IDEAS home Printed from https://ideas.repec.org/a/eee/transa/v32y1998i4p279-295.html
   My bibliography  Save this article

Predicting on-time performance in scheduled railroad operations: methodology and application to train scheduling

Author

Listed:
  • Hallowell, Susan F.
  • Harker, Patrick T.

Abstract

In previous work, the authors developed an analytical line delay model for analyzing rail line-haul operations, and validated the model as a predictive tool. This paper examines the application of the model as a prescriptive tool for the generation of train schedules. A unique feature of the model is that it incorporates dynamic meet/pass priorities in order to approximate an optimal meet/pass planning process. Extensive Monte Carlo simulations are conducted to examine the application of the model for adjusting real-world schedules to improve on-time performance and reduce delay. This empirical work represents the first attempt to investigate the impacts of the scheduling methodology on on-time line-haul performance. The problems are based on historical data from a major North American railroad.

Suggested Citation

  • Hallowell, Susan F. & Harker, Patrick T., 1998. "Predicting on-time performance in scheduled railroad operations: methodology and application to train scheduling," Transportation Research Part A: Policy and Practice, Elsevier, vol. 32(4), pages 279-295, May.
  • Handle: RePEc:eee:transa:v:32:y:1998:i:4:p:279-295
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0965-8564(97)00009-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Patrick T. Harker, 1995. "Services and Technology: Reengineering the Railroads," Interfaces, INFORMS, vol. 25(3), pages 72-80, June.
    2. Kraay, David R. & Harker, Patrick T., 1995. "Real-time scheduling of freight railroads," Transportation Research Part B: Methodological, Elsevier, vol. 29(3), pages 213-229, June.
    3. Martland, Carl D. & Smith, Michael E., 1990. "Estimating the Impact of Advanced Dispatching Systems on Terminal Performance," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 30(2).
    4. Dejan Jovanović & Patrick T. Harker, 1991. "Tactical Scheduling of Rail Operations: The SCAN I System," Transportation Science, INFORMS, vol. 25(1), pages 46-64, February.
    5. Carl D. Martland, 1982. "PMAKE Analysis: Predicting Rail Yard Time Distributions Using Probabilistic Train Connection Standards," Transportation Science, INFORMS, vol. 16(4), pages 476-506, November.
    6. Allen, W. Bruce & Mahmoud, Mohamed M. & McNeil, Douglas, 1985. "The importance of time in transit and reliability of transit time for shippers, receivers, and carriers," Transportation Research Part B: Methodological, Elsevier, vol. 19(5), pages 447-456, October.
    7. Smith, M.E., 1990. "Keeping Trains on Schedule: On-Line Planning Systems for the Advanced Railroad Electronics System (ARES)," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 31(1).
    8. Susan Fraley Hallowell & Patrick T. Harker, 1996. "Predicting On-Time Line-Haul Performance in Scheduled Railroad Operations," Transportation Science, INFORMS, vol. 30(4), pages 364-378, November.
    9. David Kraay & Patrick T. Harker & Bintong Chen, 1991. "Optimal Pacing of Trains in Freight Railroads: Model Formulation and Solution," Operations Research, INFORMS, vol. 39(1), pages 82-99, February.
    10. Jovanovic, Dejan & Harker, Patrick T., 1990. "A Decision Support System for Train Dispatching: An Optimization-Based Methodology," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 31(1).
    11. Smith, Michael & Patel, Pradeep K. & Resor, Randolph R. & Kondapalli, Sunil, 1990. "Benefits of the Meet/Pass Planning and Energy Management Subsystems of the Advanced Railroad Electronics System (ARES)," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 30(2).
    12. Bintong Chen & Patrick T. Harker, 1990. "Two Moments Estimation of the Delay on Single-Track Rail Lines with Scheduled Traffic," Transportation Science, INFORMS, vol. 24(4), pages 261-275, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kroon, L.G. & Dekker, R. & Vromans, M.J.C.M., 2005. "Cyclic Railway Timetabling: a Stochastic Optimization Approach," ERIM Report Series Research in Management ERS-2005-051-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    2. Leachman, Robert C. & Jula, Payman, 2012. "Estimating flow times for containerized imports from Asia to the United States through the Western rail network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(1), pages 296-309.
    3. Carey, Malachy, 1999. "Ex ante heuristic measures of schedule reliability," Transportation Research Part B: Methodological, Elsevier, vol. 33(7), pages 473-494, September.
    4. Kroon, Leo & Maróti, Gábor & Helmrich, Mathijn Retel & Vromans, Michiel & Dekker, Rommert, 2008. "Stochastic improvement of cyclic railway timetables," Transportation Research Part B: Methodological, Elsevier, vol. 42(6), pages 553-570, July.
    5. Rietveld, P. & Bruinsma, F. R. & van Vuuren, D. J., 2001. "Coping with unreliability in public transport chains: A case study for Netherlands," Transportation Research Part A: Policy and Practice, Elsevier, vol. 35(6), pages 539-559, July.
