Material handling and order release control in high-variety make-to-order shops: an assessment by simulation

Author

Listed:
  • Matthias Thürer

    (Jinan University (Zhuhai Campus))

  • Mark Stevenson

    (Lancaster University Management School)

Abstract

In many real-life high-variety make-to-order shops, jobs are physically transported from one station to another, and transportation capacity may constrain order progress on the shop floor. Yet, the material handling literature on vehicle assignment rules remains largely inconclusive on which rule to apply, and it neglects order release control. Similarly, and despite the importance of material handling, its impact is widely neglected in the order release literature. In response, this study assesses the combined performance effect of vehicle assignment, order release and dispatching rules. It uses discrete event simulation. Results show that assigning a vehicle to the station with the largest outgoing queue leads to the best performance. This simple vehicle assignment rule has been largely neglected in the literature since the 1980s. In contrast, the two rules that have received the most attention in the literature – the shortest distance and first-come-first-served rules – lead to the worst performance. Meanwhile, order release has a direct detrimental performance effect in pure job shops with material handling constraints. This identifies an important contingency factor so far neglected in the literature that assesses the applicability of order release. More specifically, the use of order release should be restricted to general flow shops with more directed routings since, in these contexts, it can reduce throughput times without jeopardizing tardiness performance.

Suggested Citation

  • Matthias Thürer & Mark Stevenson, 2021. "Material handling and order release control in high-variety make-to-order shops: an assessment by simulation," Operations Management Research, Springer, vol. 14(3), pages 494-506, December.
  • Handle: RePEc:spr:opmare:v:14:y:2021:i:3:d:10.1007_s12063-021-00229-5
    DOI: 10.1007/s12063-021-00229-5
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12063-021-00229-5
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12063-021-00229-5?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Nuno O. Fernandes & Matthias Thürer & Tatiana M. Pinho & Pedro Torres & Sílvio Carmo-Silva, 2020. "Workload control and optimised order release: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 58(10), pages 3180-3193, May.
    2. Land, Martin J. & Stevenson, Mark & Thürer, Matthias & Gaalman, Gerard J.C., 2015. "Job shop control: In search of the key to delivery improvements," International Journal of Production Economics, Elsevier, vol. 168(C), pages 257-266.
    3. Hafiz Zahid Nabi & Tauseef Aized, 2020. "Performance evaluation of a carousel configured multiple products flexible manufacturing system using Petri net," Operations Management Research, Springer, vol. 13(1), pages 109-129, June.
    4. Stefan Haeussler & Pia Netzer, 2020. "Comparison between rule- and optimization-based workload control concepts: a simulation optimization approach," International Journal of Production Research, Taylor & Francis Journals, vol. 58(12), pages 3724-3743, June.
    5. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    6. Fragapane, Giuseppe & de Koster, René & Sgarbossa, Fabio & Strandhagen, Jan Ola, 2021. "Planning and control of autonomous mobile robots for intralogistics: Literature review and research agenda," European Journal of Operational Research, Elsevier, vol. 294(2), pages 405-426.
    7. Thomas Hutter & Stefan Haeussler & Hubert Missbauer, 2018. "Successful implementation of an order release mechanism based on workload control: a case study of a make-to-stock manufacturer," International Journal of Production Research, Taylor & Francis Journals, vol. 56(4), pages 1565-1580, February.
    8. Victor Cransberg & Martin Land & Christian Hicks & Mark Stevenson, 2016. "Handling the complexities of real-life job shops when implementing workload control: a decision framework and case study," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1094-1109, February.
    9. Matthias Thürer & Mark Stevenson & James Aitken & Cristovao Silva, 2020. "State-dependent service rates in make-to-order shops: an assessment by simulation," Operations Management Research, Springer, vol. 13(1), pages 70-84, June.
    10. Vis, Iris F.A., 2006. "Survey of research in the design and control of automated guided vehicle systems," European Journal of Operational Research, Elsevier, vol. 170(3), pages 677-709, May.
    11. Yavuz A. Bozer & Chate Eamrungroj, 2018. "Throughput analysis of multi-device trip-based material handling systems operating under the modified-FCFS dispatching rule," International Journal of Production Research, Taylor & Francis Journals, vol. 56(4), pages 1486-1503, February.
    12. Matthias Thürer & Lin Ma & Mark Stevenson, 2021. "Workload Control order release in general and pure flow shops with limited buffer size induced blocking: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 59(8), pages 2558-2569, April.
    13. Soepenberg, G.D. & Land, M.J. & Gaalman, G.J.C., 2012. "Adapting workload control for job shops with high routing complexity," International Journal of Production Economics, Elsevier, vol. 140(2), pages 681-690.
