IDEAS home Printed from https://ideas.repec.org/a/gam/jlogis/v3y2018i1p1-d191883.html
   My bibliography  Save this article

Analysis of Factors Causing Delays in the Diesel Engine Remanufacturing Process at an Indonesian Company

Author

Listed:
  • Erwin Soeseno

    (Department of Management, Faculty of Economics and Business, Universitas Indonesia, UI Campus Depok 16424, Indonesia)

  • Ratih Dyah Kusumastuti

    (Department of Management, Faculty of Economics and Business, Universitas Indonesia, UI Campus Depok 16424, Indonesia)

Abstract

HeavyEq is an Indonesian company that remanufactures diesel engines for the mining industry. The company experiences delays in the remanufacturing process that lead to a sales backlog. The main purpose of this paper is to identify the root cause of, and propose a solution to, the problem. A fishbone diagram is developed to identify the root cause, and the results show that delays in the remanufacturing process are mainly caused by uncertainty over cores (used engines) in terms of their arrival time, quantity, and quality. Based on a literature review and interviews with experts, an improvement in core acquisition activity, separating job orders for disassembly and recovery, and reassembly processes is proposed to reduce delays in the remanufacturing process.

Suggested Citation

  • Erwin Soeseno & Ratih Dyah Kusumastuti, 2018. "Analysis of Factors Causing Delays in the Diesel Engine Remanufacturing Process at an Indonesian Company," Logistics, MDPI, vol. 3(1), pages 1-15, December.
  • Handle: RePEc:gam:jlogis:v:3:y:2018:i:1:p:1-:d:191883
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2305-6290/3/1/1/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2305-6290/3/1/1/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Roland Geyer & Luk N. Van Wassenhove & Atalay Atasu, 2007. "The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles," Management Science, INFORMS, vol. 53(1), pages 88-100, January.
    2. Tang, Ou & Grubbstrom, Robert W. & Zanoni, Simone, 2007. "Planned lead time determination in a make-to-order remanufacturing system," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 426-435, July.
    3. Fleischmann, Mortiz & Krikke, Hans Ronald & Dekker, Rommert & Flapper, Simme Douwe P., 2000. "A characterisation of logistics networks for product recovery," Omega, Elsevier, vol. 28(6), pages 653-666, December.
    4. Östlin, Johan & Sundin, Erik & Björkman, Mats, 2008. "Importance of closed-loop supply chain relationships for product remanufacturing," International Journal of Production Economics, Elsevier, vol. 115(2), pages 336-348, October.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Genc, Talat S. & Giovanni, Pietro De, 2017. "Trade-in and save: A two-period closed-loop supply chain game with price and technology dependent returns," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 514-527.
    2. De Giovanni, Pietro & Zaccour, Georges, 2014. "A two-period game of a closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 232(1), pages 22-40.
    3. Xiong, Yu & Zhou, Yu & Li, Gendao & Chan, Hing-Kai & Xiong, Zhongkai, 2013. "Don’t forget your supplier when remanufacturing," European Journal of Operational Research, Elsevier, vol. 230(1), pages 15-25.
    4. Muyldermans, L. & Van Wassenhove, L.N. & Guide, V.D.R., 2019. "Managing high-end ex-demonstration product returns," European Journal of Operational Research, Elsevier, vol. 277(1), pages 195-214.
    5. Ghosh, Debabrata & Shah, Janat, 2012. "A comparative analysis of greening policies across supply chain structures," International Journal of Production Economics, Elsevier, vol. 135(2), pages 568-583.
    6. Hua Ke & Yong Wu & Hu Huang, 2018. "Competitive Pricing and Remanufacturing Problem in an Uncertain Closed-Loop Supply Chain with Risk-Sensitive Retailers," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 35(01), pages 1-21, February.
    7. Wang, Wenyuan & Wang, Yue & Mo, Daniel & Tseng, Mitchell M., 2017. "Managing component reuse in remanufacturing under product diffusion dynamics," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 551-560.
    8. Georgiadis, Patroklos & Athanasiou, Efstratios, 2013. "Flexible long-term capacity planning in closed-loop supply chains with remanufacturing," European Journal of Operational Research, Elsevier, vol. 225(1), pages 44-58.
    9. De Giovanni, Pietro & Zaccour, Georges, 2019. "Optimal quality improvements and pricing strategies with active and passive product returns," Omega, Elsevier, vol. 88(C), pages 248-262.
    10. Wenyuan Wang & Daniel Y. Mo & Yue Wang & Mitchell M. Tseng, 2019. "Assessing the cost structure of component reuse in a product family for remanufacturing," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 575-587, February.
    11. Ghosh, Debabrata & Gouda, Sirish & Shankar, Ravi & Swami, Sanjeev & Thomas, Vinu Cheruvil, 2018. "Strategic decision making under subscription-based contracts for remanufacturing," International Journal of Production Economics, Elsevier, vol. 200(C), pages 134-150.
    12. Pietro De Giovanni, 2016. "State- and Control-Dependent Incentives in a Closed-Loop Supply Chain with Dynamic Returns," Dynamic Games and Applications, Springer, vol. 6(1), pages 20-54, March.
    13. Govindan, Kannan & Soleimani, Hamed & Kannan, Devika, 2015. "Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future," European Journal of Operational Research, Elsevier, vol. 240(3), pages 603-626.
    14. Hong, I-Hsuan & Yeh, Jun-Sheng, 2012. "Modeling closed-loop supply chains in the electronics industry: A retailer collection application," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(4), pages 817-829.
    15. Özceylan, Eren & Paksoy, Turan & Bektaş, Tolga, 2014. "Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 61(C), pages 142-164.
    16. Schweiger, Katharina & Sahamie, Ramin, 2013. "A hybrid Tabu Search approach for the design of a paper recycling network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 50(C), pages 98-119.
    17. Caiado, Nathália & Guarnieri, Patricia & Xavier, Lúcia Helena & de Lorena Diniz Chaves, Gisele, 2017. "A characterization of the Brazilian market of reverse logistic credits (RLC) and an analogy with the existing carbon credit market," Resources, Conservation & Recycling, Elsevier, vol. 118(C), pages 47-59.
    18. Yenipazarli, Arda, 2016. "Managing new and remanufactured products to mitigate environmental damage under emissions regulation," European Journal of Operational Research, Elsevier, vol. 249(1), pages 117-130.
    19. Patricia van Loon & Luk N. Van Wassenhove & Ales Mihelic, 2022. "Designing a circular business strategy: 7 years of evolution at a large washing machine manufacturer," Business Strategy and the Environment, Wiley Blackwell, vol. 31(3), pages 1030-1041, March.
    20. Yue Tan & Chunxiang Guo, 2019. "Research on Two-Way Logistics Operation with Uncertain Recycling Quality in Government Multi-Policy Environment," Sustainability, MDPI, vol. 11(3), pages 1-18, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jlogis:v:3:y:2018:i:1:p:1-:d:191883. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.