IDEAS home Printed from https://ideas.repec.org/a/eee/juipol/v16y2008i3p184-193.html
   My bibliography  Save this article

Design criteria for implementing a capacity mechanism in deregulated electricity markets

Author

Listed:
  • Batlle, Carlos
  • Pérez-Arriaga, Ignacio J.

Abstract

Over twenty years since electricity industry deregulation was first implemented, and nearly ten since many power systems boarded the liberalization train, reliability of supply appears to be the major concern of energy regulators. Drawing from the cumulative experience of systems that have already implemented some manner of security of supply mechanism, the present article reviews the main criteria to be taken into consideration in the design of a regulatory mechanism of this nature.

Suggested Citation

  • Batlle, Carlos & Pérez-Arriaga, Ignacio J., 2008. "Design criteria for implementing a capacity mechanism in deregulated electricity markets," Utilities Policy, Elsevier, vol. 16(3), pages 184-193, September.
  • Handle: RePEc:eee:juipol:v:16:y:2008:i:3:p:184-193
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0957-1787(07)00093-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Cramton, Peter & Stoft, Steven, 2005. "A Capacity Market that Makes Sense," The Electricity Journal, Elsevier, vol. 18(7), pages 43-54.
    2. Batlle, Carlos & Vazquez, Carlos & Rivier, Michel & Perez-Arriaga, Ignacio J., 2007. "Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options," Energy Policy, Elsevier, vol. 35(9), pages 4545-4554, September.
    3. Peter Cramton & Steven Stoft, 2007. "Colombia Firm Energy Market," Papers of Peter Cramton 07cfem, University of Maryland, Department of Economics - Peter Cramton, revised 2007.
    4. De Vries, Laurens J., 2007. "Generation adequacy: Helping the market do its job," Utilities Policy, Elsevier, vol. 15(1), pages 20-35, March.
    5. Bidwell, Miles, 2005. "Reliability Options: A Market-Oriented Approach to Long-Term Adequacy," The Electricity Journal, Elsevier, vol. 18(5), pages 11-25, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2019. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Energy Economics, Elsevier, vol. 80(C), pages 1059-1078.
    2. Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2018. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Working Paper Series in Production and Energy 27, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
    3. Meyer, Roland & Gore, Olga, 2015. "Cross-border effects of capacity mechanisms: Do uncoordinated market design changes contradict the goals of the European market integration?," Energy Economics, Elsevier, vol. 51(C), pages 9-20.
    4. Newbery, David, 2016. "Missing money and missing markets: Reliability, capacity auctions and interconnectors," Energy Policy, Elsevier, vol. 94(C), pages 401-410.
    5. Peter Cramton & Axel Ockenfels & Steven Stoft, 2013. "Capacity Market Fundamentals," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
    6. Batlle, C. & Rodilla, P., 2010. "A critical assessment of the different approaches aimed to secure electricity generation supply," Energy Policy, Elsevier, vol. 38(11), pages 7169-7179, November.
    7. Elberg, Christina, 2014. "Cross-Border Effects of Capacity Mechanisms in Electricity Markets," EWI Working Papers 2014-11, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
    8. Keles, Dogan & Bublitz, Andreas & Zimmermann, Florian & Genoese, Massimo & Fichtner, Wolf, 2016. "Analysis of design options for the electricity market: The German case," Applied Energy, Elsevier, vol. 183(C), pages 884-901.
    9. Roques, Fabien A., 2008. "Market design for generation adequacy: Healing causes rather than symptoms," Utilities Policy, Elsevier, vol. 16(3), pages 171-183, September.
    10. Bhagwat, Pradyumna C. & Richstein, Jörn C. & Chappin, Emile J.L. & Iychettira, Kaveri K. & Vries, Laurens J. De, 2017. "Cross-border effects of capacity mechanisms in interconnected power systems," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 46, pages 33-47.
    11. Fontini, Fulvio & Vargiolu, Tiziano & Zormpas, Dimitrios, 2021. "Investing in electricity production under a reliability options scheme," Journal of Economic Dynamics and Control, Elsevier, vol. 126(C).
    12. Finon, Dominique & Meunier, Guy & Pignon, Virginie, 2008. "The social efficiency of long-term capacity reserve mechanisms," Utilities Policy, Elsevier, vol. 16(3), pages 202-214, September.
    13. Andreis, Luisa & Flora, Maria & Fontini, Fulvio & Vargiolu, Tiziano, 2020. "Pricing reliability options under different electricity price regimes," Energy Economics, Elsevier, vol. 87(C).
    14. Hasani, Masoud & Hosseini, Seyed Hamid, 2011. "Dynamic assessment of capacity investment in electricity market considering complementary capacity mechanisms," Energy, Elsevier, vol. 36(1), pages 277-293.
    15. Lynch, Muireann Á. & Devine, Mel, 2015. "Investment vs. Refurbishment: Examining Capacity Payment Mechanisms Using Mixed Complementarity Problems With Endogenous Probability," Papers WP507, Economic and Social Research Institute (ESRI).
    16. Álvaro López-Peña & Efraim Centeno & Julián Barquín, 2009. "Long term issues to be addressed by regulators in liberalised electricity systems: generation adequacy and indicative planning. Justification, available mechanisms, and a simulation study on some conc," RSCAS Working Papers 2009/67, European University Institute.
    17. David Newbery and Michael Grubb, 2015. "Security of Supply, the Role of Interconnectors and Option Values : insights from the GB Capacity Auction," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
    18. Muireann A. Lynch and Mel T. Devine, 2017. "Investment vs. Refurbishment: Examining Capacity Payment Mechanisms Using Stochastic Mixed Complementarity Problems," The Energy Journal, International Association for Energy Economics, vol. 0(Number 2).
    19. Bhagwat, Pradyumna C. & Iychettira, Kaveri K. & Richstein, Jörn C. & Chappin, Emile J.L. & Vries, Laurens J. De, 2017. "The effectiveness of capacity markets in the presence of a high portfolio share of renewable energy sources," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 48, pages 76-91.
    20. Finon, Dominique & Pignon, Virginie, 2008. "Electricity and long-term capacity adequacy: The quest for regulatory mechanism compatible with electricity market," Utilities Policy, Elsevier, vol. 16(3), pages 143-158, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:juipol:v:16:y:2008:i:3:p:184-193. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.sciencedirect.com/journal/utilities-policy .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.