A theoretical and empirical study of job scheduling in cloud computing environments: the weighted completion time minimization problem with capacitated parallel machines
Author
Abstract
Suggested Citation
DOI: 10.1007/s10479-023-05613-x
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Shijin Wang & Wenli Cui, 2021. "Approximation algorithms for the min-max regret identical parallel machine scheduling problem with outsourcing and uncertain processing time," International Journal of Production Research, Taylor & Francis Journals, vol. 59(15), pages 4579-4592, August.
- Jianer Chen & Chung‐Yee Lee, 1999. "General multiprocessor task scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 57-74, February.
- Cohen, Izack & Postek, Krzysztof & Shtern, Shimrit, 2023. "An adaptive robust optimization model for parallel machine scheduling," European Journal of Operational Research, Elsevier, vol. 306(1), pages 83-104.
- Balouka, Noemie & Cohen, Izack, 2021. "A robust optimization approach for the multi-mode resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 291(2), pages 457-470.
- Bukchin, Yossi & Raviv, Tal & Zaides, Ilya, 2020. "The consecutive multiprocessor job scheduling problem," European Journal of Operational Research, Elsevier, vol. 284(2), pages 427-438.
- Umang, Nitish & Bierlaire, Michel & Vacca, Ilaria, 2013. "Exact and heuristic methods to solve the berth allocation problem in bulk ports," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 54(C), pages 14-31.
- W. L. Eastman & S. Even & I. M. Isaacs, 1964. "Bounds for the Optimal Scheduling of n Jobs on m Processors," Management Science, INFORMS, vol. 11(2), pages 268-279, November.
- Wayne E. Smith, 1956. "Various optimizers for single‐stage production," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 3(1‐2), pages 59-66, March.
- Dominik Kress & Sebastian Meiswinkel & Erwin Pesch, 2018. "Mechanism design for machine scheduling problems: classification and literature overview," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(3), pages 583-611, July.
- Shimon Bitton & Izack Cohen & Morris Cohen, 2019. "Joint repair sourcing and stocking policies for repairables using Erlang-A and Erlang-B queueing models," IISE Transactions, Taylor & Francis Journals, vol. 51(10), pages 1151-1166, October.
- Muter, İbrahim, 2020. "Exact algorithms to minimize makespan on single and parallel batch processing machines," European Journal of Operational Research, Elsevier, vol. 285(2), pages 470-483.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Bukchin, Yossi & Raviv, Tal & Zaides, Ilya, 2020. "The consecutive multiprocessor job scheduling problem," European Journal of Operational Research, Elsevier, vol. 284(2), pages 427-438.
- Jiayin Pan & Cong Chen & Yinfeng Xu, 2024. "The price of anarchy for a berth allocation game," Journal of Scheduling, Springer, vol. 27(1), pages 51-60, February.
- Hui Liu & Maurice Queyranne & David Simchi‐Levi, 2005. "On the asymptotic optimality of algorithms for the flow shop problem with release dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(3), pages 232-242, April.
- Kramer, Arthur & Dell’Amico, Mauro & Iori, Manuel, 2019. "Enhanced arc-flow formulations to minimize weighted completion time on identical parallel machines," European Journal of Operational Research, Elsevier, vol. 275(1), pages 67-79.
- Bachtenkirch, David & Bock, Stefan, 2022. "Finding efficient make-to-order production and batch delivery schedules," European Journal of Operational Research, Elsevier, vol. 297(1), pages 133-152.
- Felipe T. Muñoz & Rodrigo Linfati, 2024. "Bounding the Price of Anarchy of Weighted Shortest Processing Time Policy on Uniform Parallel Machines," Mathematics, MDPI, vol. 12(14), pages 1-12, July.
- Marieke Quant & Marc Meertens & Hans Reijnierse, 2008.
"Processing games with shared interest,"
Annals of Operations Research, Springer, vol. 158(1), pages 219-228, February.
- Quant, M. & Meertens, M. & Reijnierse, J.H., 2004. "Processing Games with Shared Interest," Other publications TiSEM 016ac415-c70e-453f-acfb-a, Tilburg University, School of Economics and Management.
- Quant, M. & Meertens, M. & Reijnierse, J.H., 2008. "Processing games with shared interest," Other publications TiSEM e83018e2-d6fb-4829-b6eb-f, Tilburg University, School of Economics and Management.
- Quant, M. & Meertens, M. & Reijnierse, J.H., 2004. "Processing Games with Shared Interest," Discussion Paper 2004-126, Tilburg University, Center for Economic Research.
- Lili Liu & Guochun Tang & Baoqiang Fan & Xingpeng Wang, 2015. "Two-person cooperative games on scheduling problems in outpatient pharmacy dispensing process," Journal of Combinatorial Optimization, Springer, vol. 30(4), pages 938-948, November.
