IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v29y1983i3p273-288.html
   My bibliography  Save this item

Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Benjaafar, Saifallah, 1996. "Modeling and analysis of machine sharing in manufacturing systems," European Journal of Operational Research, Elsevier, vol. 91(1), pages 56-73, May.
  2. K. C. Bhosale & P. J. Pawar, 2019. "Material flow optimisation of production planning and scheduling problem in flexible manufacturing system by real coded genetic algorithm (RCGA)," Flexible Services and Manufacturing Journal, Springer, vol. 31(2), pages 381-423, June.
  3. Crama Yves & Klundert Joris van de, 1996. "The approximability of tool management problems," Research Memorandum 019, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
  4. Akturk, M. Selim & Avci, Selcuk, 1996. "Tool allocation and machining conditions optimization for CNC machines," European Journal of Operational Research, Elsevier, vol. 94(2), pages 335-348, October.
  5. Graves, Stephen C. & Jordan, William C., 1991. "Principles on the benefits of manufacturing process flexibility," Working papers 3296-91., Massachusetts Institute of Technology (MIT), Sloan School of Management.
  6. Julie Ann Stuart & Jane C. Ammons & Laura J. Turbini, 1999. "A Product and Process Selection Model with Multidisciplinary Environmental Considerations," Operations Research, INFORMS, vol. 47(2), pages 221-234, April.
  7. Raduly-Baka, Csaba & Nevalainen, Olli S., 2015. "The modular tool switching problem," European Journal of Operational Research, Elsevier, vol. 242(1), pages 100-106.
  8. Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
  9. Crama, Yves & Moonen, Linda S. & Spieksma, Frits C.R. & Talloen, Ellen, 2007. "The tool switching problem revisited," European Journal of Operational Research, Elsevier, vol. 182(2), pages 952-957, October.
  10. Meltem Denizel & S. Selcuk Erenguc & Hanif D. Sherali, 1996. "Convex envelope results and strong formulations for a class of mixed‐integer programs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(4), pages 503-518, June.
  11. Mohamed, Zubair M., 1995. "Ramifications of tool magazine size on the makespan and routing flexibility of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 87(2), pages 289-298, December.
  12. Koltai, Tamas & Lozano, Sebastian, 1998. "Sensitivity calculation of the throughput of an FMS with respect to the routing mix using perturbation analysis," European Journal of Operational Research, Elsevier, vol. 105(3), pages 483-493, March.
  13. Mohamed, Zubair M. & Bernardo, John J., 1997. "Tool planning models for flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 103(3), pages 497-514, December.
  14. Crama, Y. & van de Klundert, J., 1996. "The approximability of tool management problems," Research Memorandum 034, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
  15. Bennett, Derek P. & Yano, Candace A., 2004. "A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors," European Journal of Operational Research, Elsevier, vol. 156(3), pages 643-664, August.
  16. Sodhi, Manbir S. & Lamond, Bernard F. & Gautier, Antoine & Noel, Martin, 2001. "Heuristics for determining economic processing rates in a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(1), pages 105-115, February.
  17. Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
  18. Beezão, Andreza Cristina & Cordeau, Jean-François & Laporte, Gilbert & Yanasse, Horacio Hideki, 2017. "Scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 257(3), pages 834-844.
  19. Srivastava, Bharatendu & Chen, Wun-Hwa, 1996. "Batching in production planning for flexible manufacturing systems," International Journal of Production Economics, Elsevier, vol. 43(2-3), pages 127-137, June.
  20. Mohamed, Zubair M., 1996. "A flexible approach to (re)configure Flexible Manufacturing Cells," European Journal of Operational Research, Elsevier, vol. 95(3), pages 566-576, December.
  21. Atan, Tankut S. & Pandit, Ram, 1996. "Auxiliary tool allocation in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 642-659, March.
  22. Furrer, Martina & Mütze, Torsten, 2017. "An algorithmic framework for tool switching problems with multiple objectives," European Journal of Operational Research, Elsevier, vol. 259(3), pages 1003-1016.
  23. Chakravarty, Amiya K. & Balakrishnan, Nagraj, 1995. "Impact of job-sequence on the down-time of a deteriorating flexible machine," European Journal of Operational Research, Elsevier, vol. 87(2), pages 299-315, December.
  24. Boyer, Kenneth K. & Leong, G. Keong, 1996. "Manufacturing flexibility at the plant level," Omega, Elsevier, vol. 24(5), pages 495-510, October.
  25. Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
  26. Christopher S. Tang, 2017. "OM Forum—Three Simple Approaches for Young Scholars to Identify Relevant and Novel Research Topics in Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 19(3), pages 338-346, July.
  27. Handfield, Robert B. & Pagell, Mark D., 1995. "An analysis of the diffusion of flexible manufacturing systems," International Journal of Production Economics, Elsevier, vol. 39(3), pages 243-253, May.
  28. Renato de Matta & Vernon Ning Hsu & Timothy J. Lowe, 1999. "Capacitated selection problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 19-37, February.
  29. Giovanni Lugaresi & Ettore Lanzarone & Nicola Frigerio & Andrea Matta, 2017. "A Cardinality-constrained Approach for Robust Machine Loading Problems," Post-Print hal-03880625, HAL.
  30. Gaalman, G. J. C. & Nawijn, W. M., 1996. "Tool sharing in parallel part production," International Journal of Production Economics, Elsevier, vol. 46(1), pages 521-533, December.
  31. Mohamed, Zubair M. & Kumar, Ashok & Motwani, Jaideep, 1999. "An improved part grouping model for minimizing makespan in FMS," European Journal of Operational Research, Elsevier, vol. 116(1), pages 171-182, July.
  32. He, N. & Zhang, D.Z. & Li, Q., 2014. "Agent-based hierarchical production planning and scheduling in make-to-order manufacturing system," International Journal of Production Economics, Elsevier, vol. 149(C), pages 117-130.
  33. Nagraj Balakrishnan & Amiya K. Chakravarty, 2001. "Opportunistic retooling of a flexible machine subject to failure," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(1), pages 79-97, February.
  34. Potts, C. N. & Whitehead, J. D., 2001. "Workload balancing and loop layout in the design of a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(2), pages 326-336, March.
  35. M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.
  36. Liu, Jiyin & MacCarthy, B. L., 1997. "A global MILP model for FMS scheduling," European Journal of Operational Research, Elsevier, vol. 100(3), pages 441-453, August.
  37. Wilbert E. Wilhelm & Radu Gadidov, 2004. "A Branch-and-Cut Approach for a Generic Multiple-Product, Assembly-System Design Problem," INFORMS Journal on Computing, INFORMS, vol. 16(1), pages 39-55, February.
  38. Das, Sanchoy K. & Nagendra, Prashanth, 1997. "Selection of routes in a flexible manufacturing facility," International Journal of Production Economics, Elsevier, vol. 48(3), pages 237-247, February.
  39. Yumin He & Kathryn E. Stecke & Milton L. Smith, 2016. "Robot and machine scheduling with state-dependent part input sequencing in flexible manufacturing systems," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6736-6746, November.
  40. J. Smith, 2015. "Optimal workload allocation in closed queueing networks with state dependent queues," Annals of Operations Research, Springer, vol. 231(1), pages 157-183, August.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.