An inventory model for deteriorating items with imperfect quality under advance payment policy
Author
Abstract
Suggested Citation
DOI: 10.37190/ord210306
Download full text from publisher
References listed on IDEAS
- Tiwari, Sunil & Cárdenas-Barrón, Leopoldo Eduardo & Goh, Mark & Shaikh, Ali Akbar, 2018. "Joint pricing and inventory model for deteriorating items with expiration dates and partial backlogging under two-level partial trade credits in supply chain," International Journal of Production Economics, Elsevier, vol. 200(C), pages 16-36.
- Papachristos, S. & Konstantaras, I., 2006. "Economic ordering quantity models for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 100(1), pages 148-154, March.
- Mohsen Lashgari & Ata Taleizadeh & Abbas Ahmadi, 2016. "Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain," Annals of Operations Research, Springer, vol. 238(1), pages 329-354, March.
- Chunming Xu & Xiaojie Liu & Chenchen Wu & Baiyun Yuan, 2020. "Optimal Inventory Control Strategies for Deteriorating Items with a General Time-Varying Demand under Carbon Emission Regulations," Energies, MDPI, vol. 13(4), pages 1-20, February.
- Zhang, Qinhong & Zhang, Dali & Tsao, Yu-Chung & Luo, Jianwen, 2016. "Optimal ordering policy in a two-stage supply chain with advance payment for stable supply capacity," International Journal of Production Economics, Elsevier, vol. 177(C), pages 34-43.
- Chandra K. Jaggi & Sunil Tiwari & Satish K. Goel, 2017. "Credit financing in economic ordering policies for non-instantaneous deteriorating items with price dependent demand and two storage facilities," Annals of Operations Research, Springer, vol. 248(1), pages 253-280, January.
- Liang-Yuh Ouyang & Chun-Tao Chang & Philip Shum, 2012. "The EOQ with defective items and partially permissible delay in payments linked to order quantity derived algebraically," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 20(1), pages 141-160, March.
- Goyal, Suresh Kumar & Cardenas-Barron, Leopoldo Eduardo, 2002. "Note on: Economic production quantity model for items with imperfect quality - a practical approach," International Journal of Production Economics, Elsevier, vol. 77(1), pages 85-87, May.
- Pourmohammad Zia, Nadia & Taleizadeh, Ata Allah, 2015. "A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 82(C), pages 19-37.
- Aditi Khanna & Aakanksha Kishore & Biswajit Sarkar & Chandra K. Jaggi, 2018. "Supply Chain with Customer-Based Two-Level Credit Policies under an Imperfect Quality Environment," Mathematics, MDPI, vol. 6(12), pages 1-35, December.
- Harun Sulak & Abdullah Eroglu & Mustafa Bayhan & M. Ali Avci, 2015. "An Economic Order Quantity Model for Defective Items under Permissible Delay in Payments and Shortage," International Journal of Academic Research in Business and Social Sciences, Human Resource Management Academic Research Society, International Journal of Academic Research in Business and Social Sciences, vol. 5(1), pages 302-316, January.
- Ali Akbar Shaikh & Gobinda Chandra Panda & Md. Al-Amin Khan & Abu Hashan Md. Mashud & Amiya Biswas, 2020. "An inventory model for deteriorating items with preservation facility of ramp type demand and trade credit," International Journal of Mathematics in Operational Research, Inderscience Enterprises Ltd, vol. 17(4), pages 514-551.
- M Ben-Daya & M Hariga, 2000. "Economic lot scheduling problem with imperfect production processes," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(7), pages 875-881, July.
- Khan, M. & Jaber, M.Y. & Guiffrida, A.L. & Zolfaghari, S., 2011. "A review of the extensions of a modified EOQ model for imperfect quality items," International Journal of Production Economics, Elsevier, vol. 132(1), pages 1-12, July.
- Zhang, Alex X., 1996. "Optimal advance payment scheme involving fixed per-payment costs," Omega, Elsevier, vol. 24(5), pages 577-582, October.
- Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
- Mohsen Lashgari & Ata Allah Taleizadeh & Abbas Ahmadi, 2016. "Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain," Annals of Operations Research, Springer, vol. 238(1), pages 329-354, March.
- Md. Al-Amin Khan & Ali Akbar Shaikh & Gobinda Chandra Panda & Asoke Kumar Bhunia & Ioannis Konstantaras, 2020. "Non-instantaneous deterioration effect in ordering decisions for a two-warehouse inventory system under advance payment and backlogging," Annals of Operations Research, Springer, vol. 289(2), pages 243-275, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ata Allah Taleizadeh & Sara Tavassoli & Arijit Bhattacharya, 2020. "Inventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backordering," Annals of Operations Research, Springer, vol. 287(1), pages 403-437, April.
- Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
- Khan, Md. Al-Amin & Shaikh, Ali Akbar & Cárdenas-Barrón, Leopoldo Eduardo, 2021. "An inventory model under linked-to-order hybrid partial advance payment, partial credit policy, all-units discount and partial backlogging with capacity constraint," Omega, Elsevier, vol. 103(C).
- Lie-Fern Hsu & Jia-Tzer Hsu, 2016. "Economic production quantity (EPQ) models under an imperfect production process with shortages backordered," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(4), pages 852-867, March.
- József Vörös, 2013. "Economic order and production quantity models without constraint on the percentage of defective items," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(4), pages 867-885, December.
- Naoufel Cheikhrouhou & Biswajit Sarkar & Baishakhi Ganguly & Asif Iqbal Malik & Rafael Batista & Young Hae Lee, 2018. "Optimization of sample size and order size in an inventory model with quality inspection and return of defective items," Annals of Operations Research, Springer, vol. 271(2), pages 445-467, December.
- Kelle, Peter & Transchel, Sandra & Minner, Stefan, 2009. "Buyer-supplier cooperation and negotiation support with random yield consideration," International Journal of Production Economics, Elsevier, vol. 118(1), pages 152-159, March.
- Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
- Rezaei, Jafar & Salimi, Negin, 2012. "Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier," International Journal of Production Economics, Elsevier, vol. 137(1), pages 11-18.
- Jaber, Mohamad Y. & Zanoni, Simone & Zavanella, Lucio E., 2014. "Economic order quantity models for imperfect items with buy and repair options," International Journal of Production Economics, Elsevier, vol. 155(C), pages 126-131.
- Mehmood Khan & Matloub Hussain & Leopoldo Eduardo Cárdenas-Barrón, 2017. "Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4816-4832, August.
- Chang Wook Kang & Misbah Ullah & Mitali Sarkar & Muhammad Omair & Biswajit Sarkar, 2019. "A Single-Stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders," Mathematics, MDPI, vol. 7(5), pages 1-18, May.
- Wu, Chengfeng & Liu, Xin & Li, Annan, 2021. "A loss-averse retailer–supplier supply chain model under trade credit in a supplier-Stackelberg game," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 182(C), pages 353-365.
- Skouri, K. & Konstantaras, I. & Lagodimos, A.G. & Papachristos, S., 2014. "An EOQ model with backorders and rejection of defective supply batches," International Journal of Production Economics, Elsevier, vol. 155(C), pages 148-154.
- Nasr, Walid W. & Maddah, Bacel & Salameh, Moueen K., 2013. "EOQ with a correlated binomial supply," International Journal of Production Economics, Elsevier, vol. 144(1), pages 248-255.
- Leopoldo Eduardo Cárdenas-Barrón & María José Lea Plaza-Makowsky & María Alejandra Sevilla-Roca & José María Núñez-Baumert & Buddhadev Mandal, 2021. "An Inventory Model for Imperfect Quality Products with Rework, Distinct Holding Costs, and Nonlinear Demand Dependent on Price," Mathematics, MDPI, vol. 9(12), pages 1-20, June.
- Khan, Md. Al-Amin & Cárdenas-Barrón, Leopoldo Eduardo & Treviño-Garza, Gerardo & Céspedes-Mota, Armando, 2023. "Installment for advance payment and pricing decisions for an inventory system under power demand pattern and all-units discount," International Journal of Production Economics, Elsevier, vol. 265(C).
- Taleizadeh, Ata Allah & Khanbaglo, Mahboobeh Perak Sari & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "An EOQ inventory model with partial backordering and reparation of imperfect products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 418-434.
- B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
- Li, Ruihai & Skouri, Konstantina & Teng, Jinn-Tsair & Yang, Wen-Goang, 2018. "Seller's optimal replenishment policy and payment term among advance, cash, and credit payments," International Journal of Production Economics, Elsevier, vol. 197(C), pages 35-42.
More about this item
Keywords
advance payment; imperfect items; screening rate; deterioration; discount; price-dependent demand;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wut:journl:v:31:y:2021:i:3:p:109-135:id:1602. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Adam Kasperski (email available below). General contact details of provider: https://edirc.repec.org/data/iopwrpl.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.