- Iris, Çağatay & Pacino, Dario & Ropke, Stefan & Larsen, Allan, 2015. "Integrated Berth Allocation and Quay Crane Assignment Problem: Set partitioning models and computational results," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 81(C), pages 75-97.
- van Beek, Andries & Malmberg, Benjamin & Borm, Peter & Quant, Marieke & Schouten, Jop, 2021.
"Cooperation and Competition in Linear Production and Sequencing Processes,"
Discussion Paper
2021-011, Tilburg University, Center for Economic Research.
- van Beek, Andries & Malmberg, Benjamin & Borm, Peter & Quant, Marieke & Schouten, Jop, 2021. "Cooperation and Competition in Linear Production and Sequencing Processes," Other publications TiSEM fd7a301b-7ef3-4142-835d-a, Tilburg University, School of Economics and Management.
- Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
- Zhen, Lu, 2016. "Modeling of yard congestion and optimization of yard template in container ports," Transportation Research Part B: Methodological, Elsevier, vol. 90(C), pages 83-104.
- Reijnierse, Hans & Borm, Peter & Quant, Marieke & Meertens, Marc, 2010.
"Processing games with restricted capacities,"
European Journal of Operational Research, Elsevier, vol. 202(3), pages 773-780, May.
- Meertens, M. & Borm, P.E.M. & Reijnierse, J.H. & Quant, M., 2004. "Processing Games with Restricted Capacities," Other publications TiSEM a769e434-b8c9-4116-8897-f, Tilburg University, School of Economics and Management.
- Meertens, M. & Borm, P.E.M. & Reijnierse, J.H. & Quant, M., 2004. "Processing Games with Restricted Capacities," Discussion Paper 2004-83, Tilburg University, Center for Economic Research.
- Lamas, Patricio & Goycoolea, Marcos & Pagnoncelli, Bernardo & Newman, Alexandra, 2024. "A target-time-windows technique for project scheduling under uncertainty," European Journal of Operational Research, Elsevier, vol. 314(2), pages 792-806.
- Hermelin, Danny & Molter, Hendrik & Niedermeier, Rolf & Pinedo, Michael & Shabtay, Dvir, 2025. "Fairness in repetitive scheduling," European Journal of Operational Research, Elsevier, vol. 323(3), pages 724-738.
- Borm, Peter & Fiestras-Janeiro, Gloria & Hamers, Herbert & Sanchez, Estela & Voorneveld, Mark, 2002.
"On the convexity of games corresponding to sequencing situations with due dates,"
European Journal of Operational Research, Elsevier, vol. 136(3), pages 616-634, February.
- Borm, P.E.M. & Fiestras-Janeiro, G. & Hamers, H.J.M. & Sánchez, E. & Voorneveld, M., 1999. "On the Convexity of Games Corresponding to Sequencing Situations with Due Dates," Other publications TiSEM 46a07ce4-57fe-4a08-bcb5-c, Tilburg University, School of Economics and Management.
- Borm, P.E.M. & Fiestras-Janeiro, G. & Hamers, H.J.M. & Sánchez, E. & Voorneveld, M., 2002. "On the convexity of games corresponding to sequencing situations with due dates," Other publications TiSEM caf52141-b0aa-42ef-96ed-e, Tilburg University, School of Economics and Management.
- Borm, P.E.M. & Fiestras-Janeiro, G. & Hamers, H.J.M. & Sánchez, E. & Voorneveld, M., 1999. "On the Convexity of Games Corresponding to Sequencing Situations with Due Dates," Discussion Paper 1999-49, Tilburg University, Center for Economic Research.
- Rubing Chen & Jinjiang Yuan, 2020. "Single-machine scheduling of proportional-linearly deteriorating jobs with positional due indices," 4OR, Springer, vol. 18(2), pages 177-196, June.
- Ravindran Vijayalakshmi, Vipin & Schröder, Marc & Tamir, Tami, 2024. "Minimizing total completion time with machine-dependent priority lists," European Journal of Operational Research, Elsevier, vol. 315(3), pages 844-854.
- Hanane Krim & Rachid Benmansour & David Duvivier & Daoud Aït-Kadi & Said Hanafi, 2020. "Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance," Computational Optimization and Applications, Springer, vol. 75(1), pages 291-320, January.
- Robenek, Tomáš & Umang, Nitish & Bierlaire, Michel & Ropke, Stefan, 2014. "A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports," European Journal of Operational Research, Elsevier, vol. 235(2), pages 399-411.
More about this item
Keywords
Scheduling; Capacitated machines; Cloud computing; Parallel machines; Approximation algorithms;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:338:y:2024:i:1:d:10.1007_s10479-023-05613-x. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.