Closed-form expressions of the run-length distribution of the nonparametric double sampling precedence monitoring scheme
Author
Abstract
Suggested Citation
DOI: 10.1007/s00180-024-01488-z
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- S. Chakraborti & P. van der Laan & M. A. van de Wiel, 2004. "A class of distribution‐free control charts," Journal of the Royal Statistical Society Series C, Royal Statistical Society, vol. 53(3), pages 443-462, August.
- Jean-Claude Malela-Majika & Sandile C. Shongwe & Philippe Castagliola, 2022. "One-sided precedence monitoring schemes for unknown shift sizes using generalized 2-of-(h+1) and w-of-w improved runs-rules," Communications in Statistics - Theory and Methods, Taylor & Francis Journals, vol. 51(9), pages 2803-2837, March.
- Chakraborti, S. & Eryilmaz, S. & Human, S.W., 2009. "A phase II nonparametric control chart based on precedence statistics with runs-type signaling rules," Computational Statistics & Data Analysis, Elsevier, vol. 53(4), pages 1054-1065, February.
- Michael C. Fu & Jian-Qiang Hu, 1999. "Efficient Design and Sensitivity Analysis of Control Charts Using Monte Carlo Simulation," Management Science, INFORMS, vol. 45(3), pages 395-413, March.
- S. W. Human & P. Kritzinger & S. Chakraborti, 2011. "Robustness of the EWMA control chart for individual observations," Journal of Applied Statistics, Taylor & Francis Journals, vol. 38(10), pages 2071-2087.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Nikolaos I. Panayiotou & Ioannis S. Triantafyllou, 2023. "A Class of Enhanced Nonparametric Control Schemes Based on Order Statistics and Runs," Stats, MDPI, vol. 6(1), pages 1-14, February.
- Graham, M.A. & Mukherjee, A. & Chakraborti, S., 2012. "Distribution-free exponentially weighted moving average control charts for monitoring unknown location," Computational Statistics & Data Analysis, Elsevier, vol. 56(8), pages 2539-2561.
- Saber Ali & Zameer Abbas & Hafiz Zafar Nazir & Muhammad Riaz & Xingfa Zhang & Yuan Li, 2020. "On Designing Non-Parametric EWMA Sign Chart under Ranked Set Sampling Scheme with Application to Industrial Process," Mathematics, MDPI, vol. 8(9), pages 1-20, September.
- Ozdemir, Deniz & Yucesan, Enver & Herer, Yale T., 2006. "Multi-location transshipment problem with capacitated transportation," European Journal of Operational Research, Elsevier, vol. 175(1), pages 602-621, November.
- Lianjie Shu & Jinyu Fan, 2018. "A distribution‐free control chart for monitoring high‐dimensional processes based on interpoint distances," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(4), pages 317-330, June.
- Lianjie Shu & Wenpo Huang & Wei Jiang, 2014. "A novel gradient approach for optimal design and sensitivity analysis of EWMA control charts," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(3), pages 223-237, April.
- Gong, Y. & Yucesan, E., 2006. "The Multi-Location Transshipment Problem with Positive Replenishment Lead Times," ERIM Report Series Research in Management ERS-2006-048-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Özdemir, Deniz & Yücesan, Enver & Herer, Yale T., 2013. "Multi-location transshipment problem with capacitated production," European Journal of Operational Research, Elsevier, vol. 226(3), pages 425-435.
- Willem Albers & Wilbert C. M. Kallenberg, 2009. "Normal control charts with nonparametric safeguard," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 63(1), pages 63-81, February.
- M. A. Graham & S. W. Human & S. Chakraborti, 2010. "A Phase I nonparametric Shewhart-type control chart based on the median," Journal of Applied Statistics, Taylor & Francis Journals, vol. 37(11), pages 1795-1813.
- Nandini Das, 2011. "Control Charts Based on the g-and-h Distribution," Stochastics and Quality Control, De Gruyter, vol. 26(1), pages 3-14, January.
- Peng, Yijie & Fu, Michael C. & Hu, Jiaqiao & L’Ecuyer, Pierre & Tuffin, Bruno, 2025. "Generalized likelihood ratio method for stochastic models with uniform random numbers as inputs," European Journal of Operational Research, Elsevier, vol. 321(2), pages 493-502.
- Michael C. Fu, 2008. "What you should know about simulation and derivatives," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(8), pages 723-736, December.
- Qiu, Peihua & Li, Zhonghua, 2011. "Distribution-free monitoring of univariate processes," Statistics & Probability Letters, Elsevier, vol. 81(12), pages 1833-1840.
- Human, S.W. & Chakraborti, S. & Smit, C.F., 2010. "Shewhart-type control charts for variation in phase I data analysis," Computational Statistics & Data Analysis, Elsevier, vol. 54(4), pages 863-874, April.
- Graham, M.A. & Chakraborti, S. & Human, S.W., 2011. "A nonparametric exponentially weighted moving average signed-rank chart for monitoring location," Computational Statistics & Data Analysis, Elsevier, vol. 55(8), pages 2490-2503, August.
- Chakraborti, S. & Eryilmaz, S. & Human, S.W., 2009. "A phase II nonparametric control chart based on precedence statistics with runs-type signaling rules," Computational Statistics & Data Analysis, Elsevier, vol. 53(4), pages 1054-1065, February.
- Hachicha, Wafik & Ammeri, Ahmed & Masmoudi, Faouzi & Chachoub, Habib, 2010. "A comprehensive literature classification of simulation optimisation methods," MPRA Paper 27652, University Library of Munich, Germany.
- Sotiris Bersimis & Kostas Triantafyllopoulos, 2020. "Dynamic Non-parametric Monitoring of Air-Pollution," Methodology and Computing in Applied Probability, Springer, vol. 22(4), pages 1457-1479, December.
- Willem Albers & Wilbert Kallenberg, 2009. "CUMIN charts," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 70(1), pages 111-130, June.
More about this item
Keywords
Shewhart; Control chart; Order statistic; Closed-form expression; Distribution-free; Nonparametric; Precedence; Exact run-length distribution; Performance analysis;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:compst:v:40:y:2025:i:1:d:10.1007_s00180-024-01488-z. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.