IDEAS home Printed from https://ideas.repec.org/r/spr/isorms/978-1-4899-7609-3.html

Spare Parts Inventory Control under System Availability Constraints

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Kouki, Chaaben & Arts, Joachim & Babai, M. Zied, 2024. "Performance evaluation of a two-echelon inventory system with network lost sales," European Journal of Operational Research, Elsevier, vol. 314(2), pages 647-664.
  2. Taher Ahmadi & Alireza F. Hesaraki & Anwar Mahmoodi & Ahmadreza Marandi, 2025. "Managing customer waiting times in an inventory system using Conditional Value-at-Risk measure," Annals of Operations Research, Springer, vol. 344(1), pages 1-45, January.
  3. van Wingerden, E. & Tan, T. & Van Houtum, G.J., 2019. "The impact of an emergency warehouse in a two-echelon spare parts network," European Journal of Operational Research, Elsevier, vol. 276(3), pages 983-997.
  4. Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
  5. Zhang, Xiaohong & Zeng, Jianchao, 2017. "Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems," European Journal of Operational Research, Elsevier, vol. 262(2), pages 479-498.
  6. Sleptchenko, Andrei & Turan, Hasan Hüseyin & Pokharel, Shaligram & ElMekkawy, Tarek Y., 2019. "Cross-training policies for repair shops with spare part inventories," International Journal of Production Economics, Elsevier, vol. 209(C), pages 334-345.
  7. Joni Driessen & Joachim Arts & Geert-Jan van Houtum, 2024. "On the Importance of Service Parts When Taking Commonality and Reliability Decisions," Service Science, INFORMS, vol. 16(3), pages 223-240, September.
  8. Loe Schlicher & Marco Slikker & Geert‐Jan van Houtum, 2017. "Probabilistic resource pooling games," Naval Research Logistics (NRL), John Wiley & Sons, vol. 64(7), pages 531-546, October.
  9. Taher Ahmadi & Zümbül Atan & Ton de Kok & Ivo Adan, 2019. "Optimal control policies for an inventory system with commitment lead time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(3), pages 193-212, April.
  10. Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
  11. Topan, E. & van der Heijden, M.C., 2020. "Operational level planning of a multi-item two-echelon spare parts inventory system with reactive and proactive interventions," European Journal of Operational Research, Elsevier, vol. 284(1), pages 164-175.
  12. Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
  13. Stip, J. & Van Houtum, G.J., 2020. "On a method to improve your service BOMs within spare parts management," International Journal of Production Economics, Elsevier, vol. 221(C).
  14. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
  15. Christiane B. Haubitz & Ulrich W. Thonemann, 2021. "How to Change a Running System—Controlling the Transition to Optimized Spare Parts Inventory Policies," Production and Operations Management, Production and Operations Management Society, vol. 30(5), pages 1386-1405, May.
  16. Turan, Hasan Hüseyin & Atmis, Mahir & Kosanoglu, Fuat & Elsawah, Sondoss & Ryan, Michael J., 2020. "A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
  17. Kouki, Chaaben & Drent, Melvin & Babai, M. Zied & Drent, Collin, 2025. "Dedicated maintenance and repair shop control for spare parts networks," Other publications TiSEM 8609700c-5ae3-4e17-b2f8-f, Tilburg University, School of Economics and Management.
  18. Knofius, N. & van der Heijden, M.C. & Zijm, W.H.M., 2019. "Consolidating spare parts for asset maintenance with additive manufacturing," International Journal of Production Economics, Elsevier, vol. 208(C), pages 269-280.
  19. N. Knofius & M. C. Heijden & A. Sleptchenko & W. H. M. Zijm, 2021. "Improving effectiveness of spare parts supply by additive manufacturing as dual sourcing option," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(1), pages 189-221, March.
  20. Yahel Giat, 2024. "Stock Levels and Repair Sourcing in a Periodic Review Exchangeable Item Repair System," Logistics, MDPI, vol. 8(2), pages 1-19, March.
  21. Zheng, Meimei & Ye, Hongqing & Wang, Dong & Pan, Ershun, 2021. "Joint Optimization of Condition-Based Maintenance and Spare Parts Orders for Multi-Unit Systems with Dual Sourcing," Reliability Engineering and System Safety, Elsevier, vol. 210(C).
  22. Westerweel, Bram & Basten, Rob J.I. & van Houtum, Geert-Jan, 2018. "Traditional or Additive Manufacturing? Assessing Component Design Options through Lifecycle Cost Analysis," European Journal of Operational Research, Elsevier, vol. 270(2), pages 570-585.
  23. Eggertsson, Ragnar & Eruguz, Ayse Sena & Basten, Rob & Maillart, Lisa M., 2025. "Maintenance optimization for multi-component systems with a single sensor," European Journal of Operational Research, Elsevier, vol. 320(3), pages 559-569.
  24. Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
  25. Erhun Özkan & Geert-Jan van Houtum, 2023. "Joint Inventory and Scheduling Control in a Repair Facility," Operations Research, INFORMS, vol. 71(5), pages 1498-1514, September.
  26. Ayse Sena Eruguz & Tarkan Tan & Geert-Jan van Houtum, 2018. "Integrated maintenance and spare part optimization for moving assets," IISE Transactions, Taylor & Francis Journals, vol. 50(3), pages 230-245, March.
  27. S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.