Application of Black-Winged Differential-Variant Whale Optimization Algorithm in the Optimization Scheduling of Cascade Hydropower Stations
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Kun Yang & Kan Yang, 2021. "Short-Term Hydro Generation Scheduling of the Three Gorges Hydropower Station Using Improver Binary-coded Whale Optimization Algorithm," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 35(11), pages 3771-3790, September.
- Kun Yang & Kan Yang, 2022. "Improved Whale Algorithm for Economic Load Dispatch Problem in Hydropower Plants and Comprehensive Performance Evaluation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 36(15), pages 5823-5838, December.
- Wen-jing Niu & Zhong-kai Feng & Yu-rong Li & Shuai Liu, 2021. "Cooperation Search Algorithm for Power Generation Production Operation Optimization of Cascade Hydropower Reservoirs," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 35(8), pages 2465-2485, June.
- Yousif H. Al-Aqeeli & Omar M. A Mahmood Agha, 2020. "Optimal Operation of Multi-reservoir System for Hydropower Production Using Particle Swarm Optimization Algorithm," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 34(10), pages 3099-3112, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Wu, Yuqiang & Liao, Shengli & Liu, Benxi & Cheng, Chuntian & Zhao, Hongye & Fang, Zhou & Lu, Jia, 2024. "Short-term load distribution model for cascade giant hydropower stations with complex hydraulic and electrical connections," Renewable Energy, Elsevier, vol. 232(C).
- Rahim Zahedi & Reza Eskandarpanah & Mohammadhossein Akbari & Nima Rezaei & Paniz Mazloumin & Omid Noudeh Farahani, 2022. "Development of a New Simulation Model for the Reservoir Hydropower Generation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 36(7), pages 2241-2256, May.
- Li, Xudong & Yang, Weijia & Liao, Yiwen & Zhang, Shushu & Zheng, Yang & Zhao, Zhigao & Tang, Maojia & Cheng, Yongguang & Liu, Pan, 2024. "Short-term risk-management for hydro-wind-solar hybrid energy system considering hydropower part-load operating characteristics," Applied Energy, Elsevier, vol. 360(C).
- Anthony O. Onokwai & Udochukwu B. Akuru & Dawood A. Desai, 2025. "Mathematical Modelling and Optimisation of Operating Parameters for Enhanced Energy Generation in Gas Turbine Power Plant with Intercooler," Mathematics, MDPI, vol. 13(1), pages 1-39, January.
- Hatamkhani, Amir & Moridi, Ali & Haghighi, Ali Torabi, 2023. "Incorporating ecosystem services value into the optimal development of hydropower projects," Renewable Energy, Elsevier, vol. 203(C), pages 495-505.
- Kun Yang & Kan Yang, 2022. "Improved Whale Algorithm for Economic Load Dispatch Problem in Hydropower Plants and Comprehensive Performance Evaluation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 36(15), pages 5823-5838, December.
- Inkyung Min & Nakyung Lee & Sanha Kim & Yelim Bang & Juyeon Jang & Kichul Jung & Daeryong Park, 2024. "An Improved Aggregation–Decomposition Optimization Approach for Ecological Flow Supply in Parallel Reservoir Systems," Sustainability, MDPI, vol. 16(17), pages 1-22, August.
- Feng, Zhong-kai & Huang, Qing-qing & Niu, Wen-jing & Su, Hua-ying & Li, Shu-shan & Wu, Hui-jun & Wang, Jia-yang, 2024. "Peak operation optimization of cascade hydropower reservoirs and solar power plants considering output forecasting uncertainty," Applied Energy, Elsevier, vol. 358(C).
- Favaro, Pietro & Dolányi, Mihály & Vallée, François & Toubeau, Jean-François, 2024. "Neural network informed day-ahead scheduling of pumped hydro energy storage," Energy, Elsevier, vol. 289(C).
- Mi Zhang & Guosheng Zhou & Bei Liu & Dajun Huang & Hao Yu & Li Mo, 2025. "Multi-Timescale Nested Hydropower Station Optimization Scheduling Based on the Migrating Particle Whale Optimization Algorithm," Energies, MDPI, vol. 18(7), pages 1-19, April.
- Jiefeng Duan & Zhiqiang Jiang, 2022. "Joint Scheduling Optimization of a Short-Term Hydrothermal Power System Based on an Elite Collaborative Search Algorithm," Energies, MDPI, vol. 15(13), pages 1-18, June.
- Roberto Asano & Fabiana de Oliveira Ferreira & Jacyro Gramulia & Patrícia Teixeira Leite Asano, 2024. "Integration of Water Transfers in Hydropower Operation Planning," Energies, MDPI, vol. 17(23), pages 1-16, November.
- Yong-Gun Kim & Myong-Bong Jo & Pyol Kim & Song-Nam Oh & Chung-Hyok Paek & Sung-Ryol So, 2021. "Effective Optimization-Simulation Model for Flood Control of Cascade Barrage Network," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 35(1), pages 135-157, January.
- Suwapat Kosasaeng & Nirat Yamoat & Seyed Mohammad Ashrafi & Anongrit Kangrang, 2022. "Extracting Optimal Operation Rule Curves of Multi-Reservoir System Using Atom Search Optimization, Genetic Programming and Wind Driven Optimization," Sustainability, MDPI, vol. 14(23), pages 1-14, December.
More about this item
Keywords
power optimization scheduling; cascade reservoir joint scheduling; whale optimization algorithm; sustainable development; water resources;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:17:y:2025:i:3:p:1018-:d:1577923. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.