IDEAS home Printed from https://ideas.repec.org/p/enp/wpaper/eprg1926.html
   My bibliography  Save this paper

Financing low-carbon generation in the UK: The hybrid RAB model

Author

Listed:
  • David Newbery

    (Faculty of Economics, University of Cambridge)

  • Michael Pollitt

    (EPRG, CJBS, University of Cambridge)

  • David M Reiner

    (EPRG, CJBS, University of Cambridge)

  • Simon Taylor

    (EPRG, CJBS, University of Cambridge)

Abstract

Decarbonising electricity is a critical first step in mitigating climate damage but low/zero-carbon generation is very capital intensive. Its cost depends critically on the weighted average cost of capital (WACC). Three factors combine to make a low WACC both desirable and feasible in the UK. First, the Stern Report argues for a low social discount rate (1.4% real) for investments in climate mitigation. Second, global and UK real interest rates have been falling steadily - UK gilt index-linked 20-year rates have fallen from +4% in 1995 to -2% (negative) in 2019. CCS and nuclear have long lifetimes over which to recover their capital cost, longer than commercial finance would accept without guarantees, in contrast to renewables where off-take contracts have proven sufficient. Nuclear power faces the additional investment challenge of lengthy uncertain construction. No nuclear plant has ever been built privately without substantial regulatory guarantees. The Regulated Asset Base (RAB) model can address these financing problems for long-lived low-carbon assets. The benefits of placing risk on developers to motivate cost control are small compared to the extra costs of a higher weighted average cost of capital (WACC). A hybrid RAB model (like that used for the Thames Tideway Tunnel)—with excess cost sharing and a cost cap—can reduce risk to deliver an adequately low WACC by accessing infrastructure funds that do not require extensive specialised project knowledge. If the risk of excess costs is spread over the 27 million households and other customers taking two-thirds of electricity, each would bear minimal risk and the cumulative cost would be significantly lower. The levelized cost at the WACC (3.5% real) is £53/MWh if on time and budget, which should be compared with a counterfactual in which all the risk is placed on the company requiring a contract-for-difference with a strike price of £96/MWh for the life of the project (equal to the levelized cost). The levelise
(This abstract was borrowed from another version of this item.)

Suggested Citation

  • David Newbery & Michael Pollitt & David M Reiner & Simon Taylor, 2019. "Financing low-carbon generation in the UK: The hybrid RAB model," Working Papers EPRG1926, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
  • Handle: RePEc:enp:wpaper:eprg1926
    as

    Download full text from publisher

    File URL: https://www.jbs.cam.ac.uk/wp-content/uploads/2023/12/eprg-wp1926.pdf
    Download Restriction: no
    ---><---

    Other versions of this item:

    Citations

    Blog mentions

    As found by EconAcademics.org, the blog aggregator for Economics research:
    1. Financer le nucléaire sans argent public et sans démanteler EDF : une solution existe !
      by François Henimann in Contrepoints on 2022-06-21 02:50:13

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Price, James & Keppo, Ilkka & Dodds, Paul E., 2023. "The role of new nuclear power in the UK's net-zero emissions energy system," Energy, Elsevier, vol. 262(PA).
    2. Jamasb, Tooraj & Llorca, Manuel & Meeus, Leonardo & Schittekatte, Tim, 2020. "Energy Network Innovation for Green Transition: Economic Issues and Regulatory Options," Working Papers 18-2020, Copenhagen Business School, Department of Economics.

    More about this item

    Keywords

    Nuclear power; financing; RAB; WACC; risk;
    All these keywords.

    JEL classification:

    • C54 - Mathematical and Quantitative Methods - - Econometric Modeling - - - Quantitative Policy Modeling
    • D53 - Microeconomics - - General Equilibrium and Disequilibrium - - - Financial Markets
    • E43 - Macroeconomics and Monetary Economics - - Money and Interest Rates - - - Interest Rates: Determination, Term Structure, and Effects
    • G11 - Financial Economics - - General Financial Markets - - - Portfolio Choice; Investment Decisions
    • H54 - Public Economics - - National Government Expenditures and Related Policies - - - Infrastructures
    • L94 - Industrial Organization - - Industry Studies: Transportation and Utilities - - - Electric Utilities
    • Q4 - Agricultural and Natural Resource Economics; Environmental and Ecological Economics - - Energy

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:enp:wpaper:eprg1926. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ruth Newman (email available below). General contact details of provider: https://edirc.repec.org/data/jicamuk.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.