IDEAS home Printed from https://ideas.repec.org/a/eee/transb/v130y2019icp36-66.html
   My bibliography  Save this article

Design of build-operate-transfer contract for integrated rail and property development with uncertainty in future urban population

Author

Listed:
  • Sang, Jinyan
  • Li, Zhi-Chun
  • Lam, William H.K.
  • Wong, S.C.

Abstract

This paper proposes a novel model of the design of a build-operate-transfer (BOT) contract for integrated rail and property (R + P) development when the size of future urban population is uncertain. A real-option approach is adopted to accurately capture the potential economic value of a BOT investment project under uncertainty and its externality effects on urban spatial structure. The proposed model is formulated as a two-stage problem. The first stage of the model optimizes the concession period and rail line parameters (including rail line length, and number and locations of stations) through a Nash bargaining game between a private investor and the government. The second stage determines the headways and fares during the private operation and after transferring the BOT project to the government. The private investor's objective is to maximize its own net profit received during the concession period, whereas the government aims to maximize social welfare over the whole life-cycle of the project. The proposed model is extended to explore the effects of future population jumps due to non-recurrent random events and station deployments with even and uneven station spacings. The results show that compared with the rail-only scheme, the R + P scheme can lead to a win-win situation for the government and private investor. In the BOT contract design, ignoring the effects of population jumps and using an average (or even) station spacing as an estimate of actual station deployment can cause a large bias of the parameter values designed in the contract and an underestimate of project values in terms of expected net profit and expected social welfare.

