IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v147y2003i2p231-252.html

Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Maryam Rezakhanlou & Seyed Mohammad Javad Mirzapour Al-e-Hashem, 2025. "A dual-channel multi-objective green supply chain network design considering pricing and transportation mode choice under fuzzy uncertainty," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 27(5), pages 10341-10372, May.
  2. Yakhchali, Siamak Haji & Ghodsypour, Seyed Hassan, 2010. "Computing latest starting times of activities in interval-valued networks with minimal time lags," European Journal of Operational Research, Elsevier, vol. 200(3), pages 874-880, February.
  3. Black, Gary W. & McKay, Kenneth N. & Morton, Thomas E., 2006. "Aversion scheduling in the presence of risky jobs," European Journal of Operational Research, Elsevier, vol. 175(1), pages 338-361, November.
  4. Alireza Goli & Ali Ala & Seyedali Mirjalili, 2023. "A robust possibilistic programming framework for designing an organ transplant supply chain under uncertainty," Annals of Operations Research, Springer, vol. 328(1), pages 493-530, September.
  5. Mahsa Pouraliakbari-Mamaghani & Ali Ghodratnama & Seyed Hamid Reza Pasandideh & Ahmed Saif, 2022. "A robust possibilistic programming approach for blood supply chain network design in disaster relief considering congestion," Operational Research, Springer, vol. 22(3), pages 1987-2032, July.
  6. Ghanbarzadeh-Shams, M. & Ghasemy Yaghin, R. & Sadeghi, A.H., 2022. "A hybrid fuzzy multi-objective model for carpet production planning with reverse logistics under uncertainty," Socio-Economic Planning Sciences, Elsevier, vol. 83(C).
  7. Yang, Zijing & Liu, Songsong, 2025. "Fairness-oriented multi-objective optimization of supply chain planning under uncertainties," Socio-Economic Planning Sciences, Elsevier, vol. 99(C).
  8. Guillaume, Romain & Houé, Raymond & Grabot, Bernard, 2014. "Robust competence assessment for job assignment," European Journal of Operational Research, Elsevier, vol. 238(2), pages 630-644.
  9. Wang, Juite & Shu, Yun-Feng, 2007. "A possibilistic decision model for new product supply chain design," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1044-1061, March.
  10. Peidro, David & Mula, Josefa & Jiménez, Mariano & del Mar Botella, Ma, 2010. "A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment," European Journal of Operational Research, Elsevier, vol. 205(1), pages 65-80, August.
  11. Kasperski, Adam & Zielinski, Pawel, 2010. "Minmax regret approach and optimality evaluation in combinatorial optimization problems with interval and fuzzy weights," European Journal of Operational Research, Elsevier, vol. 200(3), pages 680-687, February.
  12. He-Yau Kang & Amy H. I. Lee & Tzu-Ting Huang, 2016. "Project Management for a Wind Turbine Construction by Applying Fuzzy Multiple Objective Linear Programming Models," Energies, MDPI, vol. 9(12), pages 1-15, December.
  13. Bjork, Kaj-Mikael & Carlsson, Christer, 2007. "The effect of flexible lead times on a paper producer," International Journal of Production Economics, Elsevier, vol. 107(1), pages 139-150, May.
  14. Kasperski, Adam & Zielinski, Pawel, 2007. "On combinatorial optimization problems on matroids with uncertain weights," European Journal of Operational Research, Elsevier, vol. 177(2), pages 851-864, March.
  15. Lee, Sangbok & Yih, Yuehwern, 2014. "Reducing patient-flow delays in surgical suites through determining start-times of surgical cases," European Journal of Operational Research, Elsevier, vol. 238(2), pages 620-629.
  16. Bhaskar, Tarun & Pal, Manabendra N. & Pal, Asim K., 2011. "A heuristic method for RCPSP with fuzzy activity times," European Journal of Operational Research, Elsevier, vol. 208(1), pages 57-66, January.
  17. Mok, P.Y. & Kwong, C.K. & Wong, W.K., 2007. "Optimisation of fault-tolerant fabric-cutting schedules using genetic algorithms and fuzzy set theory," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1876-1893, March.
  18. Marc Asunción & Luis Castillo & Juan Fernández-Olivares & Oscar García-Pérez & Antonio González & Francisco Palao, 2007. "Handling fuzzy temporal constraints in a planning environment," Annals of Operations Research, Springer, vol. 155(1), pages 391-415, November.
  19. Yongbo Li & Devika Kannan & P. C. Jha & Kiran Garg & Jyoti Darbari & Neha Agarwal, 2023. "Design of a multi echelon product recovery embeded reverse logistics network for multi products and multi periods," Annals of Operations Research, Springer, vol. 323(1), pages 131-152, April.
  20. Seddik, Yasmina & Hanzálek, Zdenek, 2017. "Match-up scheduling of mixed-criticality jobs: Maximizing the probability of jobs execution," European Journal of Operational Research, Elsevier, vol. 262(1), pages 46-59.
  21. Igor KREJČÍ & Milan HOUŠKA, 2014. "Discussion with the paper 'Project costs planning in the conditions of uncertainty' by H. Štiková," Agricultural Economics, Czech Academy of Agricultural Sciences, vol. 60(11), pages 517-523.
  22. Bocewicz Grzegorz & Banaszak Zbigniew, 2009. "Abductive Reasoning Driven Approach to Project - Like Production Flow Prototyping," Foundations of Management, Sciendo, vol. 1(1), pages 43-62, January.
  23. Dubois, Didier & Fargier, Helene & Galvagnon, Vincent, 2003. "On latest starting times and floats in activity networks with ill-known durations," European Journal of Operational Research, Elsevier, vol. 147(2), pages 266-280, June.
  24. Tsao, Yu-Chung & Thanh, Vo-Van, 2021. "Toward sustainable microgrids with blockchain technology-based peer-to-peer energy trading mechanism: A fuzzy meta-heuristic approach," Renewable and Sustainable Energy Reviews, Elsevier, vol. 136(C).
  25. Relich Marcin, 2012. "An evaluation of project completion with application of fuzzy set theory," Management, Sciendo, vol. 16(1), pages 216-229, May.
  26. Tsao, Yu-Chung & Thanh, Vo-Van, 2019. "A multi-objective mixed robust possibilistic flexible programming approach for sustainable seaport-dry port network design under an uncertain environment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 124(C), pages 13-39.
  27. Omid Jadidi & Fatemeh Firouzi & John S. Loucks & Yong Shin Park, 2022. "Multi-criteria supplier selection problem with fuzzy demand: a newsvendor model," Computational Management Science, Springer, vol. 19(3), pages 375-394, July.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.