The impact of preventive maintenance on system cost and buffer size
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Cheng, Guo Qing & Zhou, Bing Hai & Li, Ling, 2018. "Integrated production, quality control and condition-based maintenance for imperfect production systems," Reliability Engineering and System Safety, Elsevier, vol. 175(C), pages 251-264.
- Chelbi, Anis & Ait-Kadi, Daoud, 2004. "Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance," European Journal of Operational Research, Elsevier, vol. 156(3), pages 712-718, August.
- Wee, Hui Ming & Widyadana, Gede Agus, 2013. "Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales," International Journal of Production Economics, Elsevier, vol. 143(2), pages 574-579.
- Zhang, Ning & Qi, Faqun & Zhang, Chengjie & Zhou, Hongming, 2022. "Joint optimization of condition-based maintenance policy and buffer capacity for a two-unit series system," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
- P Viveros & E Zio & F Kristjanpoller & A Arata, 2012. "Integrated system reliability and productive capacity analysis of a production line. A case study for a Chilean mining process," Journal of Risk and Reliability, , vol. 226(3), pages 305-317, June.
- Bertazzi, Luca, 2011. "Determining the optimal dimension of a work-in-process storage area," International Journal of Production Economics, Elsevier, vol. 131(2), pages 483-489, June.
- Hung, Yick-Hin & Li, Leon Y.O. & Cheng, T.C.E., 2022. "Uncovering hidden capacity in overall equipment effectiveness management," International Journal of Production Economics, Elsevier, vol. 248(C).
- Ribeiro, M.A. & Silveira, J.L. & Qassim, R.Y., 2007. "Joint optimisation of maintenance and buffer size in a manufacturing system," European Journal of Operational Research, Elsevier, vol. 176(1), pages 405-413, January.
- Jin, Xiaoning & Li, Lin & Ni, Jun, 2009. "Option model for joint production and preventive maintenance system," International Journal of Production Economics, Elsevier, vol. 119(2), pages 347-353, June.
- Zequeira, Romulo I. & Valdes, Jose E. & Berenguer, Christophe, 2008. "Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability," International Journal of Production Economics, Elsevier, vol. 111(2), pages 686-696, February.
- Maria Chiara Magnanini & Tullio Tolio, 2020. "Switching- and hedging- point policy for preventive maintenance with degrading machines: application to a two-machine line," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 241-271, June.
- Chelbi, Anis & Rezg, Nidhal, 2006. "Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 131-143, February.
- Thomas Sloan, 2008. "Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(2), pages 116-129, March.
- Borrero, J.S. & Akhavan-Tabatabaei, R., 2013. "Time and inventory dependent optimal maintenance policies for single machine workstations: An MDP approach," European Journal of Operational Research, Elsevier, vol. 228(3), pages 545-555.
- Shuyuan Gan & Xinzhou Zhang & Lan Chen, 2022. "Maintenance optimization of a production system considering defect prevention and spare parts ordering," Journal of Risk and Reliability, , vol. 236(5), pages 893-906, October.
- Lisa M. Maillart & Xiang Fang, 2006. "Optimal maintenance policies for serial, multi‐machine systems with non‐instantaneous repairs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(8), pages 804-813, December.
- Nabil Nahas, 2017. "Buffer allocation and preventive maintenance optimization in unreliable production lines," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 85-93, January.
- Dimitrakos, T.D. & Kyriakidis, E.G., 2008. "A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times," International Journal of Production Economics, Elsevier, vol. 111(2), pages 752-762, February.
- Cormier, Gilles & Rezg, Nidhal, 2009. "An integrated production planning model for molds and end items," International Journal of Production Economics, Elsevier, vol. 121(1), pages 68-71, September.
- A. Azadeh & M. Sheikhalishahi & S. Mortazavi & E. Ahmadi Jooghi, 2017. "Joint quality control and preventive maintenance strategy: a unique taguchi approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 123-134, March.
- Kyriakidis, E.G. & Dimitrakos, T.D., 2006. "Optimal preventive maintenance of a production system with an intermediate buffer," European Journal of Operational Research, Elsevier, vol. 168(1), pages 86-99, January.
- Karamatsoukis, C.C. & Kyriakidis, E.G., 2010. "Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer," European Journal of Operational Research, Elsevier, vol. 207(1), pages 297-308, November.
- Tarakci, Hakan & Kulkarni, Shailesh & Ozdemir, Zafer D., 2018. "The impact of wearable devices and performance payments on health outcomes," International Journal of Production Economics, Elsevier, vol. 200(C), pages 291-301.
- Shuyuan Gan & Bolun Wang & Zhifang Song, 2021. "A Combined Maintenance Strategy Considering Spares, Buffer, and Quality," Journal of Risk and Reliability, , vol. 235(3), pages 431-445, June.
- Kiesmüller, G.P. & Sachs, F.E., 2020. "Spare parts or buffer? How to design a transfer line with unreliable machines," European Journal of Operational Research, Elsevier, vol. 284(1), pages 121-134.
- Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
Printed from https://ideas.repec.org/r/eee/ejores/v95y1996i3p577-591.html