IDEAS home Printed from https://ideas.repec.org/a/spr/jcomop/v17y2009i2d10.1007_s10878-007-9102-4.html
   My bibliography  Save this article

Approximation algorithms for the makespan minimization with positive tails on a single machine with a fixed non-availability interval

Author

Listed:
  • Imed Kacem

    (Université de Technologie de Troyes)

Abstract

In this article, we consider the non-resumable case of the single machine scheduling problem with a fixed non-availability interval. We aim to minimize the makespan when every job has a positive tail. We propose a polynomial approximation algorithm with a worst-case performance ratio of 3/2 for this problem. We show that this bound is tight. We present a dynamic programming algorithm and we show that the problem has an FPTAS (Fully Polynomial Time Approximation Algorithm) by exploiting the well-known approach of Ibarra and Kim (J. ACM 22:463–468, 1975). Such an FPTAS is strongly polynomial. The obtained results outperform the previous polynomial approximation algorithms for this problem.

Suggested Citation

  • Imed Kacem, 2009. "Approximation algorithms for the makespan minimization with positive tails on a single machine with a fixed non-availability interval," Journal of Combinatorial Optimization, Springer, vol. 17(2), pages 117-133, February.
  • Handle: RePEc:spr:jcomop:v:17:y:2009:i:2:d:10.1007_s10878-007-9102-4
    DOI: 10.1007/s10878-007-9102-4
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10878-007-9102-4
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10878-007-9102-4?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Mikhail Y. Kovalyov & Wieslaw Kubiak, 1999. "A Fully Polynomial Approximation Scheme for the Weighted Earliness–Tardiness Problem," Operations Research, INFORMS, vol. 47(5), pages 757-761, October.
    2. Schmidt, Gunter, 2000. "Scheduling with limited machine availability," European Journal of Operational Research, Elsevier, vol. 121(1), pages 1-15, February.
    3. M. A. Kubzin & V. A. Strusevich, 2006. "Planning Machine Maintenance in Two-Machine Shop Scheduling," Operations Research, INFORMS, vol. 54(4), pages 789-800, August.
    4. W J Chen, 2006. "Minimizing total flow time in the single-machine scheduling problem with periodic maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(4), pages 410-415, April.
    5. Carlier, Jacques, 1982. "The one-machine sequencing problem," European Journal of Operational Research, Elsevier, vol. 11(1), pages 42-47, September.
    6. Leslie A. Hall & David B. Shmoys, 1992. "Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better," Mathematics of Operations Research, INFORMS, vol. 17(1), pages 22-35, February.
    7. Webster, Scott, 1995. "Weighted flow time bounds for scheduling identical processors," European Journal of Operational Research, Elsevier, vol. 80(1), pages 103-111, January.
    8. Guoqing Wang & Hongyi Sun & Chengbin Chu, 2005. "Preemptive Scheduling with Availability Constraints to Minimize Total Weighted Completion Times," Annals of Operations Research, Springer, vol. 133(1), pages 183-192, January.
    9. X Qi & T Chen & F Tu, 1999. "Scheduling the maintenance on a single machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(10), pages 1071-1078, October.
    10. C. N. Potts, 1980. "Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times," Operations Research, INFORMS, vol. 28(6), pages 1436-1441, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Imed Kacem & Hans Kellerer & Maryam Seifaddini, 2016. "Efficient approximation schemes for the maximum lateness minimization on a single machine with a fixed operator or machine non-availability interval," Journal of Combinatorial Optimization, Springer, vol. 32(3), pages 970-981, October.
    2. Shabtay, Dvir, 2022. "Single-machine scheduling with machine unavailability periods and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 296(2), pages 423-439.
    3. Lili Zuo & Zhenxia Sun & Lingfa Lu & Liqi Zhang, 2019. "Single-Machine Scheduling with Rejection and an Operator Non-Availability Interval," Mathematics, MDPI, vol. 7(8), pages 1-8, July.
    4. Koulamas, Christos & Kyparisis, George J., 2023. "A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems," European Journal of Operational Research, Elsevier, vol. 305(3), pages 999-1017.
    5. Zhong, Xueling & Ou, Jinwen & Wang, Guoqing, 2014. "Order acceptance and scheduling with machine availability constraints," European Journal of Operational Research, Elsevier, vol. 232(3), pages 435-441.
    6. Shi-Sheng Li & Ren-Xia Chen, 2022. "Minimizing total weighted late work on a single-machine with non-availability intervals," Journal of Combinatorial Optimization, Springer, vol. 44(2), pages 1330-1355, September.
    7. Hfaiedh, Walid & Sadfi, Chérif & Kacem, Imed & Hadj-Alouane, Atidel, 2015. "A branch-and-bound method for the single-machine scheduling problem under a non-availability constraint for maximum delivery time minimization," Applied Mathematics and Computation, Elsevier, vol. 252(C), pages 496-502.
