IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v219y2012i2p396-404.html
   My bibliography  Save this article

Economic lot scheduling with deliberated and controlled coproduction

Author

Listed:
  • Vidal-Carreras, Pilar I.
  • Garcia-Sabater, Jose P.
  • Coronado-Hernandez, Jairo R.

Abstract

This paper presents an algorithm to define the optimal parameters for deliberated and controlled coproduction in an economic lot scheduling problem setting (DCCELSP). Coproduction is said to be deliberated and controlled because it is possible to decide whether or not to coproduce when all the parameters associated with the process are known. The aim is to determine how to produce two products most economically where deliberated coproduction is an option. For this purpose, a procedure for defining optimal lot periods is introduced. Two models are proposed for this procedure and a numerical illustration is provided to gain insight into their dynamics. The cost advantages of coproduction were found to depend on the relationship between setup and holding costs, production rates, and demand for products. The more similar these system parameters are and the higher the machine usage ratio is, the more favourable coproduction is. Additionally, if coproduction is not deliberated appropriately, costs soar.

Suggested Citation

  • Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
  • Handle: RePEc:eee:ejores:v:219:y:2012:i:2:p:396-404
    DOI: 10.1016/j.ejor.2011.12.020
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221711010976
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2011.12.020?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Steven Nahmias & Kamran Moinzadeh, 1997. "Lot Sizing with Randomly Graded Yields," Operations Research, INFORMS, vol. 45(6), pages 974-989, December.
    2. Gregory Dobson, 1987. "The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes," Operations Research, INFORMS, vol. 35(5), pages 764-771, October.
    3. Sox, Charles R. & Jackson, Peter L. & Bowman, Alan & Muckstadt, John A., 1999. "A review of the stochastic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 62(3), pages 181-200, September.
    4. Christian M. Delporte & L. Joseph Thomas, 1977. "Lot Sizing and Sequencing for N Products on One Facility," Management Science, INFORMS, vol. 23(10), pages 1070-1079, June.
    5. Gabriel R. Bitran & Thin-Yin Leong, 1992. "Deterministic Approximations to Co-Production Problems with Service Constraints and Random Yields," Management Science, INFORMS, vol. 38(5), pages 724-742, May.
    6. Salah E. Elmaghraby, 1978. "The Economic Lot Scheduling Problem (ELSP): Review and Extensions," Management Science, INFORMS, vol. 24(6), pages 587-598, February.
    7. Narro Lopez, Miguel A. & Kingsman, Brian G., 1991. "The economic lot scheduling problem: theory and practice," International Journal of Production Economics, Elsevier, vol. 23(1-3), pages 147-164, October.
    8. Wen-Lian Hsu, 1983. "On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine," Management Science, INFORMS, vol. 29(1), pages 93-105, January.
    9. Earl E. Bomberger, 1966. "A Dynamic Programming Approach to a Lot Size Scheduling Problem," Management Science, INFORMS, vol. 12(11), pages 778-784, July.
    10. HSU, Wen-Lian, 1983. "On the general feasibility test of scheduling lot sizes for several products on one machine," LIDAM Reprints CORE 515, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    11. J. G. Madigan, 1968. "Scheduling a Multi-Product Single Machine System for an Infinite Planning Period," Management Science, INFORMS, vol. 14(11), pages 713-719, July.
    12. Bryan L. Deuermeyer, 1979. "A Multi-Type Production System for Perishable Inventories," Operations Research, INFORMS, vol. 27(5), pages 935-943, October.
    13. Gabriel R. Bitran & Stephen M. Gilbert, 1994. "Co-Production Processes with Random Yields in the Semiconductor Industry," Operations Research, INFORMS, vol. 42(3), pages 476-491, June.
    14. Caner TaskIn, Z. & Tamer Ünal, A., 2009. "Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products," European Journal of Operational Research, Elsevier, vol. 199(1), pages 252-261, November.
    15. Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
    16. Oner, Selma & Bilgic, Taner, 2008. "Economic lot scheduling with uncontrolled co-production," European Journal of Operational Research, Elsevier, vol. 188(3), pages 793-810, August.
    17. C. Loren Doll & D. Clay Whybark, 1973. "An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem," Management Science, INFORMS, vol. 20(1), pages 50-55, September.
    18. G. R. Bitran & S. Dasu, 1992. "Ordering Policies in an environment of Stochastic Yields and Substitutable Demands," Operations Research, INFORMS, vol. 40(5), pages 999-1017, October.