    6. Rietveld, P. & Bruinsma, F.R. & Vuuren, D.J. van, 1999. "Coping with unreliability in public transport chains," Serie Research Memoranda 0031, VU University Amsterdam, Faculty of Economics, Business Administration and Econometrics.
    7. Chow, Andy H.F. & Pavlides, Aris, 2018. "Cost functions and multi-objective timetabling of mixed train services," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 335-356.
    8. Törnquist, Johanna, 2007. "Railway traffic disturbance management--An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon," Transportation Research Part A: Policy and Practice, Elsevier, vol. 41(3), pages 249-266, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Meng, Lingyun & Zhou, Xuesong, 2011. "Robust single-track train dispatching model under a dynamic and stochastic environment: A scenario-based rolling horizon solution approach," Transportation Research Part B: Methodological, Elsevier, vol. 45(7), pages 1080-1102, August.
    2. Kraay, David R. & Harker, Patrick T., 1995. "Real-time scheduling of freight railroads," Transportation Research Part B: Methodological, Elsevier, vol. 29(3), pages 213-229, June.
    3. Jean-François Cordeau & Paolo Toth & Daniele Vigo, 1998. "A Survey of Optimization Models for Train Routing and Scheduling," Transportation Science, INFORMS, vol. 32(4), pages 380-404, November.
    4. Enrique Castillo & Inmaculada Gallego & José Ureña & José Coronado, 2009. "Timetabling optimization of a single railway track line with sensitivity analysis," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 17(2), pages 256-287, December.
    5. Lee, Yusin & Chen, Chuen-Yih, 2009. "A heuristic for the train pathing and timetabling problem," Transportation Research Part B: Methodological, Elsevier, vol. 43(8-9), pages 837-851, September.
    6. Talebian, Ahmadreza & Zou, Bo, 2015. "Integrated modeling of high performance passenger and freight train planning on shared-use corridors in the US," Transportation Research Part B: Methodological, Elsevier, vol. 82(C), pages 114-140.
    7. Ortega Riejos, Francisco A. & Barrena, Eva & Canca Ortiz, J. David & Laporte, Gilbert, 2016. "Analyzing the theoretical capacity of railway networks with a radial-backbone topology," Transportation Research Part A: Policy and Practice, Elsevier, vol. 84(C), pages 83-92.
    8. Zhou, Xuesong & Zhong, Ming, 2007. "Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds," Transportation Research Part B: Methodological, Elsevier, vol. 41(3), pages 320-341, March.
    9. Ghoseiri, Keivan & Szidarovszky, Ferenc & Asgharpour, Mohammad Jawad, 2004. "A multi-objective train scheduling model and solution," Transportation Research Part B: Methodological, Elsevier, vol. 38(10), pages 927-952, December.
    10. Li, Feng & Gao, Ziyou & Li, Keping & Yang, Lixing, 2008. "Efficient scheduling of railway traffic based on global information of train," Transportation Research Part B: Methodological, Elsevier, vol. 42(10), pages 1008-1030, December.
    11. Carey, Malachy & Kwiecinski, Andrzej, 1995. "Properties of expected costs and performance measures in stochastic models of scheduled transport," European Journal of Operational Research, Elsevier, vol. 83(1), pages 182-199, May.
    12. Li, Feng & Sheu, Jiuh-Biing & Gao, Zi-You, 2014. "Deadlock analysis, prevention and train optimal travel mechanism in single-track railway system," Transportation Research Part B: Methodological, Elsevier, vol. 68(C), pages 385-414.
    13. Carlo Mannino & Alessandro Mascis, 2009. "Optimal Real-Time Traffic Control in Metro Stations," Operations Research, INFORMS, vol. 57(4), pages 1026-1039, August.
    14. Ferreira, L., 1997. "Planning Australian freight rail operations: An overview," Transportation Research Part A: Policy and Practice, Elsevier, vol. 31(4), pages 335-348, July.
    15. Carey, Malachy & Crawford, Ivan, 2007. "Scheduling trains on a network of busy complex stations," Transportation Research Part B: Methodological, Elsevier, vol. 41(2), pages 159-178, February.
    16. Carey, Malachy, 1999. "Ex ante heuristic measures of schedule reliability," Transportation Research Part B: Methodological, Elsevier, vol. 33(7), pages 473-494, September.
    17. Min, Yun-Hong & Park, Myoung-Ju & Hong, Sung-Pil & Hong, Soon-Heum, 2011. "An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network," Transportation Research Part B: Methodological, Elsevier, vol. 45(2), pages 409-429, February.
    18. Sahin, Ismail, 1999. "Railway traffic control and train scheduling based oninter-train conflict management," Transportation Research Part B: Methodological, Elsevier, vol. 33(7), pages 511-534, September.
    19. Carey, Malachy & Carville, Sinead, 2003. "Scheduling and platforming trains at busy complex stations," Transportation Research Part A: Policy and Practice, Elsevier, vol. 37(3), pages 195-224, March.
    20. Adenso-Díaz, B. & Oliva González, M. & González-Torre, P., 1999. "On-line timetable re-scheduling in regional train services," Transportation Research Part B: Methodological, Elsevier, vol. 33(6), pages 387-398, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transa:v:32:y:1998:i:4:p:279-295. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/547/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.