IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v128y2010i1p110-117.html
   My bibliography  Save this article

Economic design of x¯-control charts for continuous flow process with multiple assignable causes

Author

Listed:
  • Yang, Yit-Ming
  • Su, Chia-Yi
  • Pearn, W.L.

Abstract

Extending Koo and Case's model (1990) for the case of a single assignable cause to allow for the second occurrence of an assignable cause following the first occurrence and the probability of the assignable causes following exponential distribution, the process-failure mechanism having a fixed hazard rate. We present a cost model and determine the optimal values of the design parameters, the sample size, the sampling intervals and control limit coefficient by minimizing the expected cost per unit time with respect to exponential parameters change. Finally, suggesting the performance of the loss-cost and sensitivity analyses of the design parameters and loss-cost which depend on the model parameters and shift amounts closely are also presented.

Suggested Citation

  • Yang, Yit-Ming & Su, Chia-Yi & Pearn, W.L., 2010. "Economic design of x¯-control charts for continuous flow process with multiple assignable causes," International Journal of Production Economics, Elsevier, vol. 128(1), pages 110-117, November.
  • Handle: RePEc:eee:proeco:v:128:y:2010:i:1:p:110-117
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(10)00211-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Isaac N. Gibra, 1971. "Economically Optimal Determination of the Parameters of X\bar -Control Chart," Management Science, INFORMS, vol. 17(9), pages 635-646, May.
    2. Chen, Yan-Kwang, 2004. "Economic design of control charts for non-normal data using variable sampling policy," International Journal of Production Economics, Elsevier, vol. 92(1), pages 61-74, November.
    3. Lin, Yu-Chang & Chou, Chao-Yu, 2005. "On the design of variable sample size and sampling intervals charts under non-normality," International Journal of Production Economics, Elsevier, vol. 96(2), pages 249-261, May.
    4. Chen, Yun-Shiow & Yang, Yit-Ming, 2002. "Economic design of -control charts with Weibull in-control times when there are multiple assignable causes," International Journal of Production Economics, Elsevier, vol. 77(1), pages 17-23, May.
    5. George Tagaras & Hau L. Lee, 1988. "Economic Design of Control Charts with Different Control Limits for Different Assignable Causes," Management Science, INFORMS, vol. 34(11), pages 1347-1366, November.
    6. Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
    7. Bai, D. S. & Lee, K. T., 1998. "An economic design of variable sampling interval control charts," International Journal of Production Economics, Elsevier, vol. 54(1), pages 57-64, January.
    8. Erwin M. Saniga, 1977. "Joint Economically Optimal Design of X\bar and R Control Charts," Management Science, INFORMS, vol. 24(4), pages 420-431, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ho, Linda Lee & Trindade, Anderson Laécio Galindo, 2009. "Economic design of an X chart for short-run production," International Journal of Production Economics, Elsevier, vol. 120(2), pages 613-624, August.
    2. Naderkhani, Farnoosh & Makis, Viliam, 2016. "Economic design of multivariate Bayesian control chart with two sampling intervals," International Journal of Production Economics, Elsevier, vol. 174(C), pages 29-42.
    3. Lim, S.L. & Khoo, Michael B.C. & Teoh, W.L. & Xie, M., 2015. "Optimal designs of the variable sample size and sampling interval X¯ chart when process parameters are estimated," International Journal of Production Economics, Elsevier, vol. 166(C), pages 20-35.
    4. Liu, J.Y. & Xie, M. & Goh, T.N. & Liu, Q.H. & Yang, Z.H., 2006. "Cumulative count of conforming chart with variable sampling intervals," International Journal of Production Economics, Elsevier, vol. 101(2), pages 286-297, June.
    5. Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
    6. M. A. Pasha & M. Bameni Moghadam & M. A. Rahim, 2020. "Effects of non-normal quality data on the integrated model of imperfect maintenance, early replacement, and economic design of $${\bar{X}}$$ X ¯ -control charts," Operational Research, Springer, vol. 20(4), pages 2519-2536, December.
    7. De Magalhães, M.S. & Costa, A.F.B. & Moura Neto, F.D., 2009. "A hierarchy of adaptive control charts," International Journal of Production Economics, Elsevier, vol. 119(2), pages 271-283, June.
    8. M. Abolmohammadi & A. Seif & M. H. Behzadi & M. B. Moghadam, 2021. "Economic statistical design of adaptive $$\bar{X}$$ X ¯ control charts based on quality loss functions," Operational Research, Springer, vol. 21(2), pages 1041-1080, June.
    9. Zhang, Cai Wen & Xie, Min & Goh, Thong Ngee, 2008. "Economic design of cumulative count of conforming charts under inspection by samples," International Journal of Production Economics, Elsevier, vol. 111(1), pages 93-104, January.
    10. Chen, Yan-Kwang, 2007. "Adaptive sampling enhancement for Hotelling's T2 charts," European Journal of Operational Research, Elsevier, vol. 178(3), pages 841-857, May.
    11. Celano, Giovanni & De Magalhães, Maysa S. & Costa, Antonio F.B. & Fichera, Sergio, 2011. "A stochastic shift model for economically designed charts constrained by the process stage configuration," International Journal of Production Economics, Elsevier, vol. 132(2), pages 315-325, August.
    12. Emre Berk & Ayhan Özgür Toy, 2009. "Quality control chart design under Jidoka," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(5), pages 465-477, August.
    13. Chen, Yun-Shiow & Yang, Yit-Ming, 2002. "Economic design of -control charts with Weibull in-control times when there are multiple assignable causes," International Journal of Production Economics, Elsevier, vol. 77(1), pages 17-23, May.
    14. Turnes Osiris & Lee Ho Linda & Imaña Christian Rainier, 2002. "Comparison of Semi-Economic and -R Control Charts for Non-Ageing and Ageing Process," Stochastics and Quality Control, De Gruyter, vol. 17(1), pages 99-112, January.
    15. Y-K Chen & H-H Chang, 2008. "Economic design of variable parameters X̄ control charts for processes with fuzzy mean shifts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(8), pages 1128-1135, August.
    16. Torng, Chau-Chen & Lee, Pei-Hsi & Liao, Nai-Yi, 2009. "An economic-statistical design of double sampling control chart," International Journal of Production Economics, Elsevier, vol. 120(2), pages 495-500, August.
    17. Costa, Antonio Fernando Branco & Machado, Marcela Aparecida Guerreiro, 2011. "Variable parameter and double sampling charts in the presence of correlation: The Markov chain approach," International Journal of Production Economics, Elsevier, vol. 130(2), pages 224-229, April.
    18. Franco, Bruno Chaves & Celano, Giovanni & Castagliola, Philippe & Costa, Antonio Fernando Branco, 2014. "Economic design of Shewhart control charts for monitoring autocorrelated data with skip sampling strategies," International Journal of Production Economics, Elsevier, vol. 151(C), pages 121-130.
    19. Ching-Hsin Wang & Feng-Chia Li, 2020. "Economic design under gamma shock model of the control chart for sustainable operations," Annals of Operations Research, Springer, vol. 290(1), pages 169-190, July.
    20. De Magalhaes, Maysa S. & Moura Neto, Francisco D., 2005. "Joint economic model for totally adaptive and R charts," European Journal of Operational Research, Elsevier, vol. 161(1), pages 148-161, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:128:y:2010:i:1:p:110-117. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.