An EPQ model for deteriorating items with imperfect production, inspection errors, rework and shortages : a type-2 fuzzy approach
Author
Abstract
Suggested Citation
DOI: 10.1007/s12597-019-00390-3
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
- Hovelaque, Vincent & Bironneau, Laurent, 2015.
"The carbon-constrained EOQ model with carbon emission dependent demand,"
International Journal of Production Economics, Elsevier, vol. 164(C), pages 285-291.
- V Hovelaque & L Bironneau, 2015. "The carbon-constrained EOQ model with carbon emission dependent demand," Post-Print halshs-01103463, HAL.
- C. Krishnamoorthi & S. Panayappan, 2013. "An EPQ model for an imperfect production system with rework and shortages," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 17(1), pages 104-124.
- Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
- David A. Schrady, 1967. "A deterministic inventory model for reparable items," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 14(3), pages 391-398.
- Rommelfanger, Heinrich, 1996. "Fuzzy linear programming and applications," European Journal of Operational Research, Elsevier, vol. 92(3), pages 512-527, August.
- Khan, Mehmood & Jaber, Mohamad Y. & Bonney, Maurice, 2011. "An economic order quantity (EOQ) for items with imperfect quality and inspection errors," International Journal of Production Economics, Elsevier, vol. 133(1), pages 113-118, September.
- Khan, M. & Jaber, M.Y. & Wahab, M.I.M., 2010. "Economic order quantity model for items with imperfect quality with learning in inspection," International Journal of Production Economics, Elsevier, vol. 124(1), pages 87-96, March.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
- Flapper, Simme Douwe P. & Teunter, Ruud H., 2004. "Logistic planning of rework with deteriorating work-in-process," International Journal of Production Economics, Elsevier, vol. 88(1), pages 51-59, March.
- Widyadana, Gede Agus & Wee, Hui Ming, 2012. "An economic production quantity model for deteriorating items with multiple production setups and rework," International Journal of Production Economics, Elsevier, vol. 138(1), pages 62-67.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Falguni Mahato & Chandan Mahato & Gour Chandra Mahata, 2023. "Sustainable optimal production policies for an imperfect production system with trade credit under different carbon emission regulations," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 25(9), pages 10073-10099, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
- Ivan Darma Wangsa & Hui Ming Wee & Shih-Hsien Tseng, 2019. "A coordinated vendor–buyer system considering loss and damage claims, insurance cost and stochastic lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 384-398, June.
- Leopoldo Eduardo Cárdenas-Barrón & María José Lea Plaza-Makowsky & María Alejandra Sevilla-Roca & José María Núñez-Baumert & Buddhadev Mandal, 2021. "An Inventory Model for Imperfect Quality Products with Rework, Distinct Holding Costs, and Nonlinear Demand Dependent on Price," Mathematics, MDPI, vol. 9(12), pages 1-20, June.
- R. Patro & Mitali M. Nayak & M. Acharya, 2019. "An EOQ model for fuzzy defective rate with allowable proportionate discount," OPSEARCH, Springer;Operational Research Society of India, vol. 56(1), pages 191-215, March.
- Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
- Javad Asadkhani & Hadi Mokhtari & Saman Tahmasebpoor, 2022. "Optimal lot-sizing under learning effect in inspection errors with different types of imperfect quality items," Operational Research, Springer, vol. 22(3), pages 2631-2665, July.
- Aditi Khanna & Aakanksha Kishore & Biswajit Sarkar & Chandra K. Jaggi, 2018. "Supply Chain with Customer-Based Two-Level Credit Policies under an Imperfect Quality Environment," Mathematics, MDPI, vol. 6(12), pages 1-35, December.
- Khan, M. & Jaber, M.Y. & Guiffrida, A.L. & Zolfaghari, S., 2011. "A review of the extensions of a modified EOQ model for imperfect quality items," International Journal of Production Economics, Elsevier, vol. 132(1), pages 1-12, July.
- Lie-Fern Hsu & Jia-Tzer Hsu, 2016. "Economic production quantity (EPQ) models under an imperfect production process with shortages backordered," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(4), pages 852-867, March.
- Tien-Yu Lin & Kuo-Lung Hou, 2015. "An imperfect quality economic order quantity with advanced receiving," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 535-551, July.
- Tapan Kumar Datta, 2017. "Inventory system with defective products and investment opportunity for reducing defective proportion," Operational Research, Springer, vol. 17(1), pages 297-312, April.
- Nita H. Shah & Dushyantkumar G. Patel & Digeshkumar B. Shah, 2018. "EPQ model for returned/reworked inventories during imperfect production process under price-sensitive stock-dependent demand," Operational Research, Springer, vol. 18(2), pages 343-359, July.
- M. Masanta & B. C. Giri, 2022. "A closed-loop supply chain model with learning effect, random return and imperfect inspection under price- and quality-dependent demand," OPSEARCH, Springer;Operational Research Society of India, vol. 59(3), pages 1094-1115, September.
- Naoufel Cheikhrouhou & Biswajit Sarkar & Baishakhi Ganguly & Asif Iqbal Malik & Rafael Batista & Young Hae Lee, 2018. "Optimization of sample size and order size in an inventory model with quality inspection and return of defective items," Annals of Operations Research, Springer, vol. 271(2), pages 445-467, December.
- Ahmed Abdel-Aleem & Mahmoud A. El-Sharief & Mohsen A. Hassan & Mohamed G. El-Sebaie, 2017. "A surface response optimization model for EPQ system with imperfect production process under rework and shortage," OPSEARCH, Springer;Operational Research Society of India, vol. 54(4), pages 735-751, December.
- Khan, Mehmood & Hussain, Matloub & Saber, Hussein M., 2016. "Information sharing in a sustainable supply chain," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 208-214.
- Sraboni Mandal & Danish Ali Khan, 2015. "Integrated inventory model with uniform demand for one vendor one customer," International Journal of Business Performance and Supply Chain Modelling, Inderscience Enterprises Ltd, vol. 7(1), pages 36-52.
- Soosan Moradi & Mohammad Reza Gholamian & Arash Sepehri, 2023. "An inventory model for imperfect quality items considering learning effects and partial trade credit policy," OPSEARCH, Springer;Operational Research Society of India, vol. 60(1), pages 276-325, March.
- C. K. Sivashankari & R. Valarmathi, 2023. "Optimal pricing and production lot-size policies in imperfect production system with price-sensitive demand, reworking, scrap, and sales return," Operational Research, Springer, vol. 23(3), pages 1-28, September.
- Ouyang, Liang-Yuh & Chang, Chun-Tao, 2013. "Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging," International Journal of Production Economics, Elsevier, vol. 144(2), pages 610-617.
More about this item
Keywords
EPQ; Deterioration; Imperfect production; Type I and Type II inspection errors; Rework; Shortages; Type-2 fuzzy;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opsear:v:56:y:2019:i:3:d:10.1007_s12597-019-00390-3. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.