IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v38y1991i2p145-156.html
   My bibliography  Save this article

A cumulative damage shock model with imperfect preventive maintenance

Author

Listed:
  • Masaaki Kijima
  • Toshio Nakagawa

Abstract

In this article we consider a cumulative damage shock model under a periodic preventive maintenance (PM) policy. The PM is imperfect in the sense that each PM reduces the damage level by 100(1 – b)%, 0

Suggested Citation

  • Masaaki Kijima & Toshio Nakagawa, 1991. "A cumulative damage shock model with imperfect preventive maintenance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(2), pages 145-156, April.
  • Handle: RePEc:wly:navres:v:38:y:1991:i:2:p:145-156
    DOI: 10.1002/1520-6750(199104)38:23.0.CO;2-D
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/1520-6750(199104)38:23.0.CO;2-D
    Download Restriction: no

    File URL: https://libkey.io/10.1002/1520-6750(199104)38:23.0.CO;2-D?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Michael L. Pinedo & Sheldon M. Ross, 1980. "Scheduling Jobs Subject to Nonhomogeneous Poisson Shocks," Management Science, INFORMS, vol. 26(12), pages 1250-1257, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Cai, Jun & Willmot, Gordon E., 2005. "Monotonicity and aging properties of random sums," Statistics & Probability Letters, Elsevier, vol. 73(4), pages 381-392, July.
    2. Zhang, Nan & Fouladirad, Mitra & Barros, Anne, 2018. "Optimal imperfect maintenance cost analysis of a two-component system with failure interactions," Reliability Engineering and System Safety, Elsevier, vol. 177(C), pages 24-34.
    3. Haijun Li & Susan H. Xu, 2004. "On the Coordinated Random Group Replacement Policy in Multivariate Repairable Systems," Operations Research, INFORMS, vol. 52(3), pages 464-477, June.
    4. Xian Zhao & Rong Li & Yu Fan & Qingan Qiu, 2022. "Reliability modeling for multi-state systems with a protective device considering multiple triggering mechanism," Journal of Risk and Reliability, , vol. 236(1), pages 173-193, February.
    5. Afsahi, Mohsen & Shafiee, Mahmood, 2020. "A stochastic simulation-optimization model for base-warranty and extended-warranty decision-making of under- and out-of-warranty products," Reliability Engineering and System Safety, Elsevier, vol. 197(C).
    6. Scarsini, Marco & Shaked, Moshe, 2000. "On the value of an item subject to general repair or maintenance," European Journal of Operational Research, Elsevier, vol. 122(3), pages 625-637, May.
    7. Tingting Huang & Songming Chen & Yuepu Zhao & Wei Dai, 2023. "Reliability assessment of degradation processes with random shocks considering recoverable shock damages," Journal of Risk and Reliability, , vol. 237(6), pages 1150-1162, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sam Ransbotham & Ishwar Murthy & Sabyasachi Mitra & Sridhar Narasimhan, 2011. "Sequential Grid Computing: Models and Computational Experiments," INFORMS Journal on Computing, INFORMS, vol. 23(2), pages 174-188, May.
    2. J. Birge & J. B. G. Frenk & J. Mittenthal & A. H. G. Rinnooy Kan, 1990. "Single‐machine scheduling subject to stochastic breakdowns," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(5), pages 661-677, October.
    3. K. D. Glazebrook, 1992. "Single‐machine scheduling of stochastic jobs subject to deterioration or delay," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 613-633, August.
    4. Xiaoqiang Cai & Sean Zhou, 1999. "Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs," Operations Research, INFORMS, vol. 47(3), pages 422-437, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:38:y:1991:i:2:p:145-156. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.