    14. Sabuncuoglu, I. & Karapinar, H. Y., 1999. "Analysis of order review/release problems in production systems," International Journal of Production Economics, Elsevier, vol. 62(3), pages 259-279, September.
    15. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2004. "Exploring applicability of the workload control concept," International Journal of Production Economics, Elsevier, vol. 90(2), pages 187-198, July.
    16. Oosterman, Bas & Land, Martin & Gaalman, Gerard, 2000. "The influence of shop characteristics on workload control," International Journal of Production Economics, Elsevier, vol. 68(1), pages 107-119, October.
    17. Nuno O. Fernandes & Martin J. Land & S. Carmo-Silva, 2016. "Aligning workload control theory and practice: lot splitting and operation overlapping issues," International Journal of Production Research, Taylor & Francis Journals, vol. 54(10), pages 2965-2975, May.
    18. Pedro L. Gonzalez-R & Marcos Calle & Jose L. Andrade-Pineda, 2018. "Job shop management of products under internal lifespan and external due date," International Journal of Production Research, Taylor & Francis Journals, vol. 56(16), pages 5457-5474, August.
    19. Fredendall, Lawrence D. & Ojha, Divesh & Wayne Patterson, J., 2010. "Concerning the theory of workload control," European Journal of Operational Research, Elsevier, vol. 201(1), pages 99-111, February.
    20. Land, Martin J. & Gaalman, Gerard J. C., 1998. "The performance of workload control concepts in job shops: Improving the release method," International Journal of Production Economics, Elsevier, vol. 56(1), pages 347-364, September.
    21. Matthias Thürer & Mark Stevenson & Cristovao Silva & Martin J. Land & Lawrence D. Fredendall & Steven A. Melnyk, 2014. "Lean Control for Make-to-Order Companies: Integrating Customer Enquiry Management and Order Release," Production and Operations Management, Production and Operations Management Society, vol. 23(3), pages 463-476, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kaustav Kundu & Martin J. Land & Alberto Portioli-Staudacher & Jos A. C. Bokhorst, 2021. "Order review and release in make-to-order flow shops: analysis and design of new methods," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 750-782, September.
    2. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).
    3. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Non-hierarchical work-in-progress control in manufacturing," International Journal of Production Economics, Elsevier, vol. 257(C).
    4. Stefan Haeussler & Philipp Neuner & Matthias Thürer, 2023. "Balancing earliness and tardiness within workload control order release: an assessment by simulation," Flexible Services and Manufacturing Journal, Springer, vol. 35(2), pages 487-508, June.
    5. Thürer, Matthias & Stevenson, Mark & Land, Martin J., 2016. "On the integration of input and output control: Workload Control order release," International Journal of Production Economics, Elsevier, vol. 174(C), pages 43-53.
    6. Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
    7. Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
    8. Onay, Anita & Stampfer, Christina & Missbauer, Hubert, 2023. "A behavioral perspective on workload control concepts: The influence of order release on operators’ reaction behavior," International Journal of Production Economics, Elsevier, vol. 264(C).
    9. Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.
    10. Thürer, Matthias & Stevenson, Mark & Silva, Cristovao & Qu, Ting, 2017. "Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 188(C), pages 116-127.
    11. Federica Costa & Alberto Portioli-Staudacher, 2021. "Labor flexibility integration in workload control in Industry 4.0 era," Operations Management Research, Springer, vol. 14(3), pages 420-433, December.
    12. Sagawa, Juliana Keiko & Oliveira, Allan Freitas & Mušič, Gašper & Land, Martin J. & Maluf, Arthur Sarro, 2023. "Smart workload input-output control of production systems: A proof of concept," European Journal of Operational Research, Elsevier, vol. 309(1), pages 286-305.
    13. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
    14. Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
    15. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2006. "Grouping machines for effective workload control," International Journal of Production Economics, Elsevier, vol. 104(1), pages 125-142, November.
    16. Matthias Thürer & Mark Stevenson & Ting Qu, 2016. "Job sequencing and selection within workload control order release: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1061-1075, February.
    17. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    18. Matthias Thürer & Mark Stevenson, 2016. "Card-based delivery date promising in pure flow shops with order release control," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6798-6811, November.
    19. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    20. Thürer, Matthias & Stevenson, Mark, 2018. "Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 197(C), pages 275-282.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opmare:v:14:y:2021:i:3:d:10.1007_s12063-021-00229-5. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.