IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v290y2021i2p453-468.html
   My bibliography  Save this article

Due-window assignment scheduling problem with stochastic processing times

Author

Listed:
  • Yue, Qing
  • Zhou, Shenghai

Abstract

In operational systems, scheduling and due-window assignment are two common decisions. At the same time, many sources of uncertainty existed in operational systems make the processing times of jobs stochastic. In this paper, two specific due-window assignment scheduling problems with different distributional information regarding the processing times are studied. In the first problem, the processing times follow normal distribution, whereas in the second problem, there is only information about the mean and variance of the processing time of each job, but no information about the specific distribution pattern. The objective of both problems is to determine a due window for each job and a processing schedule for all jobs to minimize total expected weighted costs for earliness, tardiness and due-window assignment. For the first problem, we analyze the optimal due-window assignment and propose a branch-and-bound algorithm to find an optimal solution. For the second problem, we first establish an approximated problem based on developed upper and lower bounds, and then develop a branch-and-bound algorithm to solve the approximated problem optimally. Finally, computational experiments are conducted to evaluate the performance of the proposed algorithms and the efficiency of the problem approximation. Through computational experiments, some managerial insights are derived.

Suggested Citation

  • Yue, Qing & Zhou, Shenghai, 2021. "Due-window assignment scheduling problem with stochastic processing times," European Journal of Operational Research, Elsevier, vol. 290(2), pages 453-468.
  • Handle: RePEc:eee:ejores:v:290:y:2021:i:2:p:453-468
    DOI: 10.1016/j.ejor.2020.08.029
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221720307426
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2020.08.029?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chuanli Zhao & Hengyong Tang, 2015. "Due-Window Assignment for a Single Machine Scheduling with Both Deterioration and Positional Effects," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 32(03), pages 1-11.
    2. B Mor & G Mosheiov, 2012. "Minmax scheduling problems with common flow-allowance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 63(9), pages 1284-1293, September.
    3. Yeung, W. K. & Oguz, Ceyda & Edwin Cheng, T. C., 2004. "Two-stage flowshop earliness and tardiness machine scheduling involving a common due window," International Journal of Production Economics, Elsevier, vol. 90(3), pages 421-434, August.
    4. Baker, Kenneth R. & Trietsch, Dan, 2009. "Safe scheduling: Setting due dates in single-machine problems," European Journal of Operational Research, Elsevier, vol. 196(1), pages 69-77, July.
    5. Dujuan Wang & Yunqiang Yin & T.C.E. Cheng, 2017. "A bicriterion approach to common flow allowances due window assignment and scheduling with controllable processing times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 64(1), pages 41-63, February.
    6. Biskup, Dirk & Feldmann, Martin, 2005. "On scheduling around large restrictive common due windows," European Journal of Operational Research, Elsevier, vol. 162(3), pages 740-761, May.
    7. Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.
    8. Lu Liu & Jian-Jun Wang & Xiao-Yuan Wang, 2016. "Single machine due-window assignment scheduling with resource-dependent processing times to minimise total resource consumption cost," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1186-1195, February.
    9. Yunqiang Yin & Du-Juan Wang & T C E Cheng & Chin-Chia Wu, 2016. "Bi-criterion single-machine scheduling and due-window assignment with common flow allowances and resource-dependent processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(9), pages 1169-1183, September.
    10. Baker, Kenneth R., 2014. "Minimizing earliness and tardiness costs in stochastic scheduling," European Journal of Operational Research, Elsevier, vol. 236(2), pages 445-452.
    11. Lemos, R.F. & Ronconi, D.P., 2015. "Heuristics for the stochastic single-machine problem with E/T costs," International Journal of Production Economics, Elsevier, vol. 168(C), pages 131-142.
    12. X. Cai & F. S. Tu, 1996. "Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early‐tardy penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1127-1146, December.
    13. Soroush, H. M., 1999. "Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs," European Journal of Operational Research, Elsevier, vol. 113(2), pages 450-468, March.
    14. Qing Yue & Guohua Wan, 2016. "Single machine SLK/DIF due window assignment problem with job-dependent linear deterioration effects," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(6), pages 872-883, June.
    15. Camilo Mancilla & Robert Storer, 2012. "A sample average approximation approach to stochastic appointment sequencing and scheduling," IISE Transactions, Taylor & Francis Journals, vol. 44(8), pages 655-670.
    16. J Liu & Y Wang & X Min, 2014. "Single-machine scheduling with common due-window assignment for deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 65(2), pages 291-301, February.
