IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v58y2011i7p685-704.html
   My bibliography  Save this article

Approximation methods for the analysis of a multicomponent, multiproduct assemble‐to‐order system

Author

Listed:
  • Ke Fu
  • Vernon N. Hsu
  • Chung‐Yee Lee

Abstract

In this article, we consider the performance evaluation of a multicomponent, multiproduct assemble‐to‐order (ATO) system. Each component is managed independently using a base‐stock policy at a supply facility with limited production capacity and an infinite buffer. The arrivals of demands follow a multivariate Poisson process and unfilled demands are backlogged. Because exact analysis of the proposed system is not feasible, we propose two approximation methods which provide upper and lower bounds for various performance measures such as fill rate, average waiting time, and average number of backorders of the proposed system. Our computational experiments demonstrate the effectiveness of the two approximation methods under various system settings. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011

Suggested Citation

  • Ke Fu & Vernon N. Hsu & Chung‐Yee Lee, 2011. "Approximation methods for the analysis of a multicomponent, multiproduct assemble‐to‐order system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(7), pages 685-704, October.
  • Handle: RePEc:wly:navres:v:58:y:2011:i:7:p:685-704
    DOI: 10.1002/nav.20479
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/nav.20479
    Download Restriction: no

    File URL: https://libkey.io/10.1002/nav.20479?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Nico van Dijk, 1998. "Bounds and error bounds for queueing networks," Annals of Operations Research, Springer, vol. 79(0), pages 295-319, January.
    2. Yong-Joo Lee & Paul Zipkin, 1995. "Processing Networks with Inventories: Sequential Refinement Systems," Operations Research, INFORMS, vol. 43(6), pages 1025-1036, December.
    3. Jing-Sheng Song & Susan H. Xu & Bin Liu, 1999. "Order-Fulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes," Operations Research, INFORMS, vol. 47(1), pages 131-149, February.
    4. Savas Dayanik & Jing-Sheng Song & Susan H. Xu, 2003. "The Effectiveness of Several Performance Bounds for Capacitated Production, Partial-Order-Service, Assemble-to-Order Systems," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 230-251, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. ElHafsi, Mohsen & Fang, Jianxin & Hamouda, Essia, 2020. "A novel decomposition-based method for solving general-product structure assemble-to-order systems," European Journal of Operational Research, Elsevier, vol. 286(1), pages 233-249.
    2. Mohammed Hichame Benbitour & Evren Sahin & Yves Dallery, 2019. "The use of rush deliveries in periodic review assemble-to-order systems," Post-Print hal-01997380, HAL.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ana Bušić & Ingrid Vliegen & Alan Scheller-Wolf, 2012. "Comparing Markov Chains: Aggregation and Precedence Relations Applied to Sets of States, with Applications to Assemble-to-Order Systems," Mathematics of Operations Research, INFORMS, vol. 37(2), pages 259-287, May.
    2. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    3. Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
    4. Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
    5. Gao, Chunyan & Shen, Houcai & Cheng, T.C.E., 2010. "Order-fulfillment performance analysis of an assemble-to-order system with unreliable machines," International Journal of Production Economics, Elsevier, vol. 126(2), pages 341-349, August.
    6. Yao Zhao & David Simchi-Levi, 2006. "Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times," Operations Research, INFORMS, vol. 54(4), pages 706-724, August.
    7. Elhafsi, Mohsen & Hamouda, Essia, 2015. "Managing an assemble-to-order system with after sales market for components," European Journal of Operational Research, Elsevier, vol. 242(3), pages 828-841.
    8. ElHafsi, Mohsen, 2009. "Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes," European Journal of Operational Research, Elsevier, vol. 194(1), pages 127-142, April.
    9. Saif Benjaafar & Mohsen ElHafsi, 2006. "Production and Inventory Control of a Single Product Assemble-to-Order System with Multiple Customer Classes," Management Science, INFORMS, vol. 52(12), pages 1896-1912, December.
    10. Sleptchenko, Andrei & Al Hanbali, Ahmad & Zijm, Henk, 2018. "Joint planning of service engineers and spare parts," European Journal of Operational Research, Elsevier, vol. 271(1), pages 97-108.
    11. S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
    12. Gregory A. DeCroix & Jing-Sheng Song & Paul H. Zipkin, 2009. "Managing an Assemble-to-Order System with Returns," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 144-159, October.
    13. Sen Lin & Bo Li & Antonio Arreola-Risa & Yiwei Huang, 2023. "Optimizing a single-product production-inventory system under constant absolute risk aversion," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 31(3), pages 510-537, October.
    14. Xiao, Yongbo & Chen, Jian & Lee, Chung-Yee, 2010. "Optimal decisions for assemble-to-order systems with uncertain assembly capacity," International Journal of Production Economics, Elsevier, vol. 123(1), pages 155-165, January.
    15. Jing-Sheng Song, 2000. "A Note on Assemble-to-Order Systems with Batch Ordering," Management Science, INFORMS, vol. 46(5), pages 739-743, May.
    16. Ke Fu & Vernon Ning Hsu & Chung-Yee Lee, 2006. "Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity," Operations Research, INFORMS, vol. 54(6), pages 1137-1150, December.
    17. van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
    18. Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
    19. Kai Huang, 2014. "Benchmarking non-first-come-first-served component allocation in an assemble-to-order system," Annals of Operations Research, Springer, vol. 223(1), pages 217-237, December.
    20. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:58:y:2011:i:7:p:685-704. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.