IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v42y1996i9p1260-1276.html
   My bibliography  Save this article

Scheduling Parallel Manufacturing Cells with Resource Flexibility

Author

Listed:
  • Richard L. Daniels

    (School of Management, Georgia Institute of Technology, Atlanta, Georgia 30332-0520)

  • Barbara J. Hoopes

    (Pamplin College of Business, Virginia Polytechnic Institute and State University, Falls Church, Virginia 22042)

  • Joseph B. Mazzola

    (Fuqua School of Business, Duke University, Durham, North Carolina 27706)

Abstract

This paper investigates the improvements in manufacturing performance that can be realized by broadening the scope of the production scheduling function to include both job sequencing and processing-time control through the deployment of a flexible resource. We consider an environment in which a set of jobs must be scheduled over a set of parallel manufacturing cells, each consisting of a single machine, where the processing time of each job depends on the amount of resource allocated to the associated cell. Two versions of the problem are introduced: a static problem in which a single resource-allocation decision is made and maintained throughout the production horizon, and a dynamic problem in which resource can be reassigned among the production cells as local bottlenecks shift. We provide mathematical formulations for each version of the problem, establish problem complexity, identify important characteristics of optimal solutions, develop optimal and heuristic solution approaches, and report the results of a set of computational experiments. The computational results demonstrate that substantial improvements in operational performance can be achieved through effective utilization of resource flexibility.

Suggested Citation

  • Richard L. Daniels & Barbara J. Hoopes & Joseph B. Mazzola, 1996. "Scheduling Parallel Manufacturing Cells with Resource Flexibility," Management Science, INFORMS, vol. 42(9), pages 1260-1276, September.
  • Handle: RePEc:inm:ormnsc:v:42:y:1996:i:9:p:1260-1276
    DOI: 10.1287/mnsc.42.9.1260
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.42.9.1260
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.42.9.1260?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Edis, Emrah B. & Oguz, Ceyda & Ozkarahan, Irem, 2013. "Parallel machine scheduling with additional resources: Notation, classification, models and solution methods," European Journal of Operational Research, Elsevier, vol. 230(3), pages 449-463.
    2. Ruiz-Torres, Alex J. & Lopez, Francisco J. & Ho, Johnny C., 2007. "Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 179(2), pages 302-315, June.
    3. Norelhouda Sekkal & Fayçal Belkaid, 2020. "A multi-objective simulated annealing to solve an identical parallel machine scheduling problem with deterioration effect and resources consumption constraints," Journal of Combinatorial Optimization, Springer, vol. 40(3), pages 660-696, October.
    4. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    5. Kayan, Rabia K. & Akturk, M. Selim, 2005. "A new bounding mechanism for the CNC machine scheduling problems with controllable processing times," European Journal of Operational Research, Elsevier, vol. 167(3), pages 624-643, December.
    6. Garavelli, A. Claudio, 2001. "Performance analysis of a batch production system with limited flexibility," International Journal of Production Economics, Elsevier, vol. 69(1), pages 39-48, January.
    7. Albino, Vito & Claudio Garavelli, A., 1999. "Limited flexibility in cellular manufacturing systems: A simulation study," International Journal of Production Economics, Elsevier, vol. 60(1), pages 447-455, April.
    8. Su, Ling-Huey & Lien, Chun-Yuan, 2009. "Scheduling parallel machines with resource-dependent processing times," International Journal of Production Economics, Elsevier, vol. 117(2), pages 256-266, February.
    9. Norelhouda Sekkal & Fayçal Belkaid, 0. "A multi-objective simulated annealing to solve an identical parallel machine scheduling problem with deterioration effect and resources consumption constraints," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-37.
    10. Richard L. Daniels & Joseph B. Mazzola & Dailun Shi, 2004. "Flow Shop Scheduling with Partial Resource Flexibility," Management Science, INFORMS, vol. 50(5), pages 658-669, May.
    11. Mohamed Amine Abdeljaoued & Nour El Houda Saadani & Zied Bahroun, 2020. "Heuristic and metaheuristic approaches for parallel machine scheduling under resource constraints," Operational Research, Springer, vol. 20(4), pages 2109-2132, December.
    12. Puay Khoon Toh & Gautam Ahuja, 2022. "Integration and appropriability: A study of process and product components within a firm's innovation portfolio," Strategic Management Journal, Wiley Blackwell, vol. 43(6), pages 1075-1109, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:42:y:1996:i:9:p:1260-1276. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.