Green-component life-cycle value on design and reverse manufacturing in semi-closed supply chain
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
- Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
- Bonney, Maurice & Ratchev, Svetan & Moualek, Idir, 2003. "The changing relationship between production and inventory examined in a concurrent engineering context," International Journal of Production Economics, Elsevier, vol. 81(1), pages 243-254, January.
- Viswanathan, S., 1998. "Optimal strategy for the integrated vendor-buyer inventory model," European Journal of Operational Research, Elsevier, vol. 105(1), pages 38-42, February.
- BayIndIr, Z. Pelin & Dekker, Rommert & Porras, Eric, 2006.
"Determination of recovery effort for a probabilistic recovery system under various inventory control policies,"
Omega, Elsevier, vol. 34(6), pages 571-584, December.
- Bayindir, Z.P. & Dekker, R. & Porras Musalem, E., 2004. "Determination of recovery effort for a probabilistic recovery system under various inventory control policies," Econometric Institute Research Papers EI 2004-08, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- de Brito, M.P. & Flapper, S.D.P. & Dekker, R., 2002. "Reverse logistics," Econometric Institute Research Papers EI 2002-21, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Kim, Seung-Lae & Ha, Daesung, 2003. "A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage," International Journal of Production Economics, Elsevier, vol. 86(1), pages 1-10, October.
- Yang, P. C. & Wee, H. M., 2002. "A single-vendor and multiple-buyers production-inventory policy for a deteriorating item," European Journal of Operational Research, Elsevier, vol. 143(3), pages 570-581, December.
- Kelle, Peter & Al-khateeb, Faisal & Anders Miller, Pam, 2003. "Partnership and negotiation support by joint optimal ordering/setup policies for JIT," International Journal of Production Economics, Elsevier, vol. 81(1), pages 431-441, January.
- Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
- Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ho, Chia-Huei & Ouyang, Liang-Yuh & Su, Chia-Hsien, 2008. "Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit," European Journal of Operational Research, Elsevier, vol. 187(2), pages 496-510, June.
- Chung, Chun-Jen & Wee, Hui-Ming, 2011. "Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system," International Journal of Production Economics, Elsevier, vol. 129(1), pages 195-203, January.
- Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
- Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
- Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
- Sucky, Eric, 2006. "A bargaining model with asymmetric information for a single supplier-single buyer problem," European Journal of Operational Research, Elsevier, vol. 171(2), pages 516-535, June.
- B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
- Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.
- Jiafu Tang & Kai-Leung Yung & Iko Kaku & Jianbo Yang, 2008. "The scheduling of deliveries in a production-distribution system with multiple buyers," Annals of Operations Research, Springer, vol. 161(1), pages 5-23, July.
- Chiou, Chuang-Chun & Yao, Ming-Jong & Tsai, Jenteng, 2007. "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 314-328, July.
- Goyal, Suresh Kumar & Chang, Chun-Tao, 2009. "Optimal ordering and transfer policy for an inventory with stock dependent demand," European Journal of Operational Research, Elsevier, vol. 196(1), pages 177-185, July.
- Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
- Yuan-Shyi Peter Chiu & Chih-An Katherine Lin & Huei-Hsin Chang & Victoria Chiu, 2010. "Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance," Mathematical and Computer Modelling of Dynamical Systems, Taylor & Francis Journals, vol. 16(4), pages 373-388, July.
- Lee, Shine-Der & Fu, Yen-Chen, 2014. "Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 66(C), pages 23-35.
- Bylka, Stanislaw, 2009. "Non-cooperative strategies for production and shipments lot sizing in the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 118(1), pages 243-252, March.
- AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
- Zhou, Yong-Wu & Wang, Sheng-Dong, 2007. "Optimal production and shipment models for a single-vendor-single-buyer integrated system," European Journal of Operational Research, Elsevier, vol. 180(1), pages 309-328, July.
- Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
- David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
- Kelle, Peter & Miller, Pamela A. & Akbulut, Asli Y., 2007. "Coordinating ordering/shipment policy for buyer and supplier: Numerical and empirical analysis of influencing factors," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 100-110, July.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:113:y:2008:i:2:p:528-545. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.