    8. Shabtay, Dvir & Zofi, Moshe, 2018. "Single machine scheduling with controllable processing times and an unavailability period to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 198(C), pages 191-200.
    9. Jing Fan & Xiwen Lu, 2015. "Supply chain scheduling problem in the hospital with periodic working time on a single machine," Journal of Combinatorial Optimization, Springer, vol. 30(4), pages 892-905, November.
    10. Peihai Liu & Xiwen Lu, 2015. "Online scheduling on two parallel machines with release dates and delivery times," Journal of Combinatorial Optimization, Springer, vol. 30(2), pages 347-359, August.
    11. Ji Tian & Yan Zhou & Ruyan Fu, 2020. "An improved semi-online algorithm for scheduling on a single machine with unexpected breakdown," Journal of Combinatorial Optimization, Springer, vol. 40(1), pages 170-180, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kacem, Imed & Chu, Chengbin, 2008. "Efficient branch-and-bound algorithm for minimizing the weighted sum of completion times on a single machine with one availability constraint," International Journal of Production Economics, Elsevier, vol. 112(1), pages 138-150, March.
    2. C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
    3. Imed Kacem & Hans Kellerer & Maryam Seifaddini, 2016. "Efficient approximation schemes for the maximum lateness minimization on a single machine with a fixed operator or machine non-availability interval," Journal of Combinatorial Optimization, Springer, vol. 32(3), pages 970-981, October.
    4. Hanane Krim & Rachid Benmansour & David Duvivier & Daoud Aït-Kadi & Said Hanafi, 2020. "Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance," Computational Optimization and Applications, Springer, vol. 75(1), pages 291-320, January.
    5. Federico Alonso-Pecina & José Alberto Hernández & José Maria Sigarreta & Nodari Vakhania, 2020. "Fast Approximation for Scheduling One Machine," Mathematics, MDPI, vol. 8(9), pages 1-18, September.
    6. Chen, Wen-Jinn, 2009. "Minimizing number of tardy jobs on a single machine subject to periodic maintenance," Omega, Elsevier, vol. 37(3), pages 591-599, June.
    7. Hans Kellerer & Vitaly A. Strusevich, 2016. "Optimizing the half-product and related quadratic Boolean functions: approximation and scheduling applications," Annals of Operations Research, Springer, vol. 240(1), pages 39-94, May.
    8. Philip Kaminsky, 2003. "The effectiveness of the longest delivery time rule for the flow shop delivery time problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(3), pages 257-272, April.
    9. Wenchang Luo & Yao Xu & Weitian Tong & Guohui Lin, 2019. "Single-machine scheduling with job-dependent machine deterioration," Journal of Scheduling, Springer, vol. 22(6), pages 691-707, December.
    10. Hfaiedh, Walid & Sadfi, Chérif & Kacem, Imed & Hadj-Alouane, Atidel, 2015. "A branch-and-bound method for the single-machine scheduling problem under a non-availability constraint for maximum delivery time minimization," Applied Mathematics and Computation, Elsevier, vol. 252(C), pages 496-502.
    11. Liang-Liang Fu & Mohamed Ali Aloulou & Christian Artigues, 2018. "Integrated production and outbound distribution scheduling problems with job release dates and deadlines," Journal of Scheduling, Springer, vol. 21(4), pages 443-460, August.
    12. Kacem, Imed & Chu, Chengbin, 2008. "Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1080-1089, June.
    13. Olivier Guyon & Pierre Lemaire & Éric Pinson & David Rivreau, 2014. "Solving an integrated job-shop problem with human resource constraints," Annals of Operations Research, Springer, vol. 213(1), pages 147-171, February.
    14. Wenda Zhang & Jason J. Sauppe & Sheldon H. Jacobson, 2021. "An Improved Branch-and-Bound Algorithm for the One-Machine Scheduling Problem with Delayed Precedence Constraints," INFORMS Journal on Computing, INFORMS, vol. 33(3), pages 1091-1102, July.
    15. Sun Lee, Ik & Yoon, S.H., 2010. "Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs," Omega, Elsevier, vol. 38(6), pages 509-521, December.
    16. Allaoui, H. & Lamouri, S. & Artiba, A. & Aghezzaf, E., 2008. "Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 112(1), pages 161-167, March.
    17. Ji Tian & Yan Zhou & Ruyan Fu, 2020. "An improved semi-online algorithm for scheduling on a single machine with unexpected breakdown," Journal of Combinatorial Optimization, Springer, vol. 40(1), pages 170-180, July.
    18. Chang, Yung-Chia & Lee, Chung-Yee, 2004. "Machine scheduling with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 158(2), pages 470-487, October.
    19. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    20. Xu, Dehua & Wan, Long & Liu, Aihua & Yang, Dar-Li, 2015. "Single machine total completion time scheduling problem with workload-dependent maintenance duration," Omega, Elsevier, vol. 52(C), pages 101-106.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jcomop:v:17:y:2009:i:2:d:10.1007_s10878-007-9102-4. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.