IDEAS home Printed from https://ideas.repec.org/a/spr/waterr/v35y2021i7d10.1007_s11269-021-02846-y.html
   My bibliography  Save this article

Long-Term Joint Operation of Cascade Reservoirs Using Enhanced Progressive Optimality Algorithm and Dynamic Programming Hybrid Approach

Author

Listed:
  • Jia Chen

    (Zhuji Municipal Water Conservancy Bureau)

Abstract

Dynamic Programming (DP) is one of the most classical methods adopted for reservoir operation. It reduces the computational efforts of complex high-dimensional problems by piecewise dimensionality reduction and provides the global optimums of the problems, but it suffers the “curse of dimensionality”. Progressive Optimality Algorithm (POA) has been used repeatedly in reservoir operation studies during last decades because it alleviates the “curse of dimensionality” of DP and has good convergence and extensive applicability. Nonetheless, the POA encounters two difficulties in multireservoir operation applications. One is the transfer interrupt problem that makes the search procedure hard to achieve free allocation of water between two non-adjacent stages, and another is the dimensionality problem that leads to a low convergence rate. In order to overcome these deficiencies, this study made some enhancements to the POA and proposed a hybrid approach combining the Enhanced POA and DP (EPOA-DP) for long-term operation of cascade reservoir systems. In EPOA-DP, the EPOA is employed to improve the quality of the solutions and DP is used to reduce the computational effort of the two-stage problem solution. The proposed approach was tested using a real-world four-reservoir cascade system and a ten-reservoir benchmark test example. The results demonstrated that it outperforms the POA both in computational time and quality of the solution.

