IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v156y2014icp167-168.html
   My bibliography  Save this article

Note on “The economic lot-sizing problem with remanufacturing and one-way substitution”

Author

Listed:
  • Piñeyro, Pedro
  • Viera, Omar

Abstract

In Piñeyro and Viera (2010) (Int. J. Prod. Econ. 124 (2), 2010, 482–488) we investigate a lot-sizing problem with different demand streams for new and remanufactured items, in which remanufactured products can be substituted by new products, but not vice versa. In this note we correct some typos that appear in that paper and review the analysis carried out about the problem decomposition into easier subproblems of production, remanufacturing and final disposing.

Suggested Citation

  • Piñeyro, Pedro & Viera, Omar, 2014. "Note on “The economic lot-sizing problem with remanufacturing and one-way substitution”," International Journal of Production Economics, Elsevier, vol. 156(C), pages 167-168.
  • Handle: RePEc:eee:proeco:v:156:y:2014:i:c:p:167-168
    DOI: 10.1016/j.ijpe.2014.06.003
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527314001868
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2014.06.003?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Piñeyro, Pedro & Viera, Omar, 2010. "The economic lot-sizing problem with remanufacturing and one-way substitution," International Journal of Production Economics, Elsevier, vol. 124(2), pages 482-488, April.
    2. Inderfurth, Karl, 2004. "Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution," International Journal of Production Economics, Elsevier, vol. 90(3), pages 325-343, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Syed Ali, Sharifah Aishah & Doostmohammadi, Mahdi & Akartunalı, Kerem & van der Meer, Robert, 2018. "A theoretical and computational analysis of lot-sizing in remanufacturing with separate setups," International Journal of Production Economics, Elsevier, vol. 203(C), pages 276-285.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ahmed Senoussi & Youcef Boutarfa & Nadjib Brahimi & Tarik Aouam, 2024. "Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution," Post-Print hal-05030212, HAL.
    2. Lin, Yizhong & Leung, Janny M.Y. & Zhang, Lianmin & Gu, Jia-Wen, 2020. "Single-item repairable inventory system with stochastic new and warranty demands," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 142(C).
    3. Ahmed Senoussi & Youcef Boutarfa & Nadjib Brahimi & Tarik Aouam, 2024. "Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution," Sustainability, MDPI, vol. 16(17), pages 1-33, August.
    4. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
    5. Piñeyro, Pedro & Viera, Omar, 2010. "The economic lot-sizing problem with remanufacturing and one-way substitution," International Journal of Production Economics, Elsevier, vol. 124(2), pages 482-488, April.
    6. A. K. Gaula & J. K. Jha, 2024. "Pricing strategy with quality improvement in a dual collection channel closed-loop supply chain under return uncertainty," Operational Research, Springer, vol. 24(2), pages 1-40, June.
    7. Soumita Kundu & Tripti Chakrabarti & Dipak Kumar Jana, 2014. "Optimal Manufacturing-Remanufacturing Production Policy for a Closed-Loop Supply Chain under Fill Rate and Budget Constraint in Bifuzzy Environments," International Journal of Mathematics and Mathematical Sciences, Hindawi, vol. 2014, pages 1-14, June.
    8. Zhang, Zhi-Hai & Jiang, Hai & Pan, Xunzhang, 2012. "A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 140(1), pages 249-255.
    9. Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
    10. Dhahri, Akrem & Gharbi, Ali & Ouhimmou, Mustapha, 2022. "Integrated production-delivery control policy for an unreliable manufacturing system and multiple retailers," International Journal of Production Economics, Elsevier, vol. 245(C).
    11. Boutarfa, Y. & Senoussi, A. & Brahimi, N. & Aouam, T., 2024. "Integration and substitution in hybrid manufacturing and refurbishing systems," International Journal of Production Economics, Elsevier, vol. 274(C).
    12. Wei, Cansheng & Li, Yongjian & Cai, Xiaoqiang, 2011. "Robust optimal policies of production and inventory with uncertain returns and demand," International Journal of Production Economics, Elsevier, vol. 134(2), pages 357-367, December.
    13. Syed Ali, Sharifah Aishah & Doostmohammadi, Mahdi & Akartunalı, Kerem & van der Meer, Robert, 2018. "A theoretical and computational analysis of lot-sizing in remanufacturing with separate setups," International Journal of Production Economics, Elsevier, vol. 203(C), pages 276-285.
    14. Laurens G. Debo & L. Beril Toktay & Luk N. Van Wassenhove, 2005. "Market Segmentation and Product Technology Selection for Remanufacturable Products," Management Science, INFORMS, vol. 51(8), pages 1193-1205, August.
    15. Kumar, Akhilesh & Chinnam, Ratna Babu & Murat, Alper, 2017. "Hazard rate models for core return modeling in auto parts remanufacturing," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 354-361.
    16. Lu, Fen & Xu, He & Chen, Pengyu & Zhu, Stuart X., 2018. "Joint pricing and production decisions with yield uncertainty and downconversion," International Journal of Production Economics, Elsevier, vol. 197(C), pages 52-62.
    17. Pokharel, Shaligram & Mutha, Akshay, 2009. "Perspectives in reverse logistics: A review," Resources, Conservation & Recycling, Elsevier, vol. 53(4), pages 175-182.
    18. Liao, Gwo-Liang & Sheu, Shey-Huei, 2011. "Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 130(1), pages 118-124, March.
    19. Assid, M. & Gharbi, A. & Hajji, A., 2020. "Production control of failure-prone manufacturing-remanufacturing systems using mixed dedicated and shared facilities," International Journal of Production Economics, Elsevier, vol. 224(C).
    20. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:156:y:2014:i:c:p:167-168. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.