IDEAS home Printed from https://ideas.repec.org/a/spr/jsched/v26y2023i1d10.1007_s10951-022-00764-4.html
   My bibliography  Save this article

Parallel solutions for preemptive makespan scheduling on two identical machines

Author

Listed:
  • Leah Epstein

    (University of Haifa)

Abstract

We consider online preemptive scheduling of jobs arriving one by one, to be assigned to two identical machines, with the goal of makespan minimization. We study the effect of selecting the best solution out of two independent solutions constructed in parallel in an online fashion. Two cases are analyzed, where one case is purely online, and in the other one jobs are presented sorted by non-increasing sizes. We show that using two solutions rather than one improves the performance significantly, but that an optimal solution cannot be obtained for any constant number of solutions constructed in parallel. Our algorithms have the best possible competitive ratios out of algorithms for each one of the classes.

Suggested Citation

  • Leah Epstein, 2023. "Parallel solutions for preemptive makespan scheduling on two identical machines," Journal of Scheduling, Springer, vol. 26(1), pages 61-76, February.
  • Handle: RePEc:spr:jsched:v:26:y:2023:i:1:d:10.1007_s10951-022-00764-4
    DOI: 10.1007/s10951-022-00764-4
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10951-022-00764-4
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10951-022-00764-4?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Peter Sanders & Naveen Sivadasan & Martin Skutella, 2009. "Online Scheduling with Bounded Migration," Mathematics of Operations Research, INFORMS, vol. 34(2), pages 481-498, May.
    2. Robert McNaughton, 1959. "Scheduling with Deadlines and Loss Functions," Management Science, INFORMS, vol. 6(1), pages 1-12, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Leah Epstein, 2023. "Parallel solutions for ordinal scheduling with a small number of machines," Journal of Combinatorial Optimization, Springer, vol. 46(1), pages 1-24, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Liu Guiqing & Li Kai & Cheng Bayi, 2015. "Preemptive Scheduling with Controllable Processing Times on Parallel Machines," Journal of Systems Science and Information, De Gruyter, vol. 3(1), pages 68-76, February.
    2. Hoogeveen, J. A. & Lenstra, J. K. & Veltman, B., 1996. "Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard," European Journal of Operational Research, Elsevier, vol. 89(1), pages 172-175, February.
    3. Yung-Chia Chang & Kuei-Hu Chang & Ching-Ping Zheng, 2022. "Application of a Non-Dominated Sorting Genetic Algorithm to Solve a Bi-Objective Scheduling Problem Regarding Printed Circuit Boards," Mathematics, MDPI, vol. 10(13), pages 1-21, July.
    4. Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
    5. Islam Akaria & Leah Epstein, 2023. "Bin stretching with migration on two hierarchical machines," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 98(1), pages 111-153, August.
    6. Han, Bin & Zhang, Wenjun & Lu, Xiwen & Lin, Yingzi, 2015. "On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: Minimizing the makespan and delivery cost," European Journal of Operational Research, Elsevier, vol. 244(3), pages 704-714.
    7. Chen, Lin & Ye, Deshi & Zhang, Guochuan, 2018. "Parallel machine scheduling with speed-up resources," European Journal of Operational Research, Elsevier, vol. 268(1), pages 101-112.
    8. Xu, Jun & Wang, Jun-Qiang & Liu, Zhixin, 2022. "Parallel batch scheduling: Impact of increasing machine capacity," Omega, Elsevier, vol. 108(C).
    9. Zeynep Adak & Mahmure Övül Arıoğlu Akan & Serol Bulkan, 0. "Multiprocessor open shop problem: literature review and future directions," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-23.
    10. Jiang, Xiaojuan & Lee, Kangbok & Pinedo, Michael L., 2021. "Ideal schedules in parallel machine settings," European Journal of Operational Research, Elsevier, vol. 290(2), pages 422-434.
    11. Viswanath Nagarajan & Joel Wolf & Andrey Balmin & Kirsten Hildrum, 2019. "Malleable scheduling for flows of jobs and applications to MapReduce," Journal of Scheduling, Springer, vol. 22(4), pages 393-411, August.
    12. Yumei Huo, 2019. "Parallel machine makespan minimization subject to machine availability and total completion time constraints," Journal of Scheduling, Springer, vol. 22(4), pages 433-447, August.
    13. Sterna, Malgorzata, 2011. "A survey of scheduling problems with late work criteria," Omega, Elsevier, vol. 39(2), pages 120-129, April.
    14. Eric Angel & Evripidis Bampis & Fadi Kacem & Dimitrios Letsios, 2019. "Speed scaling on parallel processors with migration," Journal of Combinatorial Optimization, Springer, vol. 37(4), pages 1266-1282, May.
    15. Akiyoshi Shioura & Natalia V. Shakhlevich & Vitaly A. Strusevich, 2017. "Machine Speed Scaling by Adapting Methods for Convex Optimization with Submodular Constraints," INFORMS Journal on Computing, INFORMS, vol. 29(4), pages 724-736, November.
    16. Xiaoqiang Cai & George L. Vairaktarakis, 2012. "Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs," Operations Research, INFORMS, vol. 60(6), pages 1436-1450, December.
    17. Lenstra, J. K. & Rinnooy Kan, A. H. G., 1980. "An Introduction To Multiprocessor Scheduling," Econometric Institute Archives 272258, Erasmus University Rotterdam.
    18. Leah Epstein & Lene M. Favrholdt & Jens S. Kohrt, 2006. "Separating online scheduling algorithms with the relative worst order ratio," Journal of Combinatorial Optimization, Springer, vol. 12(4), pages 363-386, December.
    19. Van Dam, Peter & Gaalman, Gerard J. C. & Sierksma, Gerard, 1998. "Designing scheduling systems for packaging in process industries: A tobacco company case," International Journal of Production Economics, Elsevier, vol. 56(1), pages 649-659, September.
    20. Akiyoshi Shioura & Natalia V. Shakhlevich & Vitaly A. Strusevich, 2020. "Scheduling problems with controllable processing times and a common deadline to minimize maximum compression cost," Journal of Global Optimization, Springer, vol. 76(3), pages 471-490, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jsched:v:26:y:2023:i:1:d:10.1007_s10951-022-00764-4. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.