A discrete approach to designing optimal hedging-point control policies for production-inventory systems with general stochastic behavior
Author
Abstract
Suggested Citation
DOI: 10.1007/s10287-007-0063-y
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.References listed on IDEAS
- T. Bielecki & P. R. Kumar, 1988. "Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems," Operations Research, INFORMS, vol. 36(4), pages 532-541, August.
- Robert R. Meyer & Michael H. Rothkopf & Stephen A. Smith, 1979. "Reliability and Inventory in a Production-Storage System," Management Science, INFORMS, vol. 25(8), pages 799-807, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jingfu Huang & Gaoke Wu & Yiju Wang, 2021. "Retailer’s Emergency Ordering Policy When Facing an Impending Supply Disruption," Sustainability, MDPI, vol. 13(13), pages 1-21, June.
- Süleyman Demirel & Roman Kapuscinski & Man Yu, 2018. "Strategic Behavior of Suppliers in the Face of Production Disruptions," Management Science, INFORMS, vol. 64(2), pages 533-551, February.
- E J Lodree Jr & S Taskin, 2008. "An insurance risk management framework for disaster relief and supply chain disruption inventory planning," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(5), pages 674-684, May.
- Snyder, Lawrence V., 2014. "A tight approximation for an EOQ model with supply disruptions," International Journal of Production Economics, Elsevier, vol. 155(C), pages 91-108.
- Antonio Arreola‐Risa & Gregory A. DeCroix, 1998. "Inventory management under random supply disruptions and partial backorders," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(7), pages 687-703, October.
- Brian Tomlin, 2006. "On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks," Management Science, INFORMS, vol. 52(5), pages 639-657, May.
- Moshe Dror & Kenneth R. Smith & Candace Arai Yano, 2009. "Deux Chemicals Inc. Goes Just-in-Time," Interfaces, INFORMS, vol. 39(6), pages 503-515, December.
- Xiang Li, 2017. "Optimal procurement strategies from suppliers with random yield and all-or-nothing risks," Annals of Operations Research, Springer, vol. 257(1), pages 167-181, October.
- Mahmut Parlar & David Perry, 1996. "Inventory models of future supply uncertainty with single and multiple suppliers," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 191-210, March.
- Barış Tan, 2019. "Production Control with Price, Cost, and Demand Uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1057-1085, December.
- B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
- S. P. Sethi & W. Suo & M. I. Taksar & Q. Zhang, 1997. "Optimal Production Planning in a Stochastic Manufacturing System with Long-Run Average Cost," Journal of Optimization Theory and Applications, Springer, vol. 92(1), pages 161-188, January.
- Gregory A. DeCroix, 2013. "Inventory Management for an Assembly System Subject to Supply Disruptions," Management Science, INFORMS, vol. 59(9), pages 2079-2092, September.
- Gharbi, A. & Pellerin, R. & Sadr, J., 2008. "Production rate control for stochastic remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 112(1), pages 37-47, March.
- Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
- Parlar, Mahmut & Perry, David, 1995. "Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain," European Journal of Operational Research, Elsevier, vol. 84(2), pages 431-443, July.
- Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
- Francis De Vericourt & Fikri Karaesmen & Yves Dallery, 2000. "Dynamic Scheduling in a Make-to-Stock System: A Partial Characterization of Optimal Policies," Operations Research, INFORMS, vol. 48(5), pages 811-819, October.
- Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
- Chan, Felix T.S. & Wang, Zheng & Zhang, Jie, 2007. "A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1528-1558, February.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:comgts:v:6:y:2009:i:4:p:399-409. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.