IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v23y2005i7p697-712.html
   My bibliography  Save this article

The JIT materials management system in developing countries

Author

Listed:
  • Gul Polat
  • David Arditi

Abstract

The just-in-time (JIT) approach to materials management appears to be superior to a just-in-case (JIC) approach in terms of reducing cost and improving productivity under most circumstances encountered in industrialized countries. However, is it truly more advantageous than the more commonly used approaches in developing countries? Contractors in developing countries may be compelled to keep excessive inventory under some circumstances to help manage uncertainty in the supply chain and production process, high inflation rates, available discounts on prices of large amounts of materials, and price cuts in case of early purchasing. This study presents a comparison of the JIT and JIC materials management systems in terms of total cost of inventory by means of a simulation model that makes use of actual data obtained from an ongoing trade centre project in Istanbul, Turkey. The study suggests that had the JIT system been used in the project in Istanbul the total cost of inventory would have been 4.4% higher than the total cost of inventory in the JIC system currently used.

Suggested Citation

  • Gul Polat & David Arditi, 2005. "The JIT materials management system in developing countries," Construction Management and Economics, Taylor & Francis Journals, vol. 23(7), pages 697-712.
  • Handle: RePEc:taf:conmgt:v:23:y:2005:i:7:p:697-712
    DOI: 10.1080/01446190500041388
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190500041388
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190500041388?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Eric Wong & George Norman, 1997. "Economic evaluation of materials planning systems for construction," Construction Management and Economics, Taylor & Francis Journals, vol. 15(1), pages 39-47.
    2. Low Sui Pheng & Mok Sze Hui, 1999. "The application of JIT philosophy to construction: a case study in site layout," Construction Management and Economics, Taylor & Francis Journals, vol. 17(5), pages 657-668.
    3. Andrew Agapiou & Roger Flanagan & George Norman & David Notman, 1998. "The changing role of builders merchants in the construction supply chain," Construction Management and Economics, Taylor & Francis Journals, vol. 16(3), pages 351-361.
    4. Low Sui Pheng & Stephanie Tan, 1998. "How 'just-in-time' wastages can be quantified: case study of a private condominium project," Construction Management and Economics, Taylor & Francis Journals, vol. 16(6), pages 621-635.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jahangirian, Mohsen & Eldabi, Tillal & Naseer, Aisha & Stergioulas, Lampros K. & Young, Terry, 2010. "Simulation in manufacturing and business: A review," European Journal of Operational Research, Elsevier, vol. 203(1), pages 1-13, May.
    2. Andreas C. Nearchou, 2018. "Multicriteria scheduling optimization using an elitist multiobjective population heuristic: the h-NSDE algorithm," Journal of Heuristics, Springer, vol. 24(6), pages 817-851, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Qingbin Cui & Makarand Hastak & Daniel Halpin, 2010. "Systems analysis of project cash flow management strategies," Construction Management and Economics, Taylor & Francis Journals, vol. 28(4), pages 361-376.
    2. Anna Dubois & Lars-Erik Gadde, 2002. "The construction industry as a loosely coupled system: implications for productivity and innovation," Construction Management and Economics, Taylor & Francis Journals, vol. 20(7), pages 621-631.
    3. Kamal Dhawan & John E. Tookey & Ali GhaffarianHoseini & Mani Poshdar, 2024. "Monetised sustainability impacts of integrated planning in the manufactured construction products industry: A transport perspective from New Zealand," Journal of Economic Analysis, Anser Press, vol. 3(4), pages 161-185, December.
    4. Kamal Dhawan & John E. Tookey & Ali GhaffarianHoseini & Mani Poshdar, 2023. "Using Transport to Quantify the Impact of Vertical Integration on the Construction Supply Chain: A New Zealand Assessment," Sustainability, MDPI, vol. 15(2), pages 1-26, January.
    5. da Cunha, Richard Alex & Rangel, Luís Alberto Duncan & Rudolf, Christian A. & Santos, Luiza dos, 2022. "A decision support approach employing the PROMETHEE method and risk factors for critical supply assessment in large-scale projects," Operations Research Perspectives, Elsevier, vol. 9(C).
    6. D. K. Choudhury, 2020. "Modelling of Materials Management System for Cross-country Pipeline Project from Client’s Perspective," Metamorphosis: A Journal of Management Research, , vol. 19(2), pages 106-120, December.
    7. Gul Polat & David Arditi & Glenn Ballard & Ugur Mungen, 2006. "Economics of on-site vs. off-site fabrication of rebar," Construction Management and Economics, Taylor & Francis Journals, vol. 24(11), pages 1185-1198.
    8. Dirk Lindebaum & Susan Cartwright, 2010. "A Critical Examination of the Relationship between Emotional Intelligence and Transformational Leadership," Journal of Management Studies, Wiley Blackwell, vol. 47(7), pages 1317-1342, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:23:y:2005:i:7:p:697-712. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.