framework, such that the developed model can tackle uncertainties described in terms of interval values and probability distribution s over a multistage context. Moreover, it can reflect dynamic and randomness of energy resources during the planning horizon. The developed method has been applied to a case of managing the process of power supply in an integrated biomass-municipal solid waste power plant. Useful solutions for the power supply management have been generated. Interval solutions associated with different risk levels of constraint violation have been obtained. The generated solutions can provide desired energy resource allocation with a minimized system cost, maximized system reliability and a maximized energy security. Tradeoffs between system costs and constraint-violation risks can also be tackled. Higher costs will increase system stability, while a desire for lower system costs will run into a risk of potential instability of the management system. They are helpful for supporting (a) adjustment or justification of allocation patterns of energy resources, and (b) analysis of interactions among economic cost, environmental requirement, and power supply security.

Suggested Citation

  • Wu, C.B. & Huang, G.H. & Li, W. & Xie, Y.L. & Xu, Y., 2015. "Multistage stochastic inexact chance-constraint programming for an integrated biomass-municipal solid waste power supply management under uncertainty," Renewable and Sustainable Energy Reviews, Elsevier, vol. 41(C), pages 1244-1254.
  • Handle: RePEc:eee:rensus:v:41:y:2015:i:c:p:1244-1254
    DOI: 10.1016/j.rser.2014.09.019
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S1364032114007928
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.rser.2014.09.019?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Cai, Y.P. & Huang, G.H. & Yang, Z.F. & Lin, Q.G. & Tan, Q., 2009. "Community-scale renewable energy systems planning under uncertainty--An interval chance-constrained programming approach," Renewable and Sustainable Energy Reviews, Elsevier, vol. 13(4), pages 721-735, May.
    2. Reddy, V. Siva & Kaushik, S.C. & Panwar, N.L., 2013. "Review on power generation scenario of India," Renewable and Sustainable Energy Reviews, Elsevier, vol. 18(C), pages 43-48.
    3. A. Charnes & W. W. Cooper, 1983. "Response to "Decision Problems Under Risk and Chance Constrained Programming: Dilemmas in the Transition"," Management Science, INFORMS, vol. 29(6), pages 750-753, June.
    4. Zare M., Yahia & Daneshmand, Ahmad, 1995. "A linear approximation method for solving a special class of the chance constrained programming problem," European Journal of Operational Research, Elsevier, vol. 80(1), pages 213-225, January.
    5. Xie, Y.L. & Li, Y.P. & Huang, G.H. & Li, Y.F., 2010. "An interval fixed-mix stochastic programming method for greenhouse gas mitigation in energy systems under uncertainty," Energy, Elsevier, vol. 35(12), pages 4627-4644.
    6. Pérez-Navarro, A. & Alfonso, D. & Álvarez, C. & Ibáñez, F. & Sánchez, C. & Segura, I., 2010. "Hybrid biomass-wind power plant for reliable energy generation," Renewable Energy, Elsevier, vol. 35(7), pages 1436-1443.
    7. Liu, Li-qun & Liu, Chun-xia & Sun, Zhi-yi & Han, Ru-cheng, 2011. "The development and application practice of neglected tidal energy in China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 15(2), pages 1089-1097, February.
    8. Zhao, Zhen-yu & Yan, Hong, 2012. "Assessment of the biomass power generation industry in China," Renewable Energy, Elsevier, vol. 37(1), pages 53-60.
    9. Watanabe, Tsunemi & Ellis, Hugh, 1994. "A joint chance-constrained programming model with row dependence," European Journal of Operational Research, Elsevier, vol. 77(2), pages 325-343, September.
    10. Li, Y.F. & Huang, G.H. & Li, Y.P. & Xu, Y. & Chen, W.T., 2010. "Regional-scale electric power system planning under uncertainty--A multistage interval-stochastic integer linear programming approach," Energy Policy, Elsevier, vol. 38(1), pages 475-490, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Palatnik, Ruslana Rachel & Freer, Mikhail & Levin, Mark & Golberg, Alexander & Zilberman, David, 2023. "Algae-Based Two-Stage Supply Chain with Co-Products," Ecological Economics, Elsevier, vol. 207(C).
