IDEAS home Printed from https://ideas.repec.org/a/spr/ijsaem/v8y2017i2d10.1007_s13198-017-0635-3.html
   My bibliography  Save this article

Integrated production scheduling and maintenance planning in a hybrid flow shop system: a multi-objective approach

Author

Listed:
  • Mostafa Zandieh

    (G.C., Shahid Beheshti University)

  • Seyed Mojtaba Sajadi

    (University of Tehran)

  • Reza Behnoud

    (Science and Research Branch of Islamic Azad University)

Abstract

This study deals with a hybrid flowshop system with sequence-dependent setup times. Two objectives have been considered. Minimizing makespan for production purpose along with minimizing unavailability of the system for maintenance purpose are the objectives of this problem. Two meta-heuristics have been developed for the research problem. First one is a non-dominated sorting genetic algorithm-II (NSGA-II), while the second one is a hybridized NSGA-II (HNSGA-II), which is accompanied by a local search procedure to create better results. These two algorithms allow the decision maker to find compromise solutions between production objectives and preventive maintenance ones. Two decisions should be taken at the same time: finding the best assignment and sequence of jobs on machines in order to minimize the makespan, and deciding how often to perform preventive maintenance actions in order to minimize the system unavailability. Three approaches have been suggested for evaluation and comparison the efficiency of algorithms. The results indicate that the HNSGA-II presents better solutions compared to the ordinal NSGA-II in terms of objective functions viewpoint, while the results are obviously reversed in balance degree of achieving both objectives simultaneously.

Suggested Citation

  • Mostafa Zandieh & Seyed Mojtaba Sajadi & Reza Behnoud, 2017. "Integrated production scheduling and maintenance planning in a hybrid flow shop system: a multi-objective approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1630-1642, November.
  • Handle: RePEc:spr:ijsaem:v:8:y:2017:i:2:d:10.1007_s13198-017-0635-3
    DOI: 10.1007/s13198-017-0635-3
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s13198-017-0635-3
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s13198-017-0635-3?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to

    for a different version of it.

    References listed on IDEAS

    as
    1. Kurz, Mary E. & Askin, Ronald G., 2004. "Scheduling flexible flow lines with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 159(1), pages 66-82, November.
    2. Allaoui, H. & Lamouri, S. & Artiba, A. & Aghezzaf, E., 2008. "Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 112(1), pages 161-167, March.
    3. Loukil, T. & Teghem, J. & Tuyttens, D., 2005. "Solving multi-objective production scheduling problems using metaheuristics," European Journal of Operational Research, Elsevier, vol. 161(1), pages 42-61, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Luo, Hao & Du, Bing & Huang, George Q. & Chen, Huaping & Li, Xiaolin, 2013. "Hybrid flow shop scheduling considering machine electricity consumption cost," International Journal of Production Economics, Elsevier, vol. 146(2), pages 423-439.
    2. Mingxing Li & Ray Y. Zhong & Ting Qu & George Q. Huang, 2022. "Spatial–temporal out-of-order execution for advanced planning and scheduling in cyber-physical factories," Journal of Intelligent Manufacturing, Springer, vol. 33(5), pages 1355-1372, June.
    3. Zhen Song & Håkan Schunnesson & Mikael Rinne & John Sturgul, 2015. "Intelligent Scheduling for Underground Mobile Mining Equipment," PLOS ONE, Public Library of Science, vol. 10(6), pages 1-21, June.
    4. Bozorgirad, Mir Abbas & Logendran, Rasaratnam, 2013. "Bi-criteria group scheduling in hybrid flowshops," International Journal of Production Economics, Elsevier, vol. 145(2), pages 599-612.
    5. Quadt, Daniel & Kuhn, Heinrich, 2007. "A taxonomy of flexible flow line scheduling procedures," European Journal of Operational Research, Elsevier, vol. 178(3), pages 686-698, May.
    6. Weng, Wei & Fujimura, Shigeru, 2012. "Control methods for dynamic time-based manufacturing under customized product lead times," European Journal of Operational Research, Elsevier, vol. 218(1), pages 86-96.
    7. Gerardo Minella & Rubén Ruiz & Michele Ciavotta, 2008. "A Review and Evaluation of Multiobjective Algorithms for the Flowshop Scheduling Problem," INFORMS Journal on Computing, INFORMS, vol. 20(3), pages 451-471, August.
    8. Rui Zhang, 2017. "Sustainable Scheduling of Cloth Production Processes by Multi-Objective Genetic Algorithm with Tabu-Enhanced Local Search," Sustainability, MDPI, vol. 9(10), pages 1-26, September.
    9. Miguel A. Ortíz & Leidy E. Betancourt & Kevin Parra Negrete & Fabio Felice & Antonella Petrillo, 2018. "Dispatching algorithm for production programming of flexible job-shop systems in the smart factory industry," Annals of Operations Research, Springer, vol. 264(1), pages 409-433, May.
    10. Pan, Quan-Ke & Gao, Liang & Li, Xin-Yu & Gao, Kai-Zhou, 2017. "Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times," Applied Mathematics and Computation, Elsevier, vol. 303(C), pages 89-112.
    11. Hnaien, Faicel & Yalaoui, Farouk & Mhadhbi, Ahmed, 2015. "Makespan minimization on a two-machine flowshop with an availability constraint on the first machine," International Journal of Production Economics, Elsevier, vol. 164(C), pages 95-104.
    12. Rafael Muñoz-Sánchez & Iris Martínez-Salazar & José Luis González-Velarde & Yasmín Á Ríos Solís, 2024. "Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints," PLOS ONE, Public Library of Science, vol. 19(6), pages 1-16, June.
    13. Moghaddam, Kamran S., 2013. "Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming," International Journal of Production Economics, Elsevier, vol. 146(2), pages 704-716.
    14. Song Jiu, 2021. "A two-phase approach for integrating preventive maintenance with production and delivery in an unreliable coal mine," Journal of Heuristics, Springer, vol. 27(6), pages 991-1020, December.
    15. Balasubramanian, Hari & Fowler, John & Keha, Ahmet & Pfund, Michele, 2009. "Scheduling interfering job sets on parallel machines," European Journal of Operational Research, Elsevier, vol. 199(1), pages 55-67, November.
    16. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    17. Fatih Yigit & Marcio Pereira Basilio & Valdecy Pereira, 2024. "A Hybrid Approach for the Multi-Criteria-Based Optimization of Sequence-Dependent Setup-Based Flow Shop Scheduling," Mathematics, MDPI, vol. 12(13), pages 1-24, June.
    18. Trevino-Martinez, Samuel & Sawhney, Rapinder & Shylo, Oleg, 2022. "Energy-carbon footprint optimization in sequence-dependent production scheduling," Applied Energy, Elsevier, vol. 315(C).
    19. A. R. Rahimi-Vahed & S. M. Mirghorbani, 2007. "A multi-objective particle swarm for a flow shop scheduling problem," Journal of Combinatorial Optimization, Springer, vol. 13(1), pages 79-102, January.
    20. Urlings, Thijs & Ruiz, Rubén & Stützle, Thomas, 2010. "Shifting representation search for hybrid flexible flowline problems," European Journal of Operational Research, Elsevier, vol. 207(2), pages 1086-1095, December.

    More about this item

    Keywords

    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ijsaem:v:8:y:2017:i:2:d:10.1007_s13198-017-0635-3. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.