IDEAS home Printed from https://ideas.repec.org/a/inm/oropre/v54y2006i3p505-522.html
   My bibliography  Save this article

Multiproduct Systems with Both Setup Times and Costs: Fluid Bounds and Schedules

Author

Listed:
  • Wei-Min Lan

    (Industrial and Operations Engineering Department, University of Michigan, 1205 Beal Avenue, Ann Arbor, Michigan 48109-2117)

  • Tava Lennon Olsen

    (John M. Olin School of Business, Washington University in St. Louis, One Brookings Drive, St. Louis, Missouri 63130-4899)

Abstract

This paper considers a multiproduct, single-server production system where both setup times and costs are incurred whenever the server changes product. The system is make-to-order with a per unit backlogging cost. The objective is to minimize the long-run average cost per unit time. Using a fluid model, we provide a closed-form lower bound on system performance. This bound is also shown to provide a lower bound for stochastic systems when scheduling is local or static, but is only an approximation when scheduling is global or dynamic. The fluid bound suggests both local and global scheduling heuristics, which are tested for the stochastic system via a simulation study.

Suggested Citation

  • Wei-Min Lan & Tava Lennon Olsen, 2006. "Multiproduct Systems with Both Setup Times and Costs: Fluid Bounds and Schedules," Operations Research, INFORMS, vol. 54(3), pages 505-522, June.
  • Handle: RePEc:inm:oropre:v:54:y:2006:i:3:p:505-522
    DOI: 10.1287/opre.1060.0298
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.1060.0298
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.1060.0298?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. J. G. Dai & O. B. Jennings, 2004. "Stabilizing Queueing Networks with Setups," Mathematics of Operations Research, INFORMS, vol. 29(4), pages 891-922, November.
    2. Tava Lennon Olsen, 1999. "A Practical Scheduling Method for Multiclass Production Systems with Setups," Management Science, INFORMS, vol. 45(1), pages 116-130, January.
    3. Boxma, O. J. & Down, D. G., 1997. "Dynamic server assignment in a two-queue model," European Journal of Operational Research, Elsevier, vol. 103(3), pages 595-609, December.
    4. Sox, Charles R. & Jackson, Peter L. & Bowman, Alan & Muckstadt, John A., 1999. "A review of the stochastic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 62(3), pages 181-200, September.
    5. Dimitris Bertsimas & José Niño-Mora, 1999. "Optimization of Multiclass Queueing Networks with Changeover Times Via the Achievable Region Approach: Part II, The Multi-Station Case," Mathematics of Operations Research, INFORMS, vol. 24(2), pages 331-361, May.
    6. Salah E. Elmaghraby, 1978. "The Economic Lot Scheduling Problem (ELSP): Review and Extensions," Management Science, INFORMS, vol. 24(6), pages 587-598, February.
    7. David M. Markowitz & Lawrence M. Wein, 2001. "Heavy Traffic Analysis of Dynamic Cyclic Policies: A Unified Treatment of the Single Machine Scheduling Problem," Operations Research, INFORMS, vol. 49(2), pages 246-270, April.
    8. S. W. Fuhrmann & Robert B. Cooper, 1985. "Stochastic Decompositions in the M / G /1 Queue with Generalized Vacations," Operations Research, INFORMS, vol. 33(5), pages 1117-1129, October.
    9. Dimitris Bertsimas & José Niño-Mora, 1999. "Optimization of Multiclass Queueing Networks with Changeover Times Via the Achievable Region Approach: Part I, The Single-Station Case," Mathematics of Operations Research, INFORMS, vol. 24(2), pages 306-330, May.
    10. J. G. Dai & Gideon Weiss, 2002. "A Fluid Heuristic for Minimizing Makespan in Job Shops," Operations Research, INFORMS, vol. 50(4), pages 692-707, August.
    11. Dimitris Bertsimas & David Gamarnik & Jay Sethuraman, 2003. "From Fluid Relaxations to Practical Algorithms for High-Multiplicity Job-Shop Scheduling: The Holding Cost Objective," Operations Research, INFORMS, vol. 51(5), pages 798-813, October.
    12. David M. Markowitz & Martin I. Reiman & Lawrence M. Wein, 2000. "The Stochastic Economic Lot Scheduling Problem: Heavy Traffic Analysis of Dynamic Cyclic Policies," Operations Research, INFORMS, vol. 48(1), pages 136-154, February.
    13. Awi Federgruen & Ziv Katalan, 1998. "Determining Production Schedules Under Base-Stock Policies in Single Facility Multi-Item Production Systems," Operations Research, INFORMS, vol. 46(6), pages 883-898, December.
    14. Izak Duenyas & Mark P. Van Oyen, 1996. "Heuristic Scheduling of Parallel Heterogeneous Queues with Set-Ups," Management Science, INFORMS, vol. 42(6), pages 814-829, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Alexey Matveev & Varvara Feoktistova & Ksenia Bolshakova, 2016. "On Global Near Optimality of Special Periodic Protocols for Fluid Polling Systems with Setups," Journal of Optimization Theory and Applications, Springer, vol. 171(3), pages 1055-1070, December.