    2. Sidik, Muhammad Abu Bakar & Shahroom, Hamizah Binti & Salam, Zainal & Buntat, Zokafle & Nawawi, Zainuddin & Ahmad, Hussein & Jambak, Muhammad ’Irfan & Arief, Yanuar Zulardiansyah, 2015. "Lightning monitoring system for sustainable energy supply: A review," Renewable and Sustainable Energy Reviews, Elsevier, vol. 48(C), pages 710-725.
    3. Khishtandar, Soheila, 2019. "Simulation based evolutionary algorithms for fuzzy chance-constrained biogas supply chain design," Applied Energy, Elsevier, vol. 236(C), pages 183-195.
    4. Yulei Xie & Linrui Wang & Guohe Huang & Dehong Xia & Ling Ji, 2018. "A Stochastic Inexact Robust Model for Regional Energy System Management and Emission Reduction Potential Analysis—A Case Study of Zibo City, China," Energies, MDPI, vol. 11(8), pages 1-24, August.
    5. Wencong Yue & Zhongqi Liu & Meirong Su & Meng Xu & Qiangqiang Rong & Chao Xu & Zhenkun Tan & Xuming Jiang & Zhixin Su & Yanpeng Cai, 2022. "Inclusion of Ecological Water Requirements in Optimization of Water Resource Allocation Under Changing Climatic Conditions," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 36(2), pages 551-570, January.
    6. Lixia H. Lambert & Eric A. DeVuyst & Burton C. English & Rodney Holcomb, 2021. "Analyzing the Trade-Offs between Meeting Biorefinery Production Capacity and Feedstock Supply Cost: A Chance Constrained Approach," Energies, MDPI, vol. 14(16), pages 1-13, August.
    7. Guan, Panbo & Huang, Guohe & Wu, Chuanbao & Wang, Linrui & Li, Chaoci & Wang, Yuanyi, 2019. "Analysis of emission taxes levying on regional electric power structure adjustment with an inexact optimization model - A case study of Zibo, China," Energy Economics, Elsevier, vol. 84(C).
    8. Yulei Xie & Zhenghui Fu & Dehong Xia & Wentao Lu & Guohe Huang & Han Wang, 2019. "Integrated Planning for Regional Electric Power System Management with Risk Measure and Carbon Emission Constraints: A Case Study of the Xinjiang Uygur Autonomous Region, China," Energies, MDPI, vol. 12(4), pages 1-14, February.
    9. Yin, J.N. & Huang, G.H. & Xie, Y.L. & An, Y.K., 2021. "Carbon-subsidized inter-regional electric power system planning under cost-risk tradeoff and uncertainty: A case study of Inner Mongolia, China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 135(C).
    10. Jinjin Gu & Quan Zhang & Dazhi Gu & Qingguo Zhang & Xiao Pu, 2018. "The Impact of Uncertainty Factors on Optimal Sizing and Costs of Low-Impact Development: a Case Study from Beijing, China," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 32(13), pages 4217-4238, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Li, Y.P. & Huang, G.H. & Chen, X., 2011. "An interval-valued minimax-regret analysis approach for the identification of optimal greenhouse-gas abatement strategies under uncertainty," Energy Policy, Elsevier, vol. 39(7), pages 4313-4324, July.
    2. Zhengping Liu & Wang Zhang & Hongxian Liu & Guohe Huang & Jiliang Zhen & Xin Qi, 2019. "Characterization of Renewable Energy Utilization Mode for Air-Environmental Quality Improvement through an Inexact Factorial Optimization Approach," Sustainability, MDPI, vol. 11(8), pages 1-19, April.
    3. Xie, Y.L. & Huang, G.H. & Li, W. & Ji, L., 2014. "Carbon and air pollutants constrained energy planning for clean power generation with a robust optimization model—A case study of Jining City, China," Applied Energy, Elsevier, vol. 136(C), pages 150-167.
    4. Huang, G. H., 1998. "A hybrid inexact-stochastic water management model," European Journal of Operational Research, Elsevier, vol. 107(1), pages 137-158, May.
    5. Li, G.C. & Huang, G.H. & Lin, Q.G. & Zhang, X.D. & Tan, Q. & Chen, Y.M., 2011. "Development of a GHG-mitigation oriented inexact dynamic model for regional energy system management," Energy, Elsevier, vol. 36(5), pages 3388-3398.
