IDEAS home Printed from https://ideas.repec.org/a/inm/oropre/v47y1999i3p488-491.html
   My bibliography  Save this article

Dynamics of Two- and Three-Worker “Bucket Brigade” Production Lines

Author

Listed:
  • John J. Bartholdi

    (Georgia Institute of Technology, Atlanta, Georgia)

  • Leonid A. Bunimovich

    (Georgia Institute of Technology, Atlanta, Georgia)

  • Donald D. Eisenstein

    (The University of Chicago, Chicago, Illinois)

Abstract

We describe all possible asymptotic behavior of “bucket brigade” production lines with two or three workers, each characterized by a constant work velocity. The results suggest wariness in interpreting simulation results. They also suggest a strategy for partitioning a workforce into effective teams to staff the lines.

Suggested Citation

  • John J. Bartholdi & Leonid A. Bunimovich & Donald D. Eisenstein, 1999. "Dynamics of Two- and Three-Worker “Bucket Brigade” Production Lines," Operations Research, INFORMS, vol. 47(3), pages 488-491, June.
  • Handle: RePEc:inm:oropre:v:47:y:1999:i:3:p:488-491
    DOI: 10.1287/opre.47.3.488
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.47.3.488
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.47.3.488?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Emil Zavadlav & John O. McClain & L. Joseph Thomas, 1996. "Self-Buffering, Self-Balancing, Self-Flushing Production Lines," Management Science, INFORMS, vol. 42(8), pages 1151-1164, August.
    2. John J. Bartholdi & Donald D. Eisenstein, 1996. "A Production Line that Balances Itself," Operations Research, INFORMS, vol. 44(1), pages 21-34, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Koichi Nakade, 2017. "Effect of worker sequence on cycle time in a U-shaped line with chase mode," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2752-2763, May.
    2. Yun Fong Lim, 2011. "TECHNICAL NOTE---Cellular Bucket Brigades," Operations Research, INFORMS, vol. 59(6), pages 1539-1545, December.
    3. Sunder Kekre & Uday S. Rao & Jayashankar M. Swaminathan & Jun Zhang, 2003. "Reconfiguring a Remanufacturing Line at Visteon, Mexico," Interfaces, INFORMS, vol. 33(6), pages 30-43, December.
    4. Qin Chen & ShiLong Liao & ZhongZhen Wu & ShuPing Yi, 2016. "Comparative analysis of the performance of a novel U-shaped ‘chasing-overtaking’ production line," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3677-3690, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sigrún Andradóttir & Hayriye Ayhan & Douglas G. Down, 2001. "Server Assignment Policies for Maximizing the Steady-State Throughput of Finite Queueing Systems," Management Science, INFORMS, vol. 47(10), pages 1421-1439, October.
    2. Wallace J. Hopp & Eylem Tekin & Mark P. Van Oyen, 2004. "Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers," Management Science, INFORMS, vol. 50(1), pages 83-98, January.
    3. Gregory Dobson & Tolga Tezcan & Vera Tilson, 2013. "Optimal Workflow Decisions for Investigators in Systems with Interruptions," Management Science, INFORMS, vol. 59(5), pages 1125-1141, May.
    4. Sigrún Andradóttir & Hayriye Ayhan & Douglas G. Down, 2007. "Compensating for Failures with Flexible Servers," Operations Research, INFORMS, vol. 55(4), pages 753-768, August.
    5. Koichi Nakade, 2017. "Effect of worker sequence on cycle time in a U-shaped line with chase mode," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2752-2763, May.
    6. Suresh Chand & Ting Zeng, 2001. "A Comparison of U-Line and Straight-Line Performances Under Stochastic Task Times," Manufacturing & Service Operations Management, INFORMS, vol. 3(2), pages 138-150, January.
    7. S.M.R. Iravani & J.A. Buzacott & M.J.M. Posner, 2005. "A robust policy for serial agile production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(1), pages 58-73, February.
    8. Eylem Tekin & Wallace J. Hopp & Mark P. Van Oyen, 2002. "Benefits of Skill Chaining in Production Lines with Cross-Trained Workers: An Extended Abstract," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 17-20.
    9. Vercellis, Carlo, 1999. "Multi-plant production planning in capacitated self-configuring two-stage serial systems," European Journal of Operational Research, Elsevier, vol. 119(2), pages 451-460, December.
    10. John O. McClain & Kenneth L. Schultz & L. Joseph Thomas, 2000. "Management of Worksharing Systems," Manufacturing & Service Operations Management, INFORMS, vol. 2(1), pages 49-67, July.
    11. Sennott, Linn I. & Van Oyen, Mark P. & Iravani, Seyed M.R., 2006. "Optimal dynamic assignment of a flexible worker on an open production line with specialists," European Journal of Operational Research, Elsevier, vol. 170(2), pages 541-566, April.
    12. Wallace J. Hopp & Seyed M. R. Iravani & Biying Shou, 2005. "Serial Agile Production Systems with Automation," Operations Research, INFORMS, vol. 53(5), pages 852-866, October.
    13. John J. Bartholdi & Donald D. Eisenstein & Robert D. Foley, 2001. "Performance of Bucket Brigades When Work Is Stochastic," Operations Research, INFORMS, vol. 49(5), pages 710-719, October.
    14. Sigrún Andradóttir & Hayriye Ayhan, 2005. "Throughput Maximization for Tandem Lines with Two Stations and Flexible Servers," Operations Research, INFORMS, vol. 53(3), pages 516-531, June.
    15. Richard L. Daniels & Joseph B. Mazzola & Dailun Shi, 2004. "Flow Shop Scheduling with Partial Resource Flexibility," Management Science, INFORMS, vol. 50(5), pages 658-669, May.
    16. Qin Chen & ShiLong Liao & ZhongZhen Wu & ShuPing Yi, 2016. "Comparative analysis of the performance of a novel U-shaped ‘chasing-overtaking’ production line," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3677-3690, June.
    17. Nakade, Koichi & Ohno, Katsuhisa, 2003. "Separate and carousel type allocations of workers in a U-shaped production line," European Journal of Operational Research, Elsevier, vol. 145(2), pages 403-424, March.
    18. Armbruster, Dieter & Gel, Esma S., 2006. "Bucket brigades revisited: Are they always effective?," European Journal of Operational Research, Elsevier, vol. 172(1), pages 213-229, July.
    19. Soondo Hong & Andrew L. Johnson & Brett A. Peters, 2016. "Order batching in a bucket brigade order picking system considering picker blocking," Flexible Services and Manufacturing Journal, Springer, vol. 28(3), pages 425-441, September.
    20. Lennart Zey & Dirk Briskorn & Nils Boysen, 2022. "Twin-crane scheduling during seaside workload peaks with a dedicated handshake area," Journal of Scheduling, Springer, vol. 25(1), pages 3-34, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:47:y:1999:i:3:p:488-491. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.