Modeling and Worker Motivation in JIT Production Systems
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.44.12.1595
Download full text from publisher
References listed on IDEAS
- Richard Conway & William Maxwell & John O. McClain & L. Joseph Thomas, 1988. "The Role of Work-in-Process Inventory in Serial Production Lines," Operations Research, INFORMS, vol. 36(2), pages 229-241, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Opher Baron & Oded Berman & Dmitry Krass & Jianfu Wang, 2014. "Using Strategic Idleness to Improve Customer Service Experience in Service Networks," Operations Research, INFORMS, vol. 62(1), pages 123-140, February.
- Chen, Jiaqiong & Askin, Ronald G., 2006. "Throughput maximization in serial production lines with worksharing," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 88-101, February.
- Wallace J. Hopp & Eylem Tekin & Mark P. Van Oyen, 2004. "Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers," Management Science, INFORMS, vol. 50(1), pages 83-98, January.
- Tang, Kwei & Gong, Linguo & Chang, Dong-Shang, 2003. "Optimal process control policies under a time-varying cost structure," European Journal of Operational Research, Elsevier, vol. 149(1), pages 197-210, August.
- Lutz, Christian M. & Roscoe Davis, K. & Sun, Minghe, 1998. "Determining buffer location and size in production lines using tabu search," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 301-316, April.
- Chen-Yang Cheng & Shu-Fen Li & Chia-Leng Lee & Ranon Jientrakul & Chumpol Yuangyai, 2022. "A Comparative Study of Unbalanced Production Lines Using Simulation Modeling: A Case Study for Solar Silicon Manufacturing," Sustainability, MDPI, vol. 14(2), pages 1-15, January.
- Lauren Xiaoyuan Lu & Jan A. Van Mieghem & R. Canan Savaskan, 2009. "Incentives for Quality Through Endogenous Routing," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 254-273, July.
- Bertazzi, Luca, 2011. "Determining the optimal dimension of a work-in-process storage area," International Journal of Production Economics, Elsevier, vol. 131(2), pages 483-489, June.
- Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
- Urban, Timothy L. & Chiang, Wen-Chyuan, 2016. "Designing energy-efficient serial production lines: The unpaced synchronous line-balancing problem," European Journal of Operational Research, Elsevier, vol. 248(3), pages 789-801.
- Tiacci, Lorenzo, 2015. "Simultaneous balancing and buffer allocation decisions for the design of mixed-model assembly lines with parallel workstations and stochastic task times," International Journal of Production Economics, Elsevier, vol. 162(C), pages 201-215.
- Hurley, Simon F. & Clay Whybark, D., 1999. "Inventory and capacity trade-offs in a manufacturing cell," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 203-212, March.
- Payman Jula & Robert Leachman, 2008. "Coordinating decentralized local schedulers in complex supply chain manufacturing," Annals of Operations Research, Springer, vol. 161(1), pages 123-147, July.
- John Boudreau & Wallace Hopp & John O. McClain & L. Joseph Thomas, 2003. "On the Interface Between Operations and Human Resources Management," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 179-202, September.
- Andijani, A. A. & Anwarul, M., 1997. "Manufacturing blocking discipline: A multi-criterion approach for buffer allocations," International Journal of Production Economics, Elsevier, vol. 51(3), pages 155-163, September.
- Uday Venkatadri & Shentao Wang & Ashok Srinivasan, 2021. "A Model for Demand Planning in Supply Chains with Congestion Effects," Logistics, MDPI, vol. 5(1), pages 1-24, January.
- Erel, Erdal, 1998. "A study on production lines with discrete batch WIP inventory transfer," International Journal of Production Economics, Elsevier, vol. 55(1), pages 71-85, June.
- Sabry Shaaban & Rodrigo Romero-Silva, 2021. "Performance of merging lines with uneven buffer capacity allocation: the effects of unreliability under different inventory-related costs," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1253-1288, December.
- Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
- Bagchi, Tapan P. & Gupta, Jatinder N.D. & Sriskandarajah, Chelliah, 2006. "A review of TSP based approaches for flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 169(3), pages 816-854, March.
More about this item
Keywords
JIT; Serial Production Lines; Independence Assumption; Job Design;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:44:y:1998:i:12-part-1:p:1595-1607. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.