    17. Xia, Yu & Chen, Bintong & Yue, Jinfeng, 2008. "Job sequencing and due date assignment in a single machine shop with uncertain processing times," European Journal of Operational Research, Elsevier, vol. 184(1), pages 63-75, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jin Qian & Yu Zhan, 2022. "The Due Window Assignment Problems with Deteriorating Job and Delivery Time," Mathematics, MDPI, vol. 10(10), pages 1-16, May.
    2. Yi-Chun Wang & Si-Han Wang & Ji-Bo Wang, 2023. "Resource Allocation Scheduling with Position-Dependent Weights and Generalized Earliness–Tardiness Cost," Mathematics, MDPI, vol. 11(1), pages 1-11, January.
    3. Zong-Jun Wei & Li-Yan Wang & Lei Zhang & Ji-Bo Wang & Ershen Wang, 2023. "Single-Machine Maintenance Activity Scheduling with Convex Resource Constraints and Learning Effects," Mathematics, MDPI, vol. 11(16), pages 1-21, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lemos, R.F. & Ronconi, D.P., 2015. "Heuristics for the stochastic single-machine problem with E/T costs," International Journal of Production Economics, Elsevier, vol. 168(C), pages 131-142.
    2. Baruch Mor & Gur Mosheiov, 2021. "Minmax due-date assignment on a two-machine flowshop," Annals of Operations Research, Springer, vol. 305(1), pages 191-209, October.
    3. Xue Huang & Na Yin & Wei-Wei Liu & Ji-Bo Wang, 2020. "Common Due Window Assignment Scheduling with Proportional Linear Deterioration Effects," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 37(01), pages 1-15, January.
    4. Baker, Kenneth R., 2014. "Minimizing earliness and tardiness costs in stochastic scheduling," European Journal of Operational Research, Elsevier, vol. 236(2), pages 445-452.
    5. Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.
    6. Mor, Baruch & Mosheiov, Gur, 2016. "Minsum and minmax scheduling on a proportionate flowshop with common flow-allowance," European Journal of Operational Research, Elsevier, vol. 254(2), pages 360-370.
    7. Al-Hinai, Nasr & ElMekkawy, T.Y., 2011. "Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm," International Journal of Production Economics, Elsevier, vol. 132(2), pages 279-291, August.
    8. Yunqiang Yin & Du-Juan Wang & T C E Cheng & Chin-Chia Wu, 2016. "Bi-criterion single-machine scheduling and due-window assignment with common flow allowances and resource-dependent processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(9), pages 1169-1183, September.
    9. Tugba Saraç & Feristah Ozcelik & Mehmet Ertem, 2023. "Unrelated parallel machine scheduling problem with stochastic sequence dependent setup times," Operational Research, Springer, vol. 23(3), pages 1-19, September.
    10. Xinyu Sun & Xin-Na Geng & Tao Liu, 2020. "Due-window assignment scheduling in the proportionate flow shop setting," Annals of Operations Research, Springer, vol. 292(1), pages 113-131, September.
    11. Baruch Mor, 2022. "Minmax common flow-allowance problems with convex resource allocation and position-dependent workloads," Journal of Combinatorial Optimization, Springer, vol. 43(1), pages 79-97, January.
    12. Szkatuła, Krzysztof, 2017. "Impact of deadline intervals on behavior of solutions to the random Sequencing Jobs with Deadlines problem," European Journal of Operational Research, Elsevier, vol. 262(1), pages 40-45.
    13. Xiaoyan Li & Xuedong Liang & Zhi Li, 2023. "The Strategy of Strengthening Efficiency and Environmental Performance of Product Changeover in the Multiproduct Production System," SAGE Open, , vol. 13(3), pages 21582440231, September.
    14. Wu, Chin-Chia & Lee, Wen-Chiung, 2006. "Two-machine flowshop scheduling to minimize mean flow time under linear deterioration," International Journal of Production Economics, Elsevier, vol. 103(2), pages 572-584, October.
    15. Su, Ling-Huey & Tien, Yi-Yu, 2011. "Minimizing mean absolute deviation of completion time about a common due window subject to maximum tardiness for a single machine," International Journal of Production Economics, Elsevier, vol. 134(1), pages 196-203, November.
    16. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    17. Shenghai Zhou & Yichuan Ding & Woonghee Tim Huh & Guohua Wan, 2021. "Constant Job‐Allowance Policies for Appointment Scheduling: Performance Bounds and Numerical Analysis," Production and Operations Management, Production and Operations Management Society, vol. 30(7), pages 2211-2231, July.
    18. Xia, Yu & Chen, Bintong & Yue, Jinfeng, 2008. "Job sequencing and due date assignment in a single machine shop with uncertain processing times," European Journal of Operational Research, Elsevier, vol. 184(1), pages 63-75, January.
    19. Rong-Rong Mao & Yi-Chun Wang & Dan-Yang Lv & Ji-Bo Wang & Yuan-Yuan Lu, 2023. "Delivery Times Scheduling with Deterioration Effects in Due Window Assignment Environments," Mathematics, MDPI, vol. 11(18), pages 1-18, September.
    20. Shen, Zuo-Jun Max & Xie, Jingui & Zheng, Zhichao & Zhou, Han, 2023. "Dynamic scheduling with uncertain job types," European Journal of Operational Research, Elsevier, vol. 309(3), pages 1047-1060.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:290:y:2021:i:2:p:453-468. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.