IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v24y1978i6p587-598.html
   My bibliography  Save this item

The Economic Lot Scheduling Problem (ELSP): Review and Extensions

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2017. "Flexible lot sizing in hybrid make-to-order/make-to-stock production planning," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1014-1023.
  2. Yang, Jun & Yan, Houmin & Sethi, Suresh P., 1999. "Optimal production planning in pull flow lines with multiple products," European Journal of Operational Research, Elsevier, vol. 119(3), pages 582-604, December.
  3. B.C. Giri & I. Moon & W.Y. Yun, 2003. "Scheduling economic lot sizes in deteriorating production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(6), pages 650-661, September.
  4. George Liberopoulos & Dimitrios Pandelis & Olympia Hatzikonstantinou, 2013. "The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers," Annals of Operations Research, Springer, vol. 209(1), pages 179-205, October.
  5. Salvietti, Luciano & Smith, Neale R., 2008. "A profit-maximizing economic lot scheduling problem with price optimization," European Journal of Operational Research, Elsevier, vol. 184(3), pages 900-914, February.
  6. Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
  7. Martin I. Reiman & Lawrence M. Wein, 1998. "Dynamic Scheduling of a Two-Class Queue with Setups," Operations Research, INFORMS, vol. 46(4), pages 532-547, August.
  8. Ramesh Bollapragada & Uday Rao, 1999. "Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines," Management Science, INFORMS, vol. 45(6), pages 889-904, June.
  9. Sarker, Bhaba R. & Diponegoro, Ahmad, 2009. "Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers," European Journal of Operational Research, Elsevier, vol. 194(3), pages 753-773, May.
  10. Tang, Loon Ching & Lee, Loo Hay, 2005. "A simple recovery strategy for economic lot scheduling problem: A two-product case," International Journal of Production Economics, Elsevier, vol. 98(1), pages 97-107, October.
  11. Drexl, Andreas & Jordan, Carsten & Kimms, Alf, 1997. "Gruppierungs- und Reihenfolgeprobleme in der Fertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 447, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  12. Fabrizio Marinelli & Maria Nenni & Antonio Sforza, 2007. "Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company," Annals of Operations Research, Springer, vol. 150(1), pages 177-192, March.
  13. Jensen, Mikkel T. & Khouja, Moutaz, 2004. "An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem," European Journal of Operational Research, Elsevier, vol. 156(2), pages 305-311, July.
  14. S Sharma, 2004. "Optimal production policy with shelf life including shortages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(8), pages 902-909, August.
  15. G-C Lee & Y-D Kim & J-G Kim & S-H Choi, 2003. "A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(10), pages 1038-1049, October.
  16. Beck, Fabian G. & Biel, Konstantin & Glock, Christoph H., 2019. "Integration of energy aspects into the economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 209(C), pages 399-410.
  17. Van Nieuwenhuyse, Inneke & Vandaele, Nico & Rajaram, Kumar & Karmarkar, Uday S., 2007. "Buffer sizing in multi-product multi-reactor batch processes: Impact of allocation and campaign sizing policies," European Journal of Operational Research, Elsevier, vol. 179(2), pages 424-443, June.
  18. S. Ganesan & R. Uthayakumar, 2023. "An EPQ model for a single-machine multiproduct imperfect production system using a hybrid logarithmic barrier method," OPSEARCH, Springer;Operational Research Society of India, vol. 60(3), pages 1121-1152, September.
  19. Sarin, Subhash C. & Kalir, Adar A. & Chen, Ming, 2008. "A single-lot, unified cost-based flow shop lot-streaming problem," International Journal of Production Economics, Elsevier, vol. 113(1), pages 413-424, May.
  20. Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
  21. Daniel Adelman & Christiane Barz, 2014. "A Unifying Approximate Dynamic Programming Model for the Economic Lot Scheduling Problem," Mathematics of Operations Research, INFORMS, vol. 39(2), pages 374-402, May.
  22. Michael J. Fry & Roman Kapuscinski & Tava Lennon Olsen, 2001. "Coordinating Production and Delivery Under a (z, Z)-Type Vendor-Managed Inventory Contract," Manufacturing & Service Operations Management, INFORMS, vol. 3(2), pages 151-173, August.
  23. Pesenti, Raffaele & Ukovich, Walter, 2003. "Economic lot scheduling on multiple production lines with resource constraints," International Journal of Production Economics, Elsevier, vol. 81(1), pages 469-481, January.
  24. Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.
  25. Ming-Jong Yao, 2005. "The Economic Lot Scheduling Problem without Capacity Constraints," Annals of Operations Research, Springer, vol. 133(1), pages 193-205, January.
  26. Mehdi Rajabi Asadabadi, 2017. "A developed slope order index (SOI) for bottlenecks in projects and production lines," Computational Management Science, Springer, vol. 14(2), pages 281-291, April.
  27. Yokoyama, Masao, 1999. "The eclectic model for stochastic dynamic production cycling problem," International Journal of Production Economics, Elsevier, vol. 60(1), pages 359-367, April.