Suggested Citation

  • Sang, Jinyan & Li, Zhi-Chun & Lam, William H.K. & Wong, S.C., 2019. "Design of build-operate-transfer contract for integrated rail and property development with uncertainty in future urban population," Transportation Research Part B: Methodological, Elsevier, vol. 130(C), pages 36-66.
  • Handle: RePEc:eee:transb:v:130:y:2019:i:c:p:36-66
    DOI: 10.1016/j.trb.2019.10.003
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0191261518306180
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.trb.2019.10.003?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Anas, Alex & Xu, Rong, 1999. "Congestion, Land Use, and Job Dispersion: A General Equilibrium Model," Journal of Urban Economics, Elsevier, vol. 45(3), pages 451-473, May.
    2. Tan, Zhijia & Yang, Hai & Guo, Xiaolei, 2010. "Properties of Pareto-efficient contracts and regulations for road franchising," Transportation Research Part B: Methodological, Elsevier, vol. 44(4), pages 415-433, May.
    3. Song, Yan & Zenou, Yves, 2006. "Property tax and urban sprawl: Theory and implications for US cities," Journal of Urban Economics, Elsevier, vol. 60(3), pages 519-534, November.
    4. Fujita,Masahisa, 1991. "Urban Economic Theory," Cambridge Books, Cambridge University Press, number 9780521396455, January.
    5. Li, Zhi-Chun & Guo, Qian-Wen & Lam, William H.K. & Wong, S.C., 2015. "Transit technology investment and selection under urban population volatility: A real option perspective," Transportation Research Part B: Methodological, Elsevier, vol. 78(C), pages 318-340.
    6. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    7. Yang, Hai & Meng, Qiang, 2000. "Highway pricing and capacity choice in a road network under a build-operate-transfer scheme," Transportation Research Part A: Policy and Practice, Elsevier, vol. 34(3), pages 207-222, April.
    8. Vukan R. Vuchic, 1969. "Rapid Transit Interstation Spacings for Maximum Number of Passengers," Transportation Science, INFORMS, vol. 3(3), pages 214-232, August.
    9. S. C. Wirasinghe & P. N. Seneviratne, 1986. "Rail Line Length in an Urban Transportation Corridor," Transportation Science, INFORMS, vol. 20(4), pages 237-245, November.
    10. Avinash K. Dixit & Robert S. Pindyck, 1994. "Investment under Uncertainty," Economics Books, Princeton University Press, edition 1, number 5474.
    11. Li, Zhi-Chun & Chen, Ya-Juan & Wang, Ya-Dong & Lam, William H.K. & Wong, S.C., 2013. "Optimal density of radial major roads in a two-dimensional monocentric city with endogenous residential distribution and housing prices," Regional Science and Urban Economics, Elsevier, vol. 43(6), pages 927-937.
    12. Robert McDonald & Daniel Siegel, 1986. "The Value of Waiting to Invest," The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 101(4), pages 707-727.
    13. Chen, Zhiqi & Woolley, Frances, 2001. "A Cournot-Nash Model of Family Decision Making," Economic Journal, Royal Economic Society, vol. 111(474), pages 722-748, October.
    14. Li, Zhi-Chun & Wang, Ya-Dong, 2018. "Analysis of multimodal two-dimensional urban system equilibrium for cordon toll pricing and bus service design," Transportation Research Part B: Methodological, Elsevier, vol. 111(C), pages 244-265.
    15. Saphores, Jean-Daniel M. & Boarnet, Marlon G., 2006. "Uncertainty and the timing of an urban congestion relief investment.: The no-land case," Journal of Urban Economics, Elsevier, vol. 59(2), pages 189-208, March.
    16. Yao, Mingzhu & Wang, Donggen & Yang, Hai, 2017. "A game-theoretic model of car ownership and household time allocation," Transportation Research Part B: Methodological, Elsevier, vol. 104(C), pages 667-685.
    17. John M. Quigley, 1984. "The Production of Housing Services and the Derived Demand for Residential Energy," RAND Journal of Economics, The RAND Corporation, vol. 15(4), pages 555-567, Winter.
    18. Xing Hu & René Caldentey & Gustavo Vulcano, 2013. "Revenue Sharing in Airline Alliances," Management Science, INFORMS, vol. 59(5), pages 1177-1195, May.
    19. Eliasson, Jonas & Fosgerau, Mogens, 2013. "Cost overruns and demand shortfalls – Deception or selection?," Transportation Research Part B: Methodological, Elsevier, vol. 57(C), pages 105-113.
    20. Robert M. Solow, 1973. "Congestion Cost and the Use of Land for Streets," Bell Journal of Economics, The RAND Corporation, vol. 4(2), pages 602-618, Autumn.
    21. Bowes, David R. & Ihlanfeldt, Keith R., 2001. "Identifying the Impacts of Rail Transit Stations on Residential Property Values," Journal of Urban Economics, Elsevier, vol. 50(1), pages 1-25, July.
    22. Peng, Ya-Ting & Li, Zhi-Chun & Choi, Keechoo, 2017. "Transit-oriented development in an urban rail transportation corridor," Transportation Research Part B: Methodological, Elsevier, vol. 103(C), pages 269-290.
    23. Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
    24. Chen, Anthony & Subprasom, Kitti, 2007. "Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty," Transportation Research Part A: Policy and Practice, Elsevier, vol. 41(6), pages 537-558, July.
    25. Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
    26. Beckmann, Martin J., 1974. "Spatial equilibrium in the housing market," Journal of Urban Economics, Elsevier, vol. 1(1), pages 99-107, January.
    27. John C. Harsanyi & Reinhard Selten, 1972. "A Generalized Nash Solution for Two-Person Bargaining Games with Incomplete Information," Management Science, INFORMS, vol. 18(5-Part-2), pages 80-106, January.
    28. Lu, Zhaoyang & Meng, Qiang, 2017. "Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 100(C), pages 17-37.
    29. Pines, David & Sadka, Efraim, 1986. "Comparative statics analysis of a fully closed city," Journal of Urban Economics, Elsevier, vol. 20(1), pages 1-20, July.
