IDEAS home Printed from https://ideas.repec.org/a/eee/enepol/v102y2017icp602-615.html
   My bibliography  Save this article

Enhanced operational reserve as a tool for development of optimal energy mix

Author

Listed:
  • Wierzbowski, Michal
  • Filipiak, Izabela

Abstract

The aim of this article is to present a novel capacity remuneration mechanism concept that differentiates the level of financial support according to the technology and parameters of the new power plants. New power plants that are to be constructed should guarantee the highest level of security of electricity supply and be consistent with actual energy policy carried out by a country. Thus, the proposed remuneration system is based on an ‘operational reserve’ system which is currently implemented in Poland. The proposed system distinguishes new power generating assets according to a total assessment based on three factors: type of technology (including emission benchmark), flexibility, and location (addressing issue of brown or green field investment and conditions of power system operation). Existing power plants are also subsidized by the proposed mechanism, however their remuneration is not based on their characteristics. The details of the proposed mechanism, a cost analysis, and a standardized evaluation procedure are described in the paper. The concept itself is universal and can be intruded in every power system that must overcome capacity problem.

Suggested Citation

  • Wierzbowski, Michal & Filipiak, Izabela, 2017. "Enhanced operational reserve as a tool for development of optimal energy mix," Energy Policy, Elsevier, vol. 102(C), pages 602-615.
  • Handle: RePEc:eee:enepol:v:102:y:2017:i:c:p:602-615
    DOI: 10.1016/j.enpol.2016.12.048
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0301421516307121
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.enpol.2016.12.048?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Meyer, Roland & Gore, Olga, 2015. "Cross-border effects of capacity mechanisms: Do uncoordinated market design changes contradict the goals of the European market integration?," Energy Economics, Elsevier, vol. 51(C), pages 9-20.
    2. Levin, Todd & Botterud, Audun, 2015. "Electricity market design for generator revenue sufficiency with increased variable generation," Energy Policy, Elsevier, vol. 87(C), pages 392-406.
    3. Olsina, Fernando & Pringles, Rolando & Larisson, Carlos & Garcés, Francisco, 2014. "Reliability payments to generation capacity in electricity markets," Energy Policy, Elsevier, vol. 73(C), pages 211-224.
    4. Hughes, William R. & Parece, Andrew, 2002. "The Economics of Price Spikes in Deregulated Power Markets," The Electricity Journal, Elsevier, vol. 15(6), pages 31-44, July.
    5. Moreno, R. & Barroso, L.A. & Rudnick, H. & Mocarquer, S. & Bezerra, B., 2010. "Auction approaches of long-term contracts to ensure generation investment in electricity markets: Lessons from the Brazilian and Chilean experiences," Energy Policy, Elsevier, vol. 38(10), pages 5758-5769, October.
    6. Ilkyeong Moon & Byung-Hyun Ha & Jongchul Kim, 2012. "Inventory systems with variable capacity," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 6(1), pages 68-86.
    7. Clements, A.E. & Herrera, R. & Hurn, A.S., 2015. "Modelling interregional links in electricity price spikes," Energy Economics, Elsevier, vol. 51(C), pages 383-393.
    8. Cramton, Peter & Stoft, Steven, 2005. "A Capacity Market that Makes Sense," The Electricity Journal, Elsevier, vol. 18(7), pages 43-54.
    9. Newbery, David, 2016. "Missing money and missing markets: Reliability, capacity auctions and interconnectors," Energy Policy, Elsevier, vol. 94(C), pages 401-410.
    10. Rodilla, P. & Batlle, C., 2012. "Security of electricity supply at the generation level: Problem analysis," Energy Policy, Elsevier, vol. 40(C), pages 177-185.
    11. Solomon, A.A. & Faiman, D. & Meron, G., 2012. "The role of conventional power plants in a grid fed mainly by PV and storage, and the largest shadow capacity requirement," Energy Policy, Elsevier, vol. 48(C), pages 479-486.
    12. Cepeda, Mauricio & Finon, Dominique, 2013. "How to correct for long-term externalities of large-scale wind power development by a capacity mechanism?," Energy Policy, Elsevier, vol. 61(C), pages 671-685.
    13. D. Finon, 2013. "How to Correct Long-term Externalities of Large-scale Wind Power Development by a Capaciy Mechanism ?," Post-Print hal-00834997, HAL.
    14. Tashpulatov, Sherzod N., 2013. "Estimating the volatility of electricity prices: The case of the England and Wales wholesale electricity market," Energy Policy, Elsevier, vol. 60(C), pages 81-90.
    15. Mauritzen, Johannes, 2015. "How price spikes can help overcome the energy efficiency gap," Economics Letters, Elsevier, vol. 134(C), pages 114-117.
    16. De Vries, Laurens J., 2007. "Generation adequacy: Helping the market do its job," Utilities Policy, Elsevier, vol. 15(1), pages 20-35, March.
    17. Bhagwat, Pradyumna C. & de Vries, Laurens J. & Hobbs, Benjamin F., 2016. "Expert survey on capacity markets in the US: Lessons for the EU," Utilities Policy, Elsevier, vol. 38(C), pages 11-17.
    18. Ausubel, Lawrence M. & Cramton, Peter, 2010. "Using forward markets to improve electricity market design," Utilities Policy, Elsevier, vol. 18(4), pages 195-200, December.
