Predictive Three-Dimensional Printing of Spare Parts with Internet of Things
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.2023.00978
Download full text from publisher
References listed on IDEAS
- Lin, X. & Basten, R.J.I. & Kranenburg, A.A. & van Houtum, G.J., 2017. "Condition based spare parts supply," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 240-248.
- Albert Y. Ha, 2000. "Stock Rationing in an M/E k /1 Make-to-Stock Queue," Management Science, INFORMS, vol. 46(1), pages 77-87, January.
- Sofia Panagiotidou, 2020. "Joint optimization of spare parts ordering and age-based preventive replacement," International Journal of Production Research, Taylor & Francis Journals, vol. 58(20), pages 6283-6299, October.
- Vinayak Deshpande & Ananth V. Iyer & Richard Cho, 2006. "Efficient Supply Chain Management at the U.S. Coast Guard Using Part-Age Dependent Supply Replenishment Policies," Operations Research, INFORMS, vol. 54(6), pages 1028-1040, December.
- Christian van Delft & K. Hadj Youssef, 2004. "Efficient Scheduling Rules in a Combined Make-to-Stock and Make-to-Order Manufacturing System," Post-Print hal-00471415, HAL.
- Ayse Sena Eruguz & Tarkan Tan & Geert-Jan van Houtum, 2018. "Integrated maintenance and spare part optimization for moving assets," IISE Transactions, Taylor & Francis Journals, vol. 50(3), pages 230-245, March.
- Khaled Hadj Youssef & Christian Van Delft & Yves Dallery, 2004. "Efficient Scheduling Rules in a Combined Make-to-Stock and Make-to-Order Manufacturing System," Annals of Operations Research, Springer, vol. 126(1), pages 103-134, February.
- S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Shang, Beibei & Nie, Jiajia & Guo, Qiang & Zhao, Yingxue, 2025. "Incentivizing supplier quality improvement through timely IoT data sharing in the industry 5.0 era," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 203(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2017. "Flexible lot sizing in hybrid make-to-order/make-to-stock production planning," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1014-1023.
- Sun, X.Y. & Ji, P. & Sun, L.Y. & Wang, Y.L., 2008. "Positioning multiple decoupling points in a supply network," International Journal of Production Economics, Elsevier, vol. 113(2), pages 943-956, June.
- Sato, Yutaro & Maeda, Hiroyuki & Toshima, Ryusei & Nagasawa, Keisuke & Morikawa, Katsumi & Takahashi, Katsuhiko, 2023. "Switching decisions in a hybrid MTS/MTO production system comprising multiple machines considering setup," International Journal of Production Economics, Elsevier, vol. 263(C).
- Kouki, Chaaben & Drent, Melvin & Babai, M. Zied & Drent, Collin, 2025. "Dedicated maintenance and repair shop control for spare parts networks," Other publications TiSEM 8609700c-5ae3-4e17-b2f8-f, Tilburg University, School of Economics and Management.
- Almehdawe, Eman & Jewkes, Elizabeth, 2013. "Performance analysis and optimization of hybrid manufacturing systems under a batch ordering policy," International Journal of Production Economics, Elsevier, vol. 144(1), pages 200-208.
- Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020.
"Spare parts inventory control based on maintenance planning,"
Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Zhu, S. & van Jaarsveld, W.L. & Dekker, R., 2019. "Spare Parts Inventory Control based on Maintenance Planning," Econometric Institute Research Papers EI2019-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Integrating make-to-order and make-to-stock in job shop control," International Journal of Production Economics, Elsevier, vol. 185(C), pages 1-10.
- Dursun, İpek & Akcay, Alp & van Houtum, Geert-Jan, 2024. "How good must failure predictions be to make local spare parts stock superfluous?," International Journal of Production Economics, Elsevier, vol. 267(C).
- Van der Auweraer, Sarah & Zhu, Sha & Boute, Robert N., 2021. "The value of installed base information for spare part inventory control," International Journal of Production Economics, Elsevier, vol. 239(C).
- Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
- Feng, Haofang & Zhang, Sheng Hao & Zhang, Yong, 2023. "Managing production-inventory-maintenance systems with condition monitoring," European Journal of Operational Research, Elsevier, vol. 310(2), pages 698-711.
- Pereira, Daniel Filipe & Oliveira, José Fernando & Carravilla, Maria Antónia, 2022. "Merging make-to-stock/make-to-order decisions into sales and operations planning: A multi-objective approach," Omega, Elsevier, vol. 107(C).
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Reprint of “Integrating make-to-order and make-to-stock in job shop control”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 3-12.
- Akkerman, Renzo & van Donk, Dirk Pieter, 2007. "Product prioritization in a two-stage food production system with intermediate storage," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 43-53, July.
- N Sanajian & H Abouee-Mehrizi & B Balcıog̃lu, 2010. "Scheduling policies in the M/G/1 make-to-stock queue," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(1), pages 115-123, January.
- De Munck, Thomas & Chevalier, Philippe & Tancrez, Jean-Sébastien, 2023. "Managing priorities on on-demand service platforms with waiting time differentiation," International Journal of Production Economics, Elsevier, vol. 266(C).
- KarabaÄŸ, Oktay & Eruguz, Ayse Sena & Basten, Rob, 2020. "Integrated optimization of maintenance interventions and spare part selection for a partially observable multi-component system," Reliability Engineering and System Safety, Elsevier, vol. 200(C).
- Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
- Sharda, Bikram & Akiya, Naoko, 2012. "Selecting make-to-stock and postponement policies for different products in a chemical plant: A case study using discrete event simulation," International Journal of Production Economics, Elsevier, vol. 136(1), pages 161-171.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:71:y:2025:i:3:p:1925-1943. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.
Printed from https://ideas.repec.org/a/inm/ormnsc/v71y2025i3p1925-1943.html