Suggested Citation

  • Jia Chen, 2021. "Long-Term Joint Operation of Cascade Reservoirs Using Enhanced Progressive Optimality Algorithm and Dynamic Programming Hybrid Approach," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 35(7), pages 2265-2279, May.
  • Handle: RePEc:spr:waterr:v:35:y:2021:i:7:d:10.1007_s11269-021-02846-y
    DOI: 10.1007/s11269-021-02846-y
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s11269-021-02846-y
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s11269-021-02846-y?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Periçaro, Gislaine A. & Karas, Elizabeth W. & Gonzaga, Clóvis C. & Marcílio, Débora C. & Oening, Ana Paula & Matioli, Luiz Carlos & Detzel, Daniel H.M. & de Geus, Klaus & Bessa, Marcelo R., 2020. "Optimal non-anticipative scenarios for nonlinear hydro-thermal power systems," Applied Mathematics and Computation, Elsevier, vol. 387(C).
    2. He, Zhongzheng & Wang, Chao & Wang, Yongqiang & Wei, Bowen & Zhou, Jianzhong & Zhang, Hairong & Qin, Hui, 2021. "Dynamic programming with successive approximation and relaxation strategy for long-term joint power generation scheduling of large-scale hydropower station group," Energy, Elsevier, vol. 222(C).
    3. Gong, Yu & Liu, Pan & Liu, Yini & Huang, Kangdi, 2021. "Robust operation interval of a large-scale hydro-photovoltaic power system to cope with emergencies," Applied Energy, Elsevier, vol. 290(C).
    4. Wang Zhang & Pan Liu & Xizhen Chen & Li Wang & Xueshan Ai & Maoyuan Feng & Dedi Liu & Yuanyuan Liu, 2016. "Optimal Operation of Multi-reservoir Systems Considering Time-lags of Flood Routing," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 30(2), pages 523-540, January.
    5. Ahmadianfar, Iman & Kheyrandish, Ali & Jamei, Mehdi & Gharabaghi, Bahram, 2021. "Optimizing operating rules for multi-reservoir hydropower generation systems: An adaptive hybrid differential evolution algorithm," Renewable Energy, Elsevier, vol. 167(C), pages 774-790.
    6. Deepti Rani & Sandra Mourato & Madalena Moreira, 2020. "A Generalized Dynamic Programming Modelling Approach for Integrated Reservoir Operation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 34(4), pages 1335-1351, March.
    7. Jiang, Zhiqiang & Ji, Changming & Qin, Hui & Feng, Zhongkai, 2018. "Multi-stage progressive optimality algorithm and its application in energy storage operation chart optimization of cascade reservoirs," Energy, Elsevier, vol. 148(C), pages 309-323.
    8. Wang Zhang & Pan Liu & Xizhen Chen & Li Wang & Xueshan Ai & Maoyuan Feng & Dedi Liu & Yuanyuan Liu, 2016. "Optimal Operation of Multi-reservoir Systems Considering Time-lags of Flood Routing," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 30(2), pages 523-540, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yuxin Zhu & Jianzhong Zhou & Yongchuan Zhang & Zhiqiang Jiang & Benjun Jia & Wei Fang, 2022. "Optimal Energy Storage Operation Chart and Output Distribution of Cascade Reservoirs Based on Operating Rules Derivation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 36(14), pages 5751-5766, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Cheng, Qian & Liu, Pan & Xia, Jun & Ming, Bo & Cheng, Lei & Chen, Jie & Xie, Kang & Liu, Zheyuan & Li, Xiao, 2022. "Contribution of complementary operation in adapting to climate change impacts on a large-scale wind–solar–hydro system: A case study in the Yalong River Basin, China," Applied Energy, Elsevier, vol. 325(C).
    2. Di Zhu & Yadong Mei & Xinfa Xu & Zhangjun Liu & Zhenhui Wu & Hao Cai, 2021. "Optimal Operation of a Parallel Multireservoir System for Flood Control using a Stagewise Compensation Method," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 35(6), pages 1689-1710, April.
    3. Niu, Wen-jing & Feng, Zhong-kai & Cheng, Chun-tian, 2018. "Optimization of variable-head hydropower system operation considering power shortage aspect with quadratic programming and successive approximation," Energy, Elsevier, vol. 143(C), pages 1020-1028.
    4. Ming Hu & Guo H. Huang & Wei Sun & Xiaowen Ding & Yongping Li & Bin Fan, 2016. "Optimization and Evaluation of Environmental Operations for Three Gorges Reservoir," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 30(10), pages 3553-3576, August.
    5. Wen-jing Niu & Zhong-kai Feng & Yu-rong Li & Shuai Liu, 2021. "Cooperation Search Algorithm for Power Generation Production Operation Optimization of Cascade Hydropower Reservoirs," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 35(8), pages 2465-2485, June.
    6. Zhuowei Shen & Pan Liu & Bo Ming & Maoyuan Feng & Xiaoqi Zhang & He Li & Aili Xie, 2018. "Deriving Optimal Operating Rules of a Multi-Reservoir System Considering Incremental Multi-Agent Benefit Allocation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 32(11), pages 3629-3645, September.
    7. Di Zhu & Hua Chen & Yanlai Zhou & Yadong Mei & Xinfa Xu & Shenglian Guo, 2022. "A Triple-stage Operation Method for Deriving Operation Rules for Cascade Reservoirs during Catastrophic Flood Events," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 36(13), pages 4863-4883, October.
    8. Aili Xie & Pan Liu & Shenglian Guo & Xiaoqi Zhang & Hao Jiang & Guang Yang, 2018. "Optimal Design of Seasonal Flood Limited Water Levels by Jointing Operation of the Reservoir and Floodplains," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 32(1), pages 179-193, January.
    9. Liao, Shengli & Liu, Huan & Liu, Zhanwei & Liu, Benxi & Li, Gang & Li, Shushan, 2021. "Medium-term peak shaving operation of cascade hydropower plants considering water delay time," Renewable Energy, Elsevier, vol. 179(C), pages 406-417.
    10. Zhongzheng He & Chao Wang & Yongqiang Wang & Hairong Zhang & Heng Yin, 2022. "An Efficient Optimization Method for Long-term Power Generation Scheduling of Hydropower Station: Improved Dynamic Programming with a Relaxation Strategy," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 36(4), pages 1481-1497, March.
    11. Yuan, Wenlin & Zhang, Shijie & Su, Chengguo & Wu, Yang & Yan, Denghua & Wu, Zening, 2022. "Optimal scheduling of cascade hydropower plants in a portfolio electricity market considering the dynamic water delay," Energy, Elsevier, vol. 252(C).
    12. Umut Güvengir & Secil Savasaneril & A. Burcu Altan-Sakarya & Serkan Buhan, 2021. "Short-Term Flood Control and Long-Term Energy Maximization in Multi-reservoir Systems Using Improved Particle Swarm Optimization," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 35(13), pages 4293-4307, October.
    13. Liao, Shengli & Liu, Zhanwei & Liu, Benxi & Cheng, Chuntian & Wu, Xinyu & Zhao, Zhipeng, 2021. "Daily peak shaving operation of cascade hydropower stations with sensitive hydraulic connections considering water delay time," Renewable Energy, Elsevier, vol. 169(C), pages 970-981.
    14. Yufei Ma & Ping-an Zhong & Bin Xu & Feilin Zhu & Jieyu Li & Han Wang & Qingwen Lu, 2021. "Cloud-Based Multidimensional Parallel Dynamic Programming Algorithm for a Cascade Hydropower System," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 35(9), pages 2705-2721, July.
    15. Xinyu Wu & Yuan Lei & Chuntian Cheng & Qilin Ying, 2023. "An Optimal Operation Method for Parallel Hydropower Systems Combining Reservoir Level Control and Power Distribution," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 37(4), pages 1729-1745, March.
    16. Zhiqiang Jiang & Zhengyang Tang & Yi Liu & Yuyun Chen & Zhongkai Feng & Yang Xu & Hairong Zhang, 2019. "Area Moment and Error Based Forecasting Difficulty and its Application in Inflow Forecasting Level Evaluation," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 33(13), pages 4553-4568, October.
    17. Cheng, Qian & Liu, Pan & Xia, Qian & Cheng, Lei & Ming, Bo & Zhang, Wei & Xu, Weifeng & Zheng, Yalian & Han, Dongyang & Xia, Jun, 2023. "An analytical method to evaluate curtailment of hydro–photovoltaic hybrid energy systems and its implication under climate change," Energy, Elsevier, vol. 278(C).
    18. Yi Liu & Zhiqiang Jiang & Zhongkai Feng & Yuyun Chen & Hairong Zhang & Ping Chen, 2019. "Optimization of Energy Storage Operation Chart of Cascade Reservoirs with Multi-Year Regulating Reservoir," Energies, MDPI, vol. 12(20), pages 1-20, October.
    19. He, Wei & Zhang, Xufan & Zhang, Jian & Xu, Hui & Zhou, Hongxing, 2023. "Regulating outflow temperature for multi-objective operation of cascade reservoirs: A case study," Renewable Energy, Elsevier, vol. 211(C), pages 155-165.
    20. Li, Xiao & Liu, Pan & Cheng, Lei & Cheng, Qian & Zhang, Wei & Xu, Shitian & Zheng, Yalian, 2023. "Strategic bidding for a hydro-wind-photovoltaic hybrid system considering the profit beyond forecast time," Renewable Energy, Elsevier, vol. 204(C), pages 277-289.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:waterr:v:35:y:2021:i:7:d:10.1007_s11269-021-02846-y. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.