Economic design of T 2 control charts with the VSSI sampling scheme
Author
Abstract
Suggested Citation
DOI: 10.1007/s11135-007-9101-7
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Chen, Yan-Kwang, 2004. "Economic design of control charts for non-normal data using variable sampling policy," International Journal of Production Economics, Elsevier, vol. 92(1), pages 61-74, November.
- Antonio Costa & M. A. Rahim, 2001. "Economic design of X charts with variable parameters: The Markov chain approach," Journal of Applied Statistics, Taylor & Francis Journals, vol. 28(7), pages 875-885.
- Douglas C. Montgomery & Phillip J. Klatt, 1972. "Economic Design of T 2 Control Charts to Maintain Current Control of a Process," Management Science, INFORMS, vol. 19(1), pages 76-89, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- M. Abolmohammadi & A. Seif & M. H. Behzadi & M. B. Moghadam, 2021. "Economic statistical design of adaptive $$\bar{X}$$ X ¯ control charts based on quality loss functions," Operational Research, Springer, vol. 21(2), pages 1041-1080, June.
- Celano, Giovanni & De Magalhães, Maysa S. & Costa, Antonio F.B. & Fichera, Sergio, 2011. "A stochastic shift model for economically designed charts constrained by the process stage configuration," International Journal of Production Economics, Elsevier, vol. 132(2), pages 315-325, August.
- Alireza Faraz & R. Kazemzadeh & M. Moghadam & Ahmad Parsian, 2012. "On the advantages of economically designed variable sample sizes and sampling intervals T 2 control chart: double warning lines scheme," Quality & Quantity: International Journal of Methodology, Springer, vol. 46(4), pages 1323-1336, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Xiao, Xiao & Jiang, Wei & Luo, Jianwen, 2019. "Combining process and product information for quality improvement," International Journal of Production Economics, Elsevier, vol. 207(C), pages 130-143.
- Y-K Chen, 2007. "Economic design of an adaptive T 2 control chart," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(3), pages 337-345, March.
- Liang Liu & Cong Feng & Hongwei Zhang & Xuehua Zhang, 2015. "Game Analysis and Simulation of the River Basin Sustainable Development Strategy Integrating Water Emission Trading," Sustainability, MDPI, vol. 7(5), pages 1-21, April.
- Naderkhani, Farnoosh & Makis, Viliam, 2016. "Economic design of multivariate Bayesian control chart with two sampling intervals," International Journal of Production Economics, Elsevier, vol. 174(C), pages 29-42.
- Yang, S.F. & Rahim, M.A., 2005. "Economic statistical process control for multivariate quality characteristics under Weibull shock model," International Journal of Production Economics, Elsevier, vol. 98(2), pages 215-226, November.
- Alireza Faraz & R. Kazemzadeh & M. Moghadam & Ahmad Parsian, 2012. "On the advantages of economically designed variable sample sizes and sampling intervals T 2 control chart: double warning lines scheme," Quality & Quantity: International Journal of Methodology, Springer, vol. 46(4), pages 1323-1336, June.
- Lim, S.L. & Khoo, Michael B.C. & Teoh, W.L. & Xie, M., 2015. "Optimal designs of the variable sample size and sampling interval X¯ chart when process parameters are estimated," International Journal of Production Economics, Elsevier, vol. 166(C), pages 20-35.
- Liu, J.Y. & Xie, M. & Goh, T.N. & Liu, Q.H. & Yang, Z.H., 2006. "Cumulative count of conforming chart with variable sampling intervals," International Journal of Production Economics, Elsevier, vol. 101(2), pages 286-297, June.
- Asghar Seif & Alireza Faraz & C�dric Heuchenne & Erwin Saniga & M. B. Moghadam, 2011. "A modified economic-statistical design of the T-super-2 control chart with variable sample sizes and control limits," Journal of Applied Statistics, Taylor & Francis Journals, vol. 38(11), pages 2459-2469, January.
- Chen, Yan-Kwang, 2007. "Adaptive sampling enhancement for Hotelling's T2 charts," European Journal of Operational Research, Elsevier, vol. 178(3), pages 841-857, May.
- Ho, Linda Lee & Trindade, Anderson Laécio Galindo, 2009. "Economic design of an X chart for short-run production," International Journal of Production Economics, Elsevier, vol. 120(2), pages 613-624, August.
- Mahadik Shashibhushan B. & Shirke Digambar T., 2007. "Economic Design of A Modified Variable Sample Size and Sampling Interval Chart," Stochastics and Quality Control, De Gruyter, vol. 22(2), pages 273-293, January.
- Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
- Iziy Azamsadat & Sadeghpour Gildeh Bahram & Monabbati Ehsan, 2017. "Comparison Between the Economic-Statistical Design of Double and Triple Sampling X¯\bar{X} Control Charts," Stochastics and Quality Control, De Gruyter, vol. 32(1), pages 49-61, June.
- De Magalhães, M.S. & Costa, A.F.B. & Moura Neto, F.D., 2009. "A hierarchy of adaptive control charts," International Journal of Production Economics, Elsevier, vol. 119(2), pages 271-283, June.
- M. Abolmohammadi & A. Seif & M. H. Behzadi & M. B. Moghadam, 2021. "Economic statistical design of adaptive $$\bar{X}$$ X ¯ control charts based on quality loss functions," Operational Research, Springer, vol. 21(2), pages 1041-1080, June.
- Alireza Faraz & R. Kazemzadeh & Ahmad Parsian & M. Moghadam, 2012. "On the advantages of economically designed the Hotelling’s T2 control chart with variable sample sizes and sampling intervals," Quality & Quantity: International Journal of Methodology, Springer, vol. 46(1), pages 39-53, January.
- Zhang, Cai Wen & Xie, Min & Goh, Thong Ngee, 2008. "Economic design of cumulative count of conforming charts under inspection by samples," International Journal of Production Economics, Elsevier, vol. 111(1), pages 93-104, January.
- W. Chiu, 1976. "On the estimation of data parameters for economic optimum 135-1135-1135-1-Charts," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 23(1), pages 135-147, December.
- Yang, Yit-Ming & Su, Chia-Yi & Pearn, W.L., 2010. "Economic design of x¯-control charts for continuous flow process with multiple assignable causes," International Journal of Production Economics, Elsevier, vol. 128(1), pages 110-117, November.
More about this item
Keywords
Multivariate control chart; Variable sampling rate; Economic design; Genetic algorithms;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:qualqt:v:43:y:2009:i:1:p:109-122. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.