IDEAS home Printed from https://ideas.repec.org/r/eee/proeco/v71y2001i1-3p447-456.html

The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Sung Hoon Chung & Robert D. Weaver & Hyun Woo Jeon, 2020. "Sustainable Management of Remanufacturing in Dynamic Supply Chains," Networks and Spatial Economics, Springer, vol. 20(3), pages 703-731, September.
  2. Guan, Yongpei & Liu, Tieming, 2010. "Stochastic lot-sizing problem with inventory-bounds and constant order-capacities," European Journal of Operational Research, Elsevier, vol. 207(3), pages 1398-1409, December.
  3. Andreas Goerler & Stefan Voß, 2016. "Dynamic lot-sizing with rework of defective items and minimum lot-size constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2284-2297, April.
  4. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  5. Konstantaras, I. & Papachristos, S., 2007. "Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options," European Journal of Operational Research, Elsevier, vol. 178(2), pages 433-448, April.
  6. Boutarfa, Y. & Senoussi, A. & Brahimi, N. & Aouam, T., 2024. "Integration and substitution in hybrid manufacturing and refurbishing systems," International Journal of Production Economics, Elsevier, vol. 274(C).
  7. Chung, Sung H. & Weaver, Robert D. & Friesz, Terry L., 2013. "Strategic response to pollution taxes in supply chain networks: Dynamic, spatial, and organizational dimensions," European Journal of Operational Research, Elsevier, vol. 231(2), pages 314-327.
  8. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
  9. Boysen, Nils & Emde, Simon & Hoeck, Michael & Kauderer, Markus, 2015. "Part logistics in the automotive industry: Decision problems, literature review and research agenda," European Journal of Operational Research, Elsevier, vol. 242(1), pages 107-120.
  10. Teunter, R.H. & Bayindir, Z.P. & van den Heuvel, W., 2005. "Dynamic lot sizing with product returns," Econometric Institute Research Papers EI 2005-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  11. I. Karakayali & E. Akçalı & S. Çetinkaya & H. Üster, 2013. "Capacitated replenishment and disposal planning for multiple products with resalable returns," Annals of Operations Research, Springer, vol. 203(1), pages 325-350, March.
  12. van den Heuvel, W., 2004. "On the complexity of the economic lot-sizing problem with remanufacturing options," Econometric Institute Research Papers EI 2004-46, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  13. Pan, Zhendong & Tang, Jiafu & Liu, Ou, 2009. "Capacitated dynamic lot sizing problems in closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 198(3), pages 810-821, November.
  14. Mathijn Retel Helmrich & Raf Jans & Wilco van den Heuvel & Albert Wagelmans, 2014. "Economic lot-sizing with remanufacturing: complexity and efficient formulations," IISE Transactions, Taylor & Francis Journals, vol. 46(1), pages 67-86.
  15. Kampf, M. & Kochel, P., 2006. "Simulation-based sequencing and lot size optimisation for a production-and-inventory system with multiple items," International Journal of Production Economics, Elsevier, vol. 104(1), pages 191-200, November.
  16. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
  17. Syed Ali, Sharifah Aishah & Doostmohammadi, Mahdi & Akartunalı, Kerem & van der Meer, Robert, 2018. "A theoretical and computational analysis of lot-sizing in remanufacturing with separate setups," International Journal of Production Economics, Elsevier, vol. 203(C), pages 276-285.
  18. Kovačić, Danijel & Usenik, Janez & Bogataj, Marija, 2017. "Optimal decisions on investments in Urban Energy Cogeneration plants – Extended MRP and fuzzy approach to the stochastic systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 583-595.
  19. Merghem, Mohammed & Haoues, Mohammed & Senoussi, Ahmed & Dahane, Mohammed & Mouss, Nadia Kinza, 2026. "Integrated production and maintenance planning in imperfect hybrid manufacturing–remanufacturing systems with outsourcing and carbon emissions," International Journal of Production Economics, Elsevier, vol. 291(C).
  20. Ahmed Senoussi & Youcef Boutarfa & Nadjib Brahimi & Tarik Aouam, 2024. "Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution," Sustainability, MDPI, vol. 16(17), pages 1-33, August.
  21. Jian Yang & Boaz Golany & Gang Yu, 2005. "A concave‐cost production planning problem with remanufacturing options," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 443-458, August.
  22. Sifaleras, Angelo & Konstantaras, Ioannis & Mladenović, Nenad, 2015. "Variable neighborhood search for the economic lot sizing problem with product returns and recovery," International Journal of Production Economics, Elsevier, vol. 160(C), pages 133-143.
  23. Li, Yongjian & Chen, Jian & Cai, Xiaoqiang, 2007. "Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing," International Journal of Production Economics, Elsevier, vol. 105(2), pages 301-317, February.
  24. Ahmed Senoussi & Youcef Boutarfa & Nadjib Brahimi & Tarik Aouam, 2024. "Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution," Post-Print hal-05030212, HAL.
  25. Piñeyro, Pedro & Viera, Omar, 2010. "The economic lot-sizing problem with remanufacturing and one-way substitution," International Journal of Production Economics, Elsevier, vol. 124(2), pages 482-488, April.
  26. van den Heuvel, W. & Wagelmans, A.P.M., 2007. "Four equivalent lot-sizing models," Econometric Institute Research Papers EI 2007-30, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.