IDEAS home Printed from https://ideas.repec.org/a/inm/oropre/v58y2010i6p1792-1797.html
   My bibliography  Save this article

TECHNICAL NOTE---Optimal Product Pricing and Component Production Quantities for an Assembly System Under Supply Uncertainty

Author

Listed:
  • Wenting Pan

    (The Paul Merage School of Business, University of California, Irvine, Irvine, California 92697)

  • Kut C. So

    (The Paul Merage School of Business, University of California, Irvine, Irvine, California 92697)

Abstract

We consider an assemble-to-order system where one of the components faces uncertainty in the supply process in which the actual available quantity is equal to some random fraction of the production quantity. Demand is assumed to be price-dependent. We analyze how the supply uncertainty of one component affects the product pricing and production quantities of all the components under the assembly structure. We show that it is profitable for the firm to assemble the product only if the product price exceeds a certain threshold. This price threshold increases as the unit cost of each component or the degree of variability of the supply reliability distribution increases, but it is independent of the underlying demand function and demand distribution. Also, the optimal product price decreases as supply uncertainty decreases. We further show that under deterministic demand, the components can be managed independently such that the production quantity or unit cost of the component with supply uncertainty does not affect the optimal production quantity of the other components, as long as it is profitable to assemble the product. However, when demand is stochastic, the optimal production quantity of each component depends on the supply reliability distribution as well as the unit costs of the other components. For a fixed product price, the optimal production quantities of the components are smaller when the unit product price is low, and they are higher when the unit product price is high as compared to the case with no supply uncertainty.

