IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v190y2011i1p93-11510.1007-s10479-009-0621-5.html
   My bibliography  Save this article

Supply network planning in the forest supply chain with bucking decisions anticipation

Author

Listed:
  • Satyaveer Chauhan
  • J.-M. Frayret
  • Luc LeBel

Abstract

We consider a two-echelon timber supply chain in which the first echelon consists of several stands to be harvested and the second echelon consists of mills to be supplied with logs of different length. This problem aims at minimizing harvesting and transportation costs for one production period, while satisfying demand expressed as a mix of volumes of specific log types. Harvesting cost, which includes felling, bucking and hauling to roadside, depends upon the number of log type to be produced and sorted. Each stand to be harvested is modeled individually with a limited number of trees of various classes of diameter and total length, which affects the productivity factors of the bucking patterns to be used. To take these characteristics into account, we propose heuristics based on columns generation to solve the supply network problem at the forest level with an anticipation of bucking operations at the stand level. Copyright Springer Science+Business Media, LLC 2011

Suggested Citation

  • Satyaveer Chauhan & J.-M. Frayret & Luc LeBel, 2011. "Supply network planning in the forest supply chain with bucking decisions anticipation," Annals of Operations Research, Springer, vol. 190(1), pages 93-115, October.
  • Handle: RePEc:spr:annopr:v:190:y:2011:i:1:p:93-115:10.1007/s10479-009-0621-5
    DOI: 10.1007/s10479-009-0621-5
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1007/s10479-009-0621-5
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1007/s10479-009-0621-5?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Bruce Faaland & David Briggs, 1984. "Log Bucking and Lumber Manufacturing Using Dynamic Programming," Management Science, INFORMS, vol. 30(2), pages 245-257, February.
    2. Epstein, R. & Nieto, E. & Weintraub, A. & Chevalier, P. & Gabarro, J., 1999. "A system for the design of short term harvesting strategy," European Journal of Operational Research, Elsevier, vol. 119(2), pages 427-439, December.
    3. Carlsson, Dick & Ronnqvist, Mikael, 2005. "Supply chain management in forestry--case studies at Sodra Cell AB," European Journal of Operational Research, Elsevier, vol. 163(3), pages 589-616, June.
    4. G. Eng & H. G. Daellenbach, 1985. "Technical Note—Forest Outturn Optimization by Dantzig-Wolfe Decomposition and Dynamic Programming Column Generation," Operations Research, INFORMS, vol. 33(2), pages 459-464, April.
    5. Chauhan, Satyaveer S. & Frayret, Jean-Marc & LeBel, Luc, 2009. "Multi-commodity supply network planning in the forest supply chain," European Journal of Operational Research, Elsevier, vol. 196(2), pages 688-696, July.
    6. Martell, David L. & Gunn, Eldon A. & Weintraub, Andres, 1998. "Forest management challenges for operational researchers," European Journal of Operational Research, Elsevier, vol. 104(1), pages 1-17, January.
    7. Gunnarsson, Helene & Ronnqvist, Mikael & Lundgren, Jan T., 2004. "Supply chain modelling of forest fuel," European Journal of Operational Research, Elsevier, vol. 158(1), pages 103-123, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sfeir, Tamires de Almeida & Pécora, José Eduardo & Ruiz, Angel & LeBel, Luc, 2021. "Integrating natural wood drying and seasonal trucks’ workload restrictions into forestry transportation planning," Omega, Elsevier, vol. 98(C).
    2. Sanei Bajgiran, Omid & Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2016. "The value of integrated tactical planning optimization in the lumber supply chain," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 22-33.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Amira Dems & Louis-Martin Rousseau & Jean-Marc Frayret, 2015. "Effects of different cut-to-length harvesting structures on the economic value of a wood procurement planning problem," Annals of Operations Research, Springer, vol. 232(1), pages 65-86, September.
    2. Kong, Jiehong & Rönnqvist, Mikael & Frisk, Mikael, 2011. "Modeling an integrated market for sawlogs, pulpwood and forest bioenergy," Discussion Papers 2011/11, Norwegian School of Economics, Department of Business and Management Science.