    19. Bryan L. Deuermeyer & William P. Pierskalla, 1978. "A By-Product Production System with an Alternative," Management Science, INFORMS, vol. 24(13), pages 1373-1383, September.
    20. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. G. Rius-Sorolla & J. Maheut & Jairo R. Coronado-Hernandez & J. P. Garcia-Sabater, 2020. "Lagrangian relaxation of the generic materials and operations planning model," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 28(1), pages 105-123, March.
    2. Gregorio Rius-Sorolla & Julien Maheut & Sofia Estelles-Miguel & Jose P. Garcia-Sabater, 2021. "Collaborative Distributed Planning with Asymmetric Information. A Technological Driver for Sustainable Development," Sustainability, MDPI, vol. 13(12), pages 1-23, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Khouja, Moutaz & Michalewicz, Zgibniew & Wilmot, Michael, 1998. "The use of genetic algorithms to solve the economic lot size scheduling problem," European Journal of Operational Research, Elsevier, vol. 110(3), pages 509-524, November.
    2. Holmbom, Martin & Segerstedt, Anders, 2014. "Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 82-90.
    3. Carstensen, Peter, 1997. "Das Economic Lot Scheduling Problem: Überblick und LP-basiertes Verfahren," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 465, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    4. Khouja, Moutaz, 1997. "The scheduling of economic lot sizes on volume flexible production systems," International Journal of Production Economics, Elsevier, vol. 48(1), pages 73-86, January.
    5. Guillermo Gallego & Robin Roundy, 1992. "The economic lot scheduling problem with finite backorder costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 729-739, August.
    6. Oner, Selma & Bilgic, Taner, 2008. "Economic lot scheduling with uncontrolled co-production," European Journal of Operational Research, Elsevier, vol. 188(3), pages 793-810, August.
    7. Wagner, Bret J. & Davis, Darwin J., 2002. "A search heuristic for the sequence-dependent economic lot scheduling problem," European Journal of Operational Research, Elsevier, vol. 141(1), pages 133-146, August.
    8. Grznar, J. & Riggle, C., 1997. "An optimal algorithm for the basic period approach to the economic lot scheduling problem," Omega, Elsevier, vol. 25(3), pages 355-364, June.
    9. Beck, Fabian G. & Biel, Konstantin & Glock, Christoph H., 2019. "Integration of energy aspects into the economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 209(C), pages 399-410.
    10. Banerjee, Avijit, 2009. "Simultaneous determination of multiproduct batch and full truckload shipment schedules," International Journal of Production Economics, Elsevier, vol. 118(1), pages 111-117, March.
    11. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
    12. Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
    13. Leven, Erik & Segerstedt, Anders, 2007. "A scheduling policy for adjusting economic lot quantities to a feasible solution," European Journal of Operational Research, Elsevier, vol. 179(2), pages 414-423, June.
    14. Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae, 1996. "Investment policy for multiple product setup reduction under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 321-327, August.
    15. Salvietti, Luciano & Smith, Neale R., 2008. "A profit-maximizing economic lot scheduling problem with price optimization," European Journal of Operational Research, Elsevier, vol. 184(3), pages 900-914, February.
    16. Briskorn, Dirk & Zeise, Philipp & Packowski, Josef, 2016. "Quasi-fixed cyclic production schemes for multiple products with stochastic demand," European Journal of Operational Research, Elsevier, vol. 252(1), pages 156-169.
    17. Daniel Adelman & Christiane Barz, 2014. "A Unifying Approximate Dynamic Programming Model for the Economic Lot Scheduling Problem," Mathematics of Operations Research, INFORMS, vol. 39(2), pages 374-402, May.
    18. Sağlam, Ümit & Banerjee, Avijit, 2018. "Integrated multiproduct batch production and truck shipment scheduling under different shipping policies," Omega, Elsevier, vol. 74(C), pages 70-81.
    19. Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung, 2006. "A genetic algorithm for solving a fuzzy economic lot-size scheduling problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 265-288, August.
    20. Garn, Wolfgang & Aitken, James, 2015. "Agile factorial production for a single manufacturing line with multiple products," European Journal of Operational Research, Elsevier, vol. 245(3), pages 754-766.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:219:y:2012:i:2:p:396-404. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.