    30. Vukan R. Vuchic & Gordon F. Newell, 1968. "Rapid Transit Interstation Spacings for Minimum Travel Time," Transportation Science, INFORMS, vol. 2(4), pages 303-339, November.
    31. Beckmann, Martin J., 1969. "On the distribution of urban rent and residential density," Journal of Economic Theory, Elsevier, vol. 1(1), pages 60-67, June.
    32. Li, Zhi-Chun & Lam, William H.K. & Wong, S.C. & Choi, Keechoo, 2012. "Modeling the effects of integrated rail and property development on the design of rail line services in a linear monocentric city," Transportation Research Part B: Methodological, Elsevier, vol. 46(6), pages 710-728.
    33. Xu, Xiangdong & Chen, Anthony & Wong, S.C. & Cheng, Lin, 2015. "Selection bias in build-operate-transfer transportation project appraisals," Transportation Research Part A: Policy and Practice, Elsevier, vol. 75(C), pages 245-251.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    2. Zheng, Shiyuan & Wang, Kun & Chan, Felix T.S. & Fu, Xiaowen & Li, Zhi-Chun, 2022. "Subsidy on transport adaptation investment-modeling decisions under incomplete information and ambiguity," Transportation Research Part B: Methodological, Elsevier, vol. 162(C), pages 103-129.
    3. Tian, Qiong & Liu, Peng & Ong, Ghim Ping & Huang, Hai-Jun, 2021. "Morning commuting pattern and crowding pricing in a many-to-one public transit system with heterogeneous users," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 145(C).
    4. Liu, Peng & Xu, Shu-Xian & Ong, Ghim Ping & Tian, Qiong & Ma, Shoufeng, 2021. "Effect of autonomous vehicles on travel and urban characteristics," Transportation Research Part B: Methodological, Elsevier, vol. 153(C), pages 128-148.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Peng, Ya-Ting & Li, Zhi-Chun & Choi, Keechoo, 2017. "Transit-oriented development in an urban rail transportation corridor," Transportation Research Part B: Methodological, Elsevier, vol. 103(C), pages 269-290.
    2. Zhi-Chun Li & Li Cheng & André de Palma, 2023. "Ring road investment, cordon tolling, and urban spatial structure: Formulation and a case study," THEMA Working Papers 2023-07, THEMA (THéorie Economique, Modélisation et Applications), Université de Cergy-Pontoise.
    3. Li, Zhi-Chun & Guo, Qian-Wen & Lam, William H.K. & Wong, S.C., 2015. "Transit technology investment and selection under urban population volatility: A real option perspective," Transportation Research Part B: Methodological, Elsevier, vol. 78(C), pages 318-340.
    4. Li, Zhi-Chun & Lam, William H.K. & Wong, S.C. & Choi, Keechoo, 2012. "Modeling the effects of integrated rail and property development on the design of rail line services in a linear monocentric city," Transportation Research Part B: Methodological, Elsevier, vol. 46(6), pages 710-728.
    5. Li, Zhi-Chun & Ma, Jia-Chun, 2021. "Investing in inter-city and/or intra-city rail lines? A general equilibrium analysis for a two-city system," Transport Policy, Elsevier, vol. 108(C), pages 59-82.
    6. Li, Zhi-Chun & Wang, Ya-Dong, 2018. "Analysis of multimodal two-dimensional urban system equilibrium for cordon toll pricing and bus service design," Transportation Research Part B: Methodological, Elsevier, vol. 111(C), pages 244-265.
    7. Huang, Hai-Jun & Xia, Tian & Tian, Qiong & Liu, Tian-Liang & Wang, Chenlan & Li, Daqing, 2020. "Transportation issues in developing China's urban agglomerations," Transport Policy, Elsevier, vol. 85(C), pages 1-22.
    8. Li, Zhi-Chun & Chen, Ya-Juan & Wang, Ya-Dong & Lam, William H.K. & Wong, S.C., 2013. "Optimal density of radial major roads in a two-dimensional monocentric city with endogenous residential distribution and housing prices," Regional Science and Urban Economics, Elsevier, vol. 43(6), pages 927-937.
    9. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    10. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
    11. Hoang-Tung, Nguyen & Viet Hung, Do & Kato, Hironori & Binh, Phan Le, 2021. "Modeling ceiling price for build-operate-transfer road projects in developing countries," Economics of Transportation, Elsevier, vol. 28(C).
    12. Wang, Fan & Xiong, Minghua & Niu, Baozhuang & Zhuo, Xiaopo, 2018. "Impact of government subsidy on BOT contract design: Price, demand, and concession period," Transportation Research Part B: Methodological, Elsevier, vol. 110(C), pages 137-159.
    13. Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
    14. Chen, Zhiyuan & Ye, Hanrui & Liu, Bingxi & Xue, Weili, 2021. "Analysis of road capacity and franchise price decision delegation in toll road BOT project," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 146(C).
    15. Lu, Zhaoyang & Meng, Qiang, 2023. "Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts," Transportation Research Part B: Methodological, Elsevier, vol. 172(C), pages 71-92.
    16. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    17. Shi, Shasha & An, Qingxian & Chen, Ke, 2020. "Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 228-254.
    18. Li, Shuai & Cai, Jiannan & Feng, Zhuo & Xu, Yifang & Cai, Hubo, 2019. "Government contracting with monopoly in infrastructure provision: Regulation or deregulation?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 506-523.
    19. Zhi-Chun Li & Qian-Wen Guo, 2017. "Optimal time for implementing cordon toll pricing scheme in a monocentric city," Papers in Regional Science, Wiley Blackwell, vol. 96(1), pages 163-190, March.
    20. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying & Zhang, Shuai-Jun, 2016. "Subsidizing and pricing private toll roads with noncontractible service quality: A relational contract approach," Transportation Research Part B: Methodological, Elsevier, vol. 91(C), pages 466-491.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transb:v:130:y:2019:i:c:p:36-66. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/548/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.