    3. Carravilla, M. A. & Oliveira, J. F., 2013. "Operations Research in Agriculture: Better Decisions for a Scarce and Uncertain World," AGRIS on-line Papers in Economics and Informatics, Czech University of Life Sciences Prague, Faculty of Economics and Management, vol. 5(2), pages 1-10, June.
    4. Ouhimmou, M. & D'Amours, S. & Beauregard, R. & Ait-Kadi, D. & Chauhan, S. Singh, 2008. "Furniture supply chain tactical planning optimization using a time decomposition approach," European Journal of Operational Research, Elsevier, vol. 189(3), pages 952-970, September.
    5. Jiehong Kong & Mikael Rönnqvist & Mikael Frisk, 2015. "Using mixed integer programming models to synchronously determine production levels and market prices in an integrated market for roundwood and forest biomass," Annals of Operations Research, Springer, vol. 232(1), pages 179-199, September.
    6. Mikael Rönnqvist & Sophie D’Amours & Andres Weintraub & Alejandro Jofre & Eldon Gunn & Robert Haight & David Martell & Alan Murray & Carlos Romero, 2015. "Operations Research challenges in forestry: 33 open problems," Annals of Operations Research, Springer, vol. 232(1), pages 11-40, September.
    7. Melo, M.T. & Nickel, S. & Saldanha-da-Gama, F., 2009. "Facility location and supply chain management - A review," European Journal of Operational Research, Elsevier, vol. 196(2), pages 401-412, July.
    8. Dems, A. & Rousseau, L.M. & Frayret, J.M., 2017. "Annual timber procurement planning with bucking decisions," European Journal of Operational Research, Elsevier, vol. 259(2), pages 713-720.
    9. repec:thr:techub:10010:y:2020:i:1:p:436-447 is not listed on IDEAS
    10. Kai L. Ross & Sándor F. Tóth & Weikko S. Jaross, 2018. "Forest Harvest Scheduling with Endogenous Road Costs," Interfaces, INFORMS, vol. 48(3), pages 260-270, June.
    11. Ba, Birome Holo & Prins, Christian & Prodhon, Caroline, 2016. "Models for optimization and performance evaluation of biomass supply chains: An Operations Research perspective," Renewable Energy, Elsevier, vol. 87(P2), pages 977-989.
    12. Nader Naderializadeh & Kevin A. Crowe, 2020. "Formulating the integrated forest harvest-scheduling model to reduce the cost of the road-networks," Operational Research, Springer, vol. 20(4), pages 2283-2306, December.
    13. Hoogstra-Klein, Marjanke A. & Meijboom, Kars, 2021. "A qualitative exploration of the wood product supply chain – investigating the possibilities and desirability of an increased demand orientation," Forest Policy and Economics, Elsevier, vol. 133(C).
    14. Cambero, Claudia & Sowlati, Taraneh, 2014. "Assessment and optimization of forest biomass supply chains from economic, social and environmental perspectives – A review of literature," Renewable and Sustainable Energy Reviews, Elsevier, vol. 36(C), pages 62-73.
    15. Mustapha Ouhimmou & Sophie D'Amours & Robert Beauregard & Daoud Ait-Kadi & Satyaveer Singh Chauhan, 2009. "Optimization Helps Shermag Gain Competitive Edge," Interfaces, INFORMS, vol. 39(4), pages 329-345, August.
    16. Razm, Sobhan & Brahimi, Nadjib & Hammami, Ramzi & Dolgui, Alexandre, 2023. "A production planning model for biorefineries with biomass perishability and biofuel transformation," International Journal of Production Economics, Elsevier, vol. 258(C).
    17. Alam, Md Bedarul & Shahi, Chander & Pulkki, Reino, 2014. "Economic impact of enhanced forest inventory information and merchandizing yards in the forest product industry supply chain," Socio-Economic Planning Sciences, Elsevier, vol. 48(3), pages 189-197.
    18. Sosa, Amanda & Acuna, Mauricio & McDonnell, Kevin & Devlin, Ger, 2015. "Managing the moisture content of wood biomass for the optimisation of Ireland's transport supply strategy to bioenergy markets and competing industries," Energy, Elsevier, vol. 86(C), pages 354-368.
    19. Mosayeb Dashtpeyma & Reza Ghodsi, 2021. "Forest Biomass and Bioenergy Supply Chain Resilience: A Systematic Literature Review on the Barriers and Enablers," Sustainability, MDPI, vol. 13(12), pages 1-21, June.
    20. Sosa, Amanda & Acuna, Mauricio & McDonnell, Kevin & Devlin, Ger, 2015. "Controlling moisture content and truck configurations to model and optimise biomass supply chain logistics in Ireland," Applied Energy, Elsevier, vol. 137(C), pages 338-351.
    21. Dimopoulou, Maria & Giannikos, Ioannis, 2004. "Towards an integrated framework for forest fire control," European Journal of Operational Research, Elsevier, vol. 152(2), pages 476-486, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:190:y:2011:i:1:p:93-115:10.1007/s10479-009-0621-5. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.