Estimation of Project Completion Time-Based on a Mixture of Expert in an Interactive Space

Author

Listed:
  • M. T. Hajiali
  • M. R. Mosavi
  • K. Shahanaghi

Abstract

Estimation the time and the cost of completing projects on the basis of decision making to use either of the estimation methods are one of the most important issues in project management. In this paper, a decision making database of learning machines, is proposed, that a set of possible estimator are working together to estimate the project completion time, in it. This cooperation is based on samples neighborhood in the feature space. One of the important issues, that learning machines are facing it, is the complexity in feature space, because of features with high-correlation. In this paper, to avoid this problem, principal component analysis (PCA) method is used to accuracy has increase, addition to, increasing in system speed. Moreover, methods based on the ensemble, have a higher reliability and ability to generalization, compared to single methods. Furthermore, the hybrid method, (PCA and ensemble), have all the above mentioned advantages. Therefore, system reliability control, using more powerful learning machines, in ensemble, and also ability of the proposed model, to manage existing poor estimators, in ensemble, are other important features of this method. In the end, a software code was created, which provides ability to connect to MSP.Â

Suggested Citation

  • M. T. Hajiali & M. R. Mosavi & K. Shahanaghi, 2014. "Estimation of Project Completion Time-Based on a Mixture of Expert in an Interactive Space," Modern Applied Science, Canadian Center of Science and Education, vol. 8(6), pages 229-229, December.
  • Handle: RePEc:ibn:masjnl:v:8:y:2014:i:6:p:229
    as

    Download full text from publisher

    File URL: https://ccsenet.org/journal/index.php/mas/article/download/40042/23007
    Download Restriction: no

    File URL: https://ccsenet.org/journal/index.php/mas/article/view/40042
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Mario Vanhoucke, 2014. "Earned Value Management," Management for Professionals, in: Integrated Project Management and Control, edition 127, chapter 0, pages 17-31, Springer.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Vanhoucke, Mario & Colin, Jeroen, 2016. "On the use of multivariate regression methods for longest path calculations from earned value management observations," Omega, Elsevier, vol. 61(C), pages 127-140.
    2. Martens, Annelies & Vanhoucke, Mario, 2019. "The impact of applying effort to reduce activity variability on the project time and cost performance," European Journal of Operational Research, Elsevier, vol. 277(2), pages 442-453.
    3. Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2022. "Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control," European Journal of Operational Research, Elsevier, vol. 297(2), pages 451-466.
    4. Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2020. "The impact of a limited budget on the corrective action taking process," European Journal of Operational Research, Elsevier, vol. 286(3), pages 1070-1086.
    5. Plaza, Malgorzata, 2016. "Balancing the costs of human resources on an ERP project," Omega, Elsevier, vol. 59(PB), pages 171-183.
    6. Mohammadreza Sharifi Ghazvini & Vahidreza Ghezavati & Sadigh Raissi & Ahmad Makui, 2017. "An Integrated Efficiency–Risk Approach in Sustainable Project Control," Sustainability, MDPI, vol. 9(9), pages 1-20, September.
    7. Cohen, Izack & Iluz, Michal, 2015. "When cost–effective design strategies are not enough: Evidence from an experimental study on the role of redundant goals," Omega, Elsevier, vol. 56(C), pages 99-111.
    8. Merkourios Papanikolaou & Yiannis Xenidis, 2020. "Risk-Informed Performance Assessment of Construction Projects," Sustainability, MDPI, vol. 12(13), pages 1-20, July.

    More about this item

    JEL classification:

    • R00 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - General - - - General
    • Z0 - Other Special Topics - - General

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ibn:masjnl:v:8:y:2014:i:6:p:229. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Canadian Center of Science and Education (email available below). General contact details of provider: https://edirc.repec.org/data/cepflch.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.