Heuristics for multimachine minmax scheduling problems with general earliness and tardiness costs

Author

Listed:
  • Awi Federgruen
  • Gur Mosheiov

Abstract

We consider the problem of scheduling N jobs on M parallel machines so as to minimize the maximum earliness or tardiness cost incurred for each of the jobs. Earliness and tardiness costs are given by general (but job‐independent) functions of the amount of time a job is completed prior to or after a common due date. We show that in problems with a nonrestrictive due date, the problem decomposes into two parts. Each of the M longest jobs is assigned to a different machine, and all other jobs are assigned to the machines so as to minimize their makespan. With these assignments, the individual scheduling problems for each of the machines are simple to solve. We demonstrate that several simple heuristics of low complexity, based on this characterization, are asymptotically optimal under mild probabilistic conditions. We develop attractive worst‐case bounds for them. We also develop a simple closed‐form lower bound for the minimum cost value. The bound is asymptotically accurate under the same probabilistic conditions. In the case where the due date is restrictive, the problem is more complex only in the sense that the set of initial jobs on the machines is not easily characterized. However, we extend our heuristics and lower bounds to this general case as well. Numerical studies exhibit that these heuristics perform excellently even for small‐ or moderate‐size problems both in the restrictive and nonrestrictive due‐date case. © 1997 John Wiley & Sons, Inc.

Suggested Citation

  • Awi Federgruen & Gur Mosheiov, 1997. "Heuristics for multimachine minmax scheduling problems with general earliness and tardiness costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(3), pages 287-299, April.
  • Handle: RePEc:wly:navres:v:44:y:1997:i:3:p:287-299
    DOI: 10.1002/(SICI)1520-6750(199704)44:33.0.CO;2-4
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/(SICI)1520-6750(199704)44:33.0.CO;2-4
    Download Restriction: no

    File URL: https://libkey.io/10.1002/(SICI)1520-6750(199704)44:33.0.CO;2-4?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Sankaran Lakshminarayan & Ram Lakshmanan & Robert L. Papineau & Rene Rochette, 1978. "Technical Note—Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties," Operations Research, INFORMS, vol. 26(6), pages 1079-1082, December.
    2. Jeffrey B. Sidney, 1977. "Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties," Operations Research, INFORMS, vol. 25(1), pages 62-69, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Gur Mosheiov, 2000. "Minimizing mean absolute deviation of job completion times from the mean completion time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(8), pages 657-668, December.
    2. Mosheiov, Gur & Shadmon, Michal, 2001. "Minmax earliness-tardiness costs with unit processing time jobs," European Journal of Operational Research, Elsevier, vol. 130(3), pages 638-652, May.
    3. G Mosheiov, 2003. "Scheduling unit processing time jobs on an m-machine flow-shop," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(4), pages 437-441, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Michael C. Ferris & Milan Vlach, 1992. "Scheduling with earliness and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(2), pages 229-245, March.
    2. Uttarayan Bagchi & Yih‐Long Chang & Robert S. Sullivan, 1987. "Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(5), pages 739-751, October.
    3. G A Álvarez-Pérez & J L González-Velarde & J W Fowler, 2009. "Crossdocking— Just in Time scheduling: an alternative solution approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(4), pages 554-564, April.
    4. Missaoui, Ahmed & Ruiz, Rubén, 2022. "A parameter-Less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows," European Journal of Operational Research, Elsevier, vol. 303(1), pages 99-113.
    5. Joseph Y.‐T. Leung, 2002. "A dual criteria sequencing problem with earliness and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(4), pages 422-431, June.
    6. Yeong‐Dae Kim & Candace Arai Yano, 1994. "Minimizing mean tardiness and earliness in single‐machine scheduling problems with unequal due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(7), pages 913-933, December.
    7. John J. Kanet & V. Sridharan, 2000. "Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review," Operations Research, INFORMS, vol. 48(1), pages 99-110, February.
    8. Chung‐Lun Li & T. C. E. Cheng, 1994. "The parallel machine min‐max weighted absolute lateness scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 33-46, February.
    9. J. Steve Davis & John J. Kanet, 1993. "Single‐machine scheduling with early and tardy completion costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(1), pages 85-101, February.
    10. Ventura, Jose A. & Radhakrishnan, Sanjay, 2003. "Single machine scheduling with symmetric earliness and tardiness penalties," European Journal of Operational Research, Elsevier, vol. 144(3), pages 598-612, February.
    11. Koulamas, Christos, 1996. "Single-machine scheduling with time windows and earliness/tardiness penalties," European Journal of Operational Research, Elsevier, vol. 91(1), pages 190-202, May.
    12. Lemos, R.F. & Ronconi, D.P., 2015. "Heuristics for the stochastic single-machine problem with E/T costs," International Journal of Production Economics, Elsevier, vol. 168(C), pages 131-142.
    13. N. V. R. Mahadev & Aleksandar Pekeč & Fred S. Roberts, 1998. "On the Meaningfulness of Optimal Solutions to Scheduling Problems: Can an Optimal Solution be Nonoptimal?," Operations Research, INFORMS, vol. 46(3-supplem), pages 120-134, June.
    14. George Li, 1997. "Single machine earliness and tardiness scheduling," European Journal of Operational Research, Elsevier, vol. 96(3), pages 546-558, February.
    15. Yang, Dar-Li & Lai, Chien-Jung & Yang, Suh-Jenq, 2014. "Scheduling problems with multiple due windows assignment and controllable processing times on a single machine," International Journal of Production Economics, Elsevier, vol. 150(C), pages 96-103.
    16. Feng Li & Zhi-Long Chen & Zhi-Long Chen, 2017. "Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms," INFORMS Journal on Computing, INFORMS, vol. 29(2), pages 232-250, May.
    17. Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.
    18. Li, Lei & Fonseca, Daniel J. & Chen, Der-San, 2006. "Earliness-tardiness production planning for just-in-time manufacturing: A unifying approach by goal programming," European Journal of Operational Research, Elsevier, vol. 175(1), pages 508-515, November.
    19. G Mosheiov, 2003. "Scheduling unit processing time jobs on an m-machine flow-shop," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(4), pages 437-441, April.
    20. Tzafestas, Spyros & Triantafyllakis, Alekos, 1993. "Deterministic scheduling in computing and manufacturing systems: a survey of models and algorithms," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 35(5), pages 397-434.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:44:y:1997:i:3:p:287-299. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.