    19. repec:dau:papers:123456789/13149 is not listed on IDEAS
    20. Bidwell, Miles & Henney, Alex, 2004. "Will the New Electricity Trading Arrangements Ensure Generation Adequacy?," The Electricity Journal, Elsevier, vol. 17(7), pages 15-38.
    21. Batlle, Carlos & Pérez-Arriaga, Ignacio J., 2008. "Design criteria for implementing a capacity mechanism in deregulated electricity markets," Utilities Policy, Elsevier, vol. 16(3), pages 184-193, September.
    22. Batlle, C. & Rodilla, P., 2010. "A critical assessment of the different approaches aimed to secure electricity generation supply," Energy Policy, Elsevier, vol. 38(11), pages 7169-7179, November.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2019. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Energy Economics, Elsevier, vol. 80(C), pages 1059-1078.
    2. Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2018. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Working Paper Series in Production and Energy 27, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
    3. Khan, Agha Salman M. & Verzijlbergh, Remco A. & Sakinci, Ozgur Can & De Vries, Laurens J., 2018. "How do demand response and electrical energy storage affect (the need for) a capacity market?," Applied Energy, Elsevier, vol. 214(C), pages 39-62.
    4. Bhagwat, Pradyumna C. & Iychettira, Kaveri K. & Richstein, Jörn C. & Chappin, Emile J.L. & De Vries, Laurens J., 2017. "The effectiveness of capacity markets in the presence of a high portfolio share of renewable energy sources," Utilities Policy, Elsevier, vol. 48(C), pages 76-91.
    5. Bhagwat, Pradyumna C. & Marcheselli, Anna & Richstein, Jörn C. & Chappin, Emile J.L. & De Vries, Laurens J., 2017. "An analysis of a forward capacity market with long-term contracts," Energy Policy, Elsevier, vol. 111(C), pages 255-267.
    6. Bhagwat, Pradyumna C. & Iychettira, Kaveri K. & Richstein, Jörn C. & Chappin, Emile J.L. & Vries, Laurens J. De, 2017. "The effectiveness of capacity markets in the presence of a high portfolio share of renewable energy sources," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 48, pages 76-91.
    7. Keppler, Jan Horst & Quemin, Simon & Saguan, Marcelo, 2022. "Why the sustainable provision of low-carbon electricity needs hybrid markets," Energy Policy, Elsevier, vol. 171(C).
    8. Meyer, Roland & Gore, Olga, 2015. "Cross-border effects of capacity mechanisms: Do uncoordinated market design changes contradict the goals of the European market integration?," Energy Economics, Elsevier, vol. 51(C), pages 9-20.
    9. Heidarizadeh, Mohammad & Ahmadian, Mohammad, 2019. "Capacity certificate mechanism: A step forward toward a market based generation capacity incentive," Energy, Elsevier, vol. 172(C), pages 45-56.
    10. Bhagwat, Pradyumna C. & Richstein, Jörn C. & Chappin, Emile J.L. & Iychettira, Kaveri K. & De Vries, Laurens J., 2017. "Cross-border effects of capacity mechanisms in interconnected power systems," Utilities Policy, Elsevier, vol. 46(C), pages 33-47.
    11. Zapata, Sebastian & Castaneda, Monica & Franco, Carlos Jaime & Dyner, Isaac, 2019. "Clean and secure power supply: A system dynamics based appraisal," Energy Policy, Elsevier, vol. 131(C), pages 9-21.
    12. Perica Ilak & Lin Herenčić & Ivan Rajšl & Sara Raos & Željko Tomšić, 2021. "Equilibrium Pricing with Duality-Based Method: Approach for Market-Oriented Capacity Remuneration Mechanism," Energies, MDPI, vol. 14(3), pages 1-19, January.
    13. Simshauser, Paul & Gilmore, Joel, 2022. "Climate change policy discontinuity & Australia's 2016-2021 renewable investment supercycle," Energy Policy, Elsevier, vol. 160(C).
    14. Simshauser, Paul, 2022. "Rooftop solar PV and the peak load problem in the NEM's Queensland region," Energy Economics, Elsevier, vol. 109(C).
    15. Simshauser, P. & Gilmore, J., 2020. "Is the NEM broken? Policy discontinuity and the 2017-2020 investment megacycle," Cambridge Working Papers in Economics 2048, Faculty of Economics, University of Cambridge.
    16. Hach, Daniel & Chyong, Chi Kong & Spinler, Stefan, 2016. "Capacity market design options: A dynamic capacity investment model and a GB case study," European Journal of Operational Research, Elsevier, vol. 249(2), pages 691-705.
    17. Daniel Hach & Stefan Spinler, 2018. "Robustness of capacity markets: a stochastic dynamic capacity investment model," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(2), pages 517-540, March.
    18. Keles, Dogan & Bublitz, Andreas & Zimmermann, Florian & Genoese, Massimo & Fichtner, Wolf, 2016. "Analysis of design options for the electricity market: The German case," Applied Energy, Elsevier, vol. 183(C), pages 884-901.
    19. Simshauser, Paul, 2020. "Merchant renewables and the valuation of peaking plant in energy-only markets," Energy Economics, Elsevier, vol. 91(C).
    20. Bhagwat, Pradyumna C. & Marcheselli, Anna & Richstein, Jörn C. & Chappin, Emile J. L. & Vries, Laurens J. De, 2017. "An analysis of a forward capacity market with long-term contracts," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 111, pages 255-267.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:enepol:v:102:y:2017:i:c:p:602-615. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/enpol .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.