Suggested Citation

  • Wenting Pan & Kut C. So, 2010. "TECHNICAL NOTE---Optimal Product Pricing and Component Production Quantities for an Assembly System Under Supply Uncertainty," Operations Research, INFORMS, vol. 58(6), pages 1792-1797, December.
  • Handle: RePEc:inm:oropre:v:58:y:2010:i:6:p:1792-1797
    DOI: 10.1287/opre.1100.0870
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.1100.0870
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.1100.0870?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Jing-Sheng Song & Candace A. Yano & Panupol Lerssrisuriya, 2000. "Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 287-296, July.
    2. Gurnani, Haresh & Gerchak, Yigal, 2007. "Coordination in decentralized assembly systems with uncertain component yields," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1559-1576, February.
    3. Jing-Sheng Song & Susan H. Xu & Bin Liu, 1999. "Order-Fulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes," Operations Research, INFORMS, vol. 47(1), pages 131-149, February.
    4. Ramesh Bollapragada & Uday S. Rao & Jun Zhang, 2004. "Managing Inventory and Supply Performance in Assembly Systems with Random Supply Capacity and Demand," Management Science, INFORMS, vol. 50(12), pages 1729-1743, December.
    5. Jing-Sheng Song & David D. Yao, 2002. "Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times," Operations Research, INFORMS, vol. 50(5), pages 889-903, October.
    6. Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Guo Li & Hui Mao & Lei Xiao, 2017. "Impacts of Leader–Follower Structure on Pricing and Production Strategies in a Decentralized Assembly System," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(01), pages 1-24, February.
    2. Yin, Zhe & Wang, Chen & Yin, Qian, 2018. "Coordinating overseas and local sourcing through a capacitated expediting transportation policy," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 258-271.
    3. Lingxiu Dong & Guang Xiao & Nan Yang, 2023. "Supply diversification under random yield: The impact of price postponement," Production and Operations Management, Production and Operations Management Society, vol. 32(4), pages 1112-1132, April.
    4. Pan, Wenting & So, Kut C. & Xiao, Guang, 2022. "Benefits of backup sourcing for components in assembly systems under supply uncertainty," European Journal of Operational Research, Elsevier, vol. 302(1), pages 158-171.
    5. Anand Paul & Tharanga Rajapakshe & Suman Mallik, 2019. "Socially Optimal Contracting between a Regional Blood Bank and Hospitals," Production and Operations Management, Production and Operations Management Society, vol. 28(4), pages 908-932, April.
    6. Serel, Doğan A., 2017. "A single-period stocking and pricing problem involving stochastic emergency supply," International Journal of Production Economics, Elsevier, vol. 185(C), pages 180-195.
    7. Guo Li & Lin Li & Mengqi Liu & Suresh P. Sethi, 2020. "Impact of power structures in a subcontracting assembly system," Annals of Operations Research, Springer, vol. 291(1), pages 475-498, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Pan, Wenting & So, Kut C. & Xiao, Guang, 2022. "Benefits of backup sourcing for components in assembly systems under supply uncertainty," European Journal of Operational Research, Elsevier, vol. 302(1), pages 158-171.
    2. Guo Li & Mengqi Liu & Xu Guan, 2017. "Diversity of payment contracts in a decentralized assembly system," Annals of Operations Research, Springer, vol. 257(1), pages 613-639, October.
    3. Jie Chu & Kai Huang, 2020. "Integrating decisions with advance supply information in an assemble‐to‐order system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(1), pages 34-44, February.
    4. Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
    5. Xiao, Yongbo & Chen, Jian & Lee, Chung-Yee, 2010. "Optimal decisions for assemble-to-order systems with uncertain assembly capacity," International Journal of Production Economics, Elsevier, vol. 123(1), pages 155-165, January.
    6. Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
    7. Bo He & Yange Yang, 2018. "Mitigating supply risk: an approach with quantity flexibility procurement," Annals of Operations Research, Springer, vol. 271(2), pages 599-617, December.
    8. Yi Yang & Youhua (Frank) Chen & Yun Zhou, 2014. "Coordinating Inventory Control and Pricing Strategies Under Batch Ordering," Operations Research, INFORMS, vol. 62(1), pages 25-37, February.
    9. Fei Ye & Qiang Lin & Yina Li, 2020. "Coordination for contract farming supply chain with stochastic yield and demand under CVaR criterion," Operational Research, Springer, vol. 20(1), pages 369-397, March.
    10. Bengisu Urlu & Nesim K. Erkip, 2020. "Safety stock placement for serial systems under supply process uncertainty," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 395-424, June.
    11. Yao Zhao & David Simchi-Levi, 2006. "Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times," Operations Research, INFORMS, vol. 54(4), pages 706-724, August.
    12. Xu, He, 2010. "Managing production and procurement through option contracts in supply chains with random yield," International Journal of Production Economics, Elsevier, vol. 126(2), pages 306-313, August.
    13. Kimitoshi Sato & Kyoko Yagi & Masahito Shimazaki, 2018. "A Stochastic Inventory Model for a Random Yield Supply Chain with Wholesale-Price and Shortage Penalty Contracts," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 35(06), pages 1-30, December.
    14. Karl Inderfurth, 2015. "Safety Stocks in Centralized and Decentralized Supply Chains under Different Types of Random Yields," FEMM Working Papers 150007, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
    15. Peng, Yang & Yan, Xiaoming & Jiang, Yujie & Ji, Min & Cheng, T.C.E., 2021. "Competition and coordination for supply chain networks with random yields," International Journal of Production Economics, Elsevier, vol. 239(C).
    16. Zare, Marjan & Esmaeili, Maryam & He, Yuanjie, 2019. "Implications of risk-sharing strategies on supply chains with multiple retailers and under random yield," International Journal of Production Economics, Elsevier, vol. 216(C), pages 413-424.
    17. Bo He & He Huang & Kaifu Yuan, 2016. "Managing supply disruption through procurement strategy and price competition," International Journal of Production Research, Taylor & Francis Journals, vol. 54(7), pages 1980-1999, April.
    18. Wu, Meng & Zhu, Stuart X. & Teunter, Ruud H., 2013. "The risk-averse newsvendor problem with random capacity," European Journal of Operational Research, Elsevier, vol. 231(2), pages 328-336.
    19. Vernon Ning Hsu & Chung Yee Lee & Kut C. So, 2006. "Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing," Management Science, INFORMS, vol. 52(3), pages 337-351, March.
    20. Yong He & Xuan Zhao, 2016. "Contracts and coordination: Supply chains with uncertain demand and supply," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(4), pages 305-319, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:58:y:2010:i:6:p:1792-1797. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.