Measuring the Economic Impact of a Road Construction Project in an Area in Japan - A Simplified Spatial Computable General Equilibrium Modeling Approach -

  • Ha Thi Thu Trang
  • Yuzuru Miyata

    ()

  • Zhang Xu

    ()

Registered author(s):

    The study region named San-En-Nanshin region (includes Aichi, part of Nagano and Shizuoka prefecture) is considered as a model of integrated dispersed regions and taken into the National Comprehensive Development Plan of Japanese government under Regional Revitalization Project. A large scale expressway connecting north and south named San-En-Nanshin Expressway is under construction in the study region. It is expected that with the completion of the expressway, the trade, production and consumption pattern of the region will significantly be changed. Therefore this research idea is to develop a model and to test empirically the impact of distance/ commuting time after construction of San-En-Nanshin Expressway upon firm's profit maximization and households' utility maximization behavior in San-En-Nanshin region. The research aims to draw an outline of a new integrated prefectural cross-border economic model of transport, land choice and the economy at firm and household level. In later parts, this research also intends to draw the location choice behavior and corresponding market equilibrium conditions based on transportation demand. As the results, combining this model and the short cut method for the evaluation of economic benefit of a transportation project under the general equilibrium framework, the total annual benefit after construction of San-En-Nanshin Expressway was estimated as 24.3 billion yen, at which 6.3 billion yen for business objective and 18 billion yen for leisure objective. The economic impact of San-En-Nanshin Expressway on Hamamatsu, Nanshin is largest as about 9.7 billion yen. Mito, Otawa, Ichinomiya, Tsukude get little impact. The total project cost of San-En-Nanshin Expressway is estimated as 500 billion yen or 1 trillion yen. If the project cost is about 500 billion yen, the construction of San-En-Nanshin Expressway passes the cost benefit criteria. In case of project cost of 1 trillion yen, this project is rejected under the cost-benefit principle. In this case, one must consider the way of increasing the benefit of the expressway by promotion of economic resource endowment in the sense of quality.

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

    File URL: http://www-sre.wu.ac.at/ersa/ersaconfs/ersa11/e110830aFinal01889.pdf
    Download Restriction: no

    Paper provided by European Regional Science Association in its series ERSA conference papers with number ersa11p1886.

    as
    in new window

    Length:
    Date of creation: Sep 2011
    Date of revision:
    Handle: RePEc:wiw:wiwrsa:ersa11p1886
    Contact details of provider: Postal: Welthandelsplatz 1, 1020 Vienna, Austria
    Web page: http://www.ersa.org

    No references listed on IDEAS
    You can help add them by filling out this form.

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    When requesting a correction, please mention this item's handle: RePEc:wiw:wiwrsa:ersa11p1886. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Gunther Maier)

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    This information is provided to you by IDEAS at the Research Division of the Federal Reserve Bank of St. Louis using RePEc data.