    6. Wang, Xingwei & Cai, Yanpeng & Chen, Jiajun & Dai, Chao, 2013. "A grey-forecasting interval-parameter mixed-integer programming approach for integrated electric-environmental management–A case study of Beijing," Energy, Elsevier, vol. 63(C), pages 334-344.
    7. Yulei Xie & Linrui Wang & Guohe Huang & Dehong Xia & Ling Ji, 2018. "A Stochastic Inexact Robust Model for Regional Energy System Management and Emission Reduction Potential Analysis—A Case Study of Zibo City, China," Energies, MDPI, vol. 11(8), pages 1-24, August.
    8. Yong Zeng & Yanpeng Cai & Guohe Huang & Jing Dai, 2011. "A Review on Optimization Modeling of Energy Systems Planning and GHG Emission Mitigation under Uncertainty," Energies, MDPI, vol. 4(10), pages 1-33, October.
    9. Cao, M.F. & Huang, G.H. & Lin, Q.G., 2010. "Integer programming with random-boundary intervals for planning municipal power systems," Applied Energy, Elsevier, vol. 87(8), pages 2506-2516, August.
    10. Dong, C. & Huang, G.H. & Cai, Y.P. & Liu, Y., 2012. "An inexact optimization modeling approach for supporting energy systems planning and air pollution mitigation in Beijing city," Energy, Elsevier, vol. 37(1), pages 673-688.
    11. Li, Y.F. & Li, Y.P. & Huang, G.H. & Chen, X., 2010. "Energy and environmental systems planning under uncertainty--An inexact fuzzy-stochastic programming approach," Applied Energy, Elsevier, vol. 87(10), pages 3189-3211, October.
    12. Kim, Seunghyok & Koo, Jamin & Lee, Chang Jun & Yoon, En Sup, 2012. "Optimization of Korean energy planning for sustainability considering uncertainties in learning rates and external factors," Energy, Elsevier, vol. 44(1), pages 126-134.
    13. Chen, Yizhong & Lu, Hongwei & Li, Jing & Huang, Guohe & He, Li, 2016. "Regional planning of new-energy systems within multi-period and multi-option contexts: A case study of Fengtai, Beijing, China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 65(C), pages 356-372.
    14. Pereira, Sérgio & Ferreira, Paula & Vaz, A.I.F., 2016. "Optimization modeling to support renewables integration in power systems," Renewable and Sustainable Energy Reviews, Elsevier, vol. 55(C), pages 316-325.
    15. Chen, Yizhong & He, Li & Li, Jing & Cheng, Xi & Lu, Hongwei, 2016. "An inexact bi-level simulation–optimization model for conjunctive regional renewable energy planning and air pollution control for electric power generation systems," Applied Energy, Elsevier, vol. 183(C), pages 969-983.
    16. Chen, F. & Huang, G.H. & Fan, Y.R. & Chen, J.P., 2017. "A copula-based fuzzy chance-constrained programming model and its application to electric power generation systems planning," Applied Energy, Elsevier, vol. 187(C), pages 291-309.
    17. Wu, Zhibin & Xu, Jiuping, 2013. "Predicting and optimization of energy consumption using system dynamics-fuzzy multiple objective programming in world heritage areas," Energy, Elsevier, vol. 49(C), pages 19-31.
    18. Zhang, Xiaoyue & Huang, Guohe & Xie, Yulei & Liu, Lirong & Song, Tangnyu, 2022. "A coupled non-deterministic optimization and mixed-level factorial analysis model for power generation expansion planning – A case study of Jing-Jin-Ji metropolitan region, China," Applied Energy, Elsevier, vol. 311(C).
    19. Wang, Xingwei & Cai, Yanpeng & Dai, Chao, 2014. "Evaluating China's biomass power production investment based on a policy benefit real options model," Energy, Elsevier, vol. 73(C), pages 751-761.
    20. Xie, Y.L. & Xia, D.H. & Ji, L. & Zhou, W.N. & Huang, G.H., 2017. "An inexact cost-risk balanced model for regional energy structure adjustment management and resources environmental effect analysis-a case study of Shandong province, China," Energy, Elsevier, vol. 126(C), pages 374-391.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:rensus:v:41:y:2015:i:c:p:1244-1254. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/600126/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.