IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v57y2019i18p5705-5724.html
   My bibliography  Save this article

Optimal preventive maintenance strategy for leased equipment under successive usage-based contracts

Author

Listed:
  • Xiaolin Wang
  • Lishuai Li
  • Min Xie

Abstract

In the context of equipment leasing, maintenance service is usually bundled with the leased equipment and offered by the lessor as an integrated package under a lease contract. The lessor is then responsible to prescribe an effective maintenance policy to keep the equipment operational in an economical way. This paper investigates upgrade and preventive maintenance (PM) strategies for industrial equipment during successive usage-based lease contracts with consideration of a warranty period, from the lessor's perspective. The accelerated failure time model and age reduction model are adopted to capture the effect of usage rate and imperfect PM/upgrade on the equipment reliability, respectively. More importantly, since equipment usage rates may vary across different lease contracts, this study develops an age correspondence framework to characterise usage rate shifts between successive lease periods. The optimal upgrade degree and the optimal number and level of PM actions are progressively updated for each upcoming lease period to minimise the total expected lease servicing cost, by considering the usage rate and maintenance implementation history. Numerical studies show that under given cost structures, periodical PM activities within each lease period tends to outperform the pre-leasing upgrade actions, though both of them can reduce the lease servicing cost.

Suggested Citation

  • Xiaolin Wang & Lishuai Li & Min Xie, 2019. "Optimal preventive maintenance strategy for leased equipment under successive usage-based contracts," International Journal of Production Research, Taylor & Francis Journals, vol. 57(18), pages 5705-5724, September.
  • Handle: RePEc:taf:tprsxx:v:57:y:2019:i:18:p:5705-5724
    DOI: 10.1080/00207543.2018.1542181
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2018.1542181
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2018.1542181?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xia, Tangbin & Sun, Bowen & Chen, Zhen & Pan, Ershun & Wang, Hao & Xi, Lifeng, 2021. "Opportunistic maintenance policy integrating leasing profit and capacity balancing for serial-parallel leased systems," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    2. Zhao, Xian & He, Zongda & Wu, Yaguang & Qiu, Qingan, 2022. "Joint optimization of condition-based performance control and maintenance policies for mission-critical systems," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
    3. Zhu, Mixin & Zhou, Xiaojun, 2023. "Hierarchical-clustering-based joint optimization of spare part provision and maintenance scheduling for serial-parallel multi-station manufacturing systems," International Journal of Production Economics, Elsevier, vol. 264(C).
    4. Wang, Xiaolin & Li, Lishuai & Xie, Min, 2020. "An unpunctual preventive maintenance policy under two-dimensional warranty," European Journal of Operational Research, Elsevier, vol. 282(1), pages 304-318.
    5. Jackson, Canek & Pascual, Rodrigo, 2021. "Joint pricing and maintenance strategies in availability-based product-service systems under different overhaul conditions," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
    6. Dai, Anshu & Wei, Guanzhou & Wang, Dongfan & He, Zhen & He, Shuguang, 2021. "The opportunity study of PM strategy for second-hand products sold with a two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 214(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:57:y:2019:i:18:p:5705-5724. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.