    2. Zhao, Yaping & Xu, Xiaoyun & Li, Haidong & Liu, Yanni, 2016. "Prioritized customer order scheduling to maximize throughput," European Journal of Operational Research, Elsevier, vol. 255(2), pages 345-356.
    3. Carri W. Chan & Mor Armony & Nicholas Bambos, 2016. "Maximum weight matching with hysteresis in overloaded queues with setups," Queueing Systems: Theory and Applications, Springer, vol. 82(3), pages 315-351, April.
    4. uit het Broek, Michiel A.J. & Van der Heide, Gerlach & Van Foreest, Nicky D., 2020. "Energy-saving policies for temperature-controlled production systems with state-dependent setup times and costs," European Journal of Operational Research, Elsevier, vol. 287(3), pages 916-928.
    5. Niv Buchbinder & Tracy Kimbrel & Retsef Levi & Konstantin Makarychev & Maxim Sviridenko, 2013. "Online Make-to-Order Joint Replenishment Model: Primal-Dual Competitive Algorithms," Operations Research, INFORMS, vol. 61(4), pages 1014-1029, August.
    6. Rappold, James A. & Yoho, Keenan D., 2014. "Setting safety stocks for stable rotation cycle schedules," International Journal of Production Economics, Elsevier, vol. 156(C), pages 146-158.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Otis B. Jennings, 2008. "Heavy-Traffic Limits of Queueing Networks with Polling Stations: Brownian Motion in a Wedge," Mathematics of Operations Research, INFORMS, vol. 33(1), pages 12-35, February.
    2. Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
    3. Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
    4. Sem Borst & Onno Boxma, 2018. "Polling: past, present, and perspective," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 26(3), pages 335-369, October.
    5. David M. Markowitz & Lawrence M. Wein, 2001. "Heavy Traffic Analysis of Dynamic Cyclic Policies: A Unified Treatment of the Single Machine Scheduling Problem," Operations Research, INFORMS, vol. 49(2), pages 246-270, April.
    6. Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
    7. Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
    8. Carri W. Chan & Mor Armony & Nicholas Bambos, 2016. "Maximum weight matching with hysteresis in overloaded queues with setups," Queueing Systems: Theory and Applications, Springer, vol. 82(3), pages 315-351, April.
    9. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
    10. Jodlbauer, Herbert & Reitner, Sonja, 2012. "Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system," International Journal of Production Economics, Elsevier, vol. 136(2), pages 306-317.
    11. Alexey Matveev & Varvara Feoktistova & Ksenia Bolshakova, 2016. "On Global Near Optimality of Special Periodic Protocols for Fluid Polling Systems with Setups," Journal of Optimization Theory and Applications, Springer, vol. 171(3), pages 1055-1070, December.
    12. Beck, Fabian G. & Biel, Konstantin & Glock, Christoph H., 2019. "Integration of energy aspects into the economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 209(C), pages 399-410.
    13. Löhndorf, Nils & Riel, Manuel & Minner, Stefan, 2014. "Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 157(C), pages 170-176.
    14. Daniel Adelman, 2007. "Price-Directed Control of a Closed Logistics Queueing Network," Operations Research, INFORMS, vol. 55(6), pages 1022-1038, December.
    15. Rappold, James A. & Yoho, Keenan D., 2014. "Setting safety stocks for stable rotation cycle schedules," International Journal of Production Economics, Elsevier, vol. 156(C), pages 146-158.
    16. Martin I. Reiman & Lawrence M. Wein, 1998. "Dynamic Scheduling of a Two-Class Queue with Setups," Operations Research, INFORMS, vol. 46(4), pages 532-547, August.
    17. Robert B. Cooper & Shun-Chen Niu & Mandyam M. Srinivasan, 1998. "When Does Forced Idle Time Improve Performance in Polling Models?," Management Science, INFORMS, vol. 44(8), pages 1079-1086, August.
    18. Awi Federgruen & Ziv Katalan, 1998. "Determining Production Schedules Under Base-Stock Policies in Single Facility Multi-Item Production Systems," Operations Research, INFORMS, vol. 46(6), pages 883-898, December.
    19. Jinwei Gu & Manzhan Gu & Xiwen Lu & Ying Zhang, 2018. "Asymptotically optimal policy for stochastic job shop scheduling problem to minimize makespan," Journal of Combinatorial Optimization, Springer, vol. 36(1), pages 142-161, July.
    20. Kampf, M. & Kochel, P., 2006. "Simulation-based sequencing and lot size optimisation for a production-and-inventory system with multiple items," International Journal of Production Economics, Elsevier, vol. 104(1), pages 191-200, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:54:y:2006:i:3:p:505-522. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.