  28. Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
  29. P. C. Geng & R. G. Vickson, 1988. "Two heuristics for the economic lot scheduling problem: An experimental study," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(4), pages 605-617, August.
  30. Grznar, J. & Riggle, C., 1997. "An optimal algorithm for the basic period approach to the economic lot scheduling problem," Omega, Elsevier, vol. 25(3), pages 355-364, June.
  31. Armentano, Vinícius A. & França, Paulo M. & de Toledo, Franklina M. B., 1999. "A network flow model for the capacitated lot-sizing problem," Omega, Elsevier, vol. 27(2), pages 275-284, April.
  32. Nicholas G. Hall, 1988. "A multi‐item EOQ model with inventory cycle balancing," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(3), pages 319-325, June.
  33. Holmbom, Martin & Segerstedt, Anders, 2014. "Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 82-90.
  34. Heuts, R.M.J. & Nederstigt, P. & Roebroek, W. & Selen, W.J., 1992. "Multi-product cycling with packaging in the process industry," Other publications TiSEM 533d6bbb-e61a-4e4b-a44e-1, Tilburg University, School of Economics and Management.
  35. Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
  36. Kumar Rajaram & Uday S. Karmarkar, 2002. "Product Cycling With Uncertain Yields: Analysis and Application to the Process Industry," Operations Research, INFORMS, vol. 50(4), pages 680-691, August.
  37. Drexl, Andreas & Kimms, Alf, 1996. "Lot sizing and scheduling: Survey and extensions," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 421, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  38. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
  39. Nicholas G. Hall, 1989. "The inventory packing problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 36(4), pages 399-418, August.
  40. Kumar Rajaram & Uday S. Karmarkar, 2004. "Campaign Planning and Scheduling for Multiproduct Batch Operations with Applications to the Food-Processing Industry," Manufacturing & Service Operations Management, INFORMS, vol. 6(3), pages 253-269, October.
  41. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  42. Carstensen, Peter, 1997. "Das Economic Lot Scheduling Problem: Überblick und LP-basiertes Verfahren," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 465, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  43. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
  44. Kelle, Peter & Peak, David, 1996. "A comparison of fixed and adaptive type controls for multi-product processing," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 139-146, August.
  45. Goncalves, JoseF. & Leachman, Robert C., 1998. "A hybrid heuristic and linear programming approach to multi-product machine scheduling," European Journal of Operational Research, Elsevier, vol. 110(3), pages 548-563, November.
  46. Sağlam, Ümit & Banerjee, Avijit, 2018. "Integrated multiproduct batch production and truck shipment scheduling under different shipping policies," Omega, Elsevier, vol. 74(C), pages 70-81.
  47. Coelho, Leandro C. & Laporte, Gilbert, 2014. "Improved solutions for inventory-routing problems through valid inequalities and input ordering," International Journal of Production Economics, Elsevier, vol. 155(C), pages 391-397.
  48. Leven, Erik & Segerstedt, Anders, 2007. "A scheduling policy for adjusting economic lot quantities to a feasible solution," European Journal of Operational Research, Elsevier, vol. 179(2), pages 414-423, June.
  49. Briskorn, Dirk & Zeise, Philipp & Packowski, Josef, 2016. "Quasi-fixed cyclic production schemes for multiple products with stochastic demand," European Journal of Operational Research, Elsevier, vol. 252(1), pages 156-169.
  50. Fransoo, Jan C. & Sridharan, V. & Bertrand, J.Will M., 1995. "A hierarchical approach for capacity coordination in multiple products single-machine production systems with stationary stochastic demands," European Journal of Operational Research, Elsevier, vol. 86(1), pages 57-72, October.
  51. McGee, Victor E. & Pyke, David F., 1996. "Periodic production scheduling at a fastener manufacturer," International Journal of Production Economics, Elsevier, vol. 46(1), pages 65-87, December.
  52. Nazrul Shaikh & Vittal Prabhu & Danilo Abril & David Sánchez & Jorge Arias & Esteban Rodríguez & Germán Riaño, 2011. "Kimberly-Clark Latin America Builds an Optimization-Based System for Machine Scheduling," Interfaces, INFORMS, vol. 41(5), pages 455-465, October.
  53. Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
  54. Khouja, Moutaz, 1997. "The scheduling of economic lot sizes on volume flexible production systems," International Journal of Production Economics, Elsevier, vol. 48(1), pages 73-86, January.
  55. Wagner, Bret J. & Davis, Darwin J., 2002. "A search heuristic for the sequence-dependent economic lot scheduling problem," European Journal of Operational Research, Elsevier, vol. 141(1), pages 133-146, August.
  56. A. Kimms, 1997. "Demand shuffle—A method for multilevel proportional lot sizing and scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(4), pages 319-340, June.
  57. Weidenhiller, Andreas & Jodlbauer, Herbert, 2009. "Equivalence classes of problem instances for a continuous-time lot sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 199(1), pages 139-149, November.
  58. Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
  59. Teunter, Ruud & Kaparis, Konstantinos & Tang, Ou, 2008. "Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing," European Journal of Operational Research, Elsevier, vol. 191(3), pages 1241-1253, December.
