IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v81-82y2003i1p469-481.html
   My bibliography  Save this article

Economic lot scheduling on multiple production lines with resource constraints

Author

Listed:
  • Pesenti, Raffaele
  • Ukovich, Walter

Abstract

No abstract is available for this item.

Suggested Citation

  • Pesenti, Raffaele & Ukovich, Walter, 2003. "Economic lot scheduling on multiple production lines with resource constraints," International Journal of Production Economics, Elsevier, vol. 81(1), pages 469-481, January.
  • Handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:469-481
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(02)00290-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jose Juan Carreno, 1990. "Economic Lot Scheduling for Multiple Products on Parallel Identical Processors," Management Science, INFORMS, vol. 36(3), pages 348-358, March.
    2. Paul H. Zipkin, 1991. "Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem," Operations Research, INFORMS, vol. 39(1), pages 56-63, February.
    3. Salah E. Elmaghraby, 1978. "The Economic Lot Scheduling Problem (ELSP): Review and Extensions," Management Science, INFORMS, vol. 24(6), pages 587-598, February.
    4. Ramesh Bollapragada & Uday Rao, 1999. "Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines," Management Science, INFORMS, vol. 45(6), pages 889-904, June.
    5. Terry P. Harrison & Holly S. Lewis, 1996. "Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources," Management Science, INFORMS, vol. 42(1), pages 19-36, January.
    6. Wen-Lian Hsu, 1983. "On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine," Management Science, INFORMS, vol. 29(1), pages 93-105, January.
    7. HSU, Wen-Lian, 1983. "On the general feasibility test of scheduling lot sizes for several products on one machine," LIDAM Reprints CORE 515, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    8. Guillermo Gallego & Maurice Queyranne & David Simchi-Levi, 1996. "Single Resource Multi-Item Inventory Systems," Operations Research, INFORMS, vol. 44(4), pages 580-595, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Simon Thevenin & Nicolas Zufferey & Jean-Yves Potvin, 2017. "Makespan minimisation for a parallel machine scheduling problem with preemption and job incompatibility," International Journal of Production Research, Taylor & Francis Journals, vol. 55(6), pages 1588-1606, March.
    2. Nazrul Shaikh & Vittal Prabhu & Danilo Abril & David Sánchez & Jorge Arias & Esteban Rodríguez & Germán Riaño, 2011. "Kimberly-Clark Latin America Builds an Optimization-Based System for Machine Scheduling," Interfaces, INFORMS, vol. 41(5), pages 455-465, October.
    3. Tang, Loon Ching & Lee, Loo Hay, 2005. "A simple recovery strategy for economic lot scheduling problem: A two-product case," International Journal of Production Economics, Elsevier, vol. 98(1), pages 97-107, October.
    4. Alper Atamtürk & Andrés Gómez, 2020. "Submodularity in Conic Quadratic Mixed 0–1 Optimization," Operations Research, INFORMS, vol. 68(2), pages 609-630, March.
    5. Bollapragada, Ramesh & Croce, Federico Della & Ghirardi, Marco, 2011. "Discrete-time, economic lot scheduling problem on multiple, non-identical production lines," European Journal of Operational Research, Elsevier, vol. 215(1), pages 89-96, November.
    6. Torabi, S.A. & Karimi, B. & Fatemi Ghomi, S.M.T., 2005. "The common cycle economic lot scheduling in flexible job shops: The finite horizon case," International Journal of Production Economics, Elsevier, vol. 97(1), pages 52-65, July.
    7. Lin, B.M.T. & Liu, S.T., 2008. "Maximizing the reward in the relocation problem with generalized due dates," International Journal of Production Economics, Elsevier, vol. 115(1), pages 55-63, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ramesh Bollapragada & Uday Rao, 1999. "Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines," Management Science, INFORMS, vol. 45(6), pages 889-904, June.
    2. Bollapragada, Ramesh & Croce, Federico Della & Ghirardi, Marco, 2011. "Discrete-time, economic lot scheduling problem on multiple, non-identical production lines," European Journal of Operational Research, Elsevier, vol. 215(1), pages 89-96, November.
    3. Nazrul Shaikh & Vittal Prabhu & Danilo Abril & David Sánchez & Jorge Arias & Esteban Rodríguez & Germán Riaño, 2011. "Kimberly-Clark Latin America Builds an Optimization-Based System for Machine Scheduling," Interfaces, INFORMS, vol. 41(5), pages 455-465, October.
    4. Torabi, S.A. & Karimi, B. & Fatemi Ghomi, S.M.T., 2005. "The common cycle economic lot scheduling in flexible job shops: The finite horizon case," International Journal of Production Economics, Elsevier, vol. 97(1), pages 52-65, July.
    5. Khouja, Moutaz & Michalewicz, Zgibniew & Wilmot, Michael, 1998. "The use of genetic algorithms to solve the economic lot size scheduling problem," European Journal of Operational Research, Elsevier, vol. 110(3), pages 509-524, November.
    6. Guillermo Gallego & Robin Roundy, 1992. "The economic lot scheduling problem with finite backorder costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 729-739, August.
    7. Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.
    8. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
    9. B.C. Giri & I. Moon & W.Y. Yun, 2003. "Scheduling economic lot sizes in deteriorating production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(6), pages 650-661, September.
    10. Tang, Loon Ching & Lee, Loo Hay, 2005. "A simple recovery strategy for economic lot scheduling problem: A two-product case," International Journal of Production Economics, Elsevier, vol. 98(1), pages 97-107, October.
    11. Holmbom, Martin & Segerstedt, Anders, 2014. "Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 82-90.
    12. Carstensen, Peter, 1997. "Das Economic Lot Scheduling Problem: Überblick und LP-basiertes Verfahren," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 465, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    13. Briskorn, Dirk & Zeise, Philipp & Packowski, Josef, 2016. "Quasi-fixed cyclic production schemes for multiple products with stochastic demand," European Journal of Operational Research, Elsevier, vol. 252(1), pages 156-169.
    14. Daniel Adelman & Christiane Barz, 2014. "A Unifying Approximate Dynamic Programming Model for the Economic Lot Scheduling Problem," Mathematics of Operations Research, INFORMS, vol. 39(2), pages 374-402, May.
    15. Khouja, Moutaz, 1997. "The scheduling of economic lot sizes on volume flexible production systems," International Journal of Production Economics, Elsevier, vol. 48(1), pages 73-86, January.
    16. Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    17. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    18. Robert R. Inman & Philip C. Jones & Guillermo M. Gallego, 1991. "Economic lot scheduling of fully loaded processes with external setups," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 699-713, October.
    19. Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung, 2006. "A genetic algorithm for solving a fuzzy economic lot-size scheduling problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 265-288, August.
    20. S. Ganesan & R. Uthayakumar, 2023. "An EPQ model for a single-machine multiproduct imperfect production system using a hybrid logarithmic barrier method," OPSEARCH, Springer;Operational Research Society of India, vol. 60(3), pages 1121-1152, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:469-481. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.