  60. Robert R. Inman & Philip C. Jones & Guillermo M. Gallego, 1991. "Economic lot scheduling of fully loaded processes with external setups," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 699-713, October.
  61. Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  62. Drexl, Andreas & Haase, Knut, 1993. "Sequential-analysis-based randomized-regret-methods for lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 323, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  63. Hein, Fanny & Almeder, Christian, 2016. "Quantitative insights into the integrated supply vehicle routing and production planning problem," International Journal of Production Economics, Elsevier, vol. 177(C), pages 66-76.
  64. Bautista, Joaquín & Alfaro, Rocío & Batalla, Cristina, 2015. "Modeling and solving the mixed-model sequencing problem to improve productivity," International Journal of Production Economics, Elsevier, vol. 161(C), pages 83-95.
  65. Grubbstrom, Robert W., 1995. "Modelling production opportunities -- an historical overview," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 1-14, October.
  66. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  67. Hoque, M.A. & Kingsman, B.G., 2006. "Synchronization in common cycle lot size scheduling for a multi-product serial supply chain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 316-331, September.
  68. Serge M. Karalli & A. Dale Flowers, 2006. "The Multiple-Family ELSP with Safety Stocks," Operations Research, INFORMS, vol. 54(3), pages 523-531, June.
  69. David M. Markowitz & Lawrence M. Wein, 2001. "Heavy Traffic Analysis of Dynamic Cyclic Policies: A Unified Treatment of the Single Machine Scheduling Problem," Operations Research, INFORMS, vol. 49(2), pages 246-270, April.
  70. Bongjin Gim & Min-Hong Han, 1997. "Economic scheduling of products with N components on a single machine," European Journal of Operational Research, Elsevier, vol. 96(3), pages 570-577, February.
  71. Gong, Qiguo & Chen, Guohui & Zhang, Wen & Wang, Hui, 2022. "The role of humans in flexible smart factories," International Journal of Production Economics, Elsevier, vol. 254(C).
  72. Sox, Charles R. & Jackson, Peter L. & Bowman, Alan & Muckstadt, John A., 1999. "A review of the stochastic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 62(3), pages 181-200, September.
  73. Heuts, R.M.J. & Nederstigt, P. & Roebroek, W. & Selen, W.J., 1992. "Multi-product cycling with packaging in the process industry," Research Memorandum FEW 544, Tilburg University, School of Economics and Management.
  74. Wei-Min Lan & Tava Lennon Olsen, 2006. "Multiproduct Systems with Both Setup Times and Costs: Fluid Bounds and Schedules," Operations Research, INFORMS, vol. 54(3), pages 505-522, June.
  75. Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
  76. Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung, 2006. "A genetic algorithm for solving a fuzzy economic lot-size scheduling problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 265-288, August.
  77. Khouja, Moutaz & Michalewicz, Zgibniew & Wilmot, Michael, 1998. "The use of genetic algorithms to solve the economic lot size scheduling problem," European Journal of Operational Research, Elsevier, vol. 110(3), pages 509-524, November.
  78. Guillermo Gallego & Robin Roundy, 1992. "The economic lot scheduling problem with finite backorder costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 729-739, August.
  79. David M. Markowitz & Martin I. Reiman & Lawrence M. Wein, 2000. "The Stochastic Economic Lot Scheduling Problem: Heavy Traffic Analysis of Dynamic Cyclic Policies," Operations Research, INFORMS, vol. 48(1), pages 136-154, February.
  80. Van den broecke, Frank & Van Landeghem, Hendrik & Aghezzaf, El-Houssaine, 2008. "Implementing a near-optimal solution for the multi-stage, multi-product capacitated lot-sizing problem by rolling out a cyclical production plan," International Journal of Production Economics, Elsevier, vol. 112(1), pages 121-137, March.
  81. Menezes, Mozart B.C. & Jalali, Hamed & Lamas, Alejandro, 2021. "One too many: Product proliferation and the financial performance in manufacturing," International Journal of Production Economics, Elsevier, vol. 242(C).
  82. Rappold, James A. & Yoho, Keenan D., 2014. "Setting safety stocks for stable rotation cycle schedules," International Journal of Production Economics, Elsevier, vol. 156(C), pages 146-158.
  83. Brander, Par & Leven, Erik & Segerstedt, Anders, 2005. "Lot sizes in a capacity constrained facility--a simulation study of stationary stochastic demand," International Journal of Production Economics, Elsevier, vol. 93(1), pages 375-386, January.
  84. Teunter, Ruud & Tang, Ou & Kaparis, Konstantinos, 2009. "Heuristics for the economic lot scheduling problem with returns," International Journal of Production Economics, Elsevier, vol. 118(1), pages 323-330, March.
  85. Sampath Rajagopalan & Jayashankar M. Swaminathan, 2001. "A Coordinated Production Planning Model with Capacity Expansion and Inventory Management," Management Science, INFORMS, vol. 47(11), pages 1562-1580, November.
  86. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.