IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v175y2018icp92-104.html
   My bibliography  Save this article

Bi-objective optimization of a job shop with two types of failures for the operating machines that use automated guided vehicles

Author

Listed:
  • Karimi, Behzad
  • Niaki, S.T.A.
  • Haleh, Hassan
  • Naderi, Bahman

Abstract

Reliability of machinery and equipment in flexible manufacturing systems are among the most important issues to reduce production costs and to increase efficiency. This paper investigates the reliability of machinery in job shop production systems, where materials, parts, and other production needs are handled by automated guided vehicles (AGV). The failures time of the parallel machines in a given shop follow either an exponential or a Weibull distribution. As there is no closed-form equation to calculate the reliability of the shop in the Weibull case, a simulation approach is taken in this paper to estimate the reliability. Then, a bi-objective nonlinear optimization model is developed for the problem under investigation to maximize shop reliability as well as to minimize production time, simultaneously. In order to assess the efficacy of the proposed model, some random instances are generated, based on which two meta-heuristic algorithms called non-dominated sorting cuckoo search (NSCS) and multi-objective teaching–learning-based optimization (MOTLBO) are designed. Finally, to evaluate and compare the effectiveness of the proposed solution algorithms, an efficient solution AHP-TOPSIS technique is utilized.

Suggested Citation

  • Karimi, Behzad & Niaki, S.T.A. & Haleh, Hassan & Naderi, Bahman, 2018. "Bi-objective optimization of a job shop with two types of failures for the operating machines that use automated guided vehicles," Reliability Engineering and System Safety, Elsevier, vol. 175(C), pages 92-104.
  • Handle: RePEc:eee:reensy:v:175:y:2018:i:c:p:92-104
    DOI: 10.1016/j.ress.2018.01.018
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832017308335
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2018.01.018?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kim, Heungseob & Kim, Pansoo, 2017. "Reliability models for a nonrepairable system with heterogeneous components having a phase-type time-to-failure distribution," Reliability Engineering and System Safety, Elsevier, vol. 159(C), pages 37-46.
    2. Cao, Dingzhou & Murat, Alper & Chinnam, Ratna Babu, 2013. "Efficient exact optimization of multi-objective redundancy allocation problems in series-parallel systems," Reliability Engineering and System Safety, Elsevier, vol. 111(C), pages 154-163.
    3. Guilani, Pedram Pourkarim & Azimi, Parham & Niaki, S.T.A. & Niaki, Seyed Armin Akhavan, 2016. "Redundancy allocation problem of a system with increasing failure rates of components based on Weibull distribution: A simulation-based optimization approach," Reliability Engineering and System Safety, Elsevier, vol. 152(C), pages 187-196.
    4. Fazlollahtabar, Hamed & Saidi-Mehrabad, Mohammad & Balakrishnan, Jaydeep, 2015. "Integrated Markov-neural reliability computation method: A case for multiple automated guided vehicle system," Reliability Engineering and System Safety, Elsevier, vol. 135(C), pages 34-44.
    5. Hamed Fazlollahtabar & Mohammad Saidi-Mehrabad, 2013. "Optimising a multi-objective reliability assessment in multiple AGV manufacturing system," International Journal of Services and Operations Management, Inderscience Enterprises Ltd, vol. 16(3), pages 352-372.
    6. Park, Jae-Hyun, 2017. "Time-dependent reliability of wireless networks with dependent failures," Reliability Engineering and System Safety, Elsevier, vol. 165(C), pages 47-61.
    7. Galante, Giacomo & Passannanti, Gianfranco, 2009. "An exact algorithm for preventive maintenance planning of series–parallel systems," Reliability Engineering and System Safety, Elsevier, vol. 94(10), pages 1517-1525.
    8. Khalili-Damghani, Kaveh & Abtahi, Amir-Reza & Tavana, Madjid, 2013. "A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems," Reliability Engineering and System Safety, Elsevier, vol. 111(C), pages 58-75.
    9. Borgonovo, Emanuele & Aliee, Hananeh & Glaß, Michael & Teich, Jürgen, 2016. "A new time-independent reliability importance measure," European Journal of Operational Research, Elsevier, vol. 254(2), pages 427-442.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ruiying Li & Xiaoyu Tian & Li Yu & Rui Kang, 2019. "A Systematic Disturbance Analysis Method for Resilience Evaluation: A Case Study in Material Handling Systems," Sustainability, MDPI, vol. 11(5), pages 1-18, March.
    2. Yubang Liu & Shouwen Ji & Zengrong Su & Dong Guo, 2019. "Multi-objective AGV scheduling in an automatic sorting system of an unmanned (intelligent) warehouse by using two adaptive genetic algorithms and a multi-adaptive genetic algorithm," PLOS ONE, Public Library of Science, vol. 14(12), pages 1-21, December.
    3. Behzad Karimi & Seyed Taghi Akhavan Niaki & Amir Hossein Niknamfar & Mahsa Gareh Hassanlu, 2021. "Multi-objective optimization of job shops with automated guided vehicles: A non-dominated sorting cuckoo search algorithm," Journal of Risk and Reliability, , vol. 235(2), pages 306-328, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Gholinezhad, Hadi & Zeinal Hamadani, Ali, 2017. "A new model for the redundancy allocation problem with component mixing and mixed redundancy strategy," Reliability Engineering and System Safety, Elsevier, vol. 164(C), pages 66-73.
    2. Zhou, Yifan & Lin, Tian Ran & Sun, Yong & Bian, Yangqing & Ma, Lin, 2015. "An effective approach to reducing strategy space for maintenance optimisation of multistate series–parallel systems," Reliability Engineering and System Safety, Elsevier, vol. 138(C), pages 40-53.
    3. Zhang, Enze & Chen, Qingwei, 2016. "Multi-objective reliability redundancy allocation in an interval environment using particle swarm optimization," Reliability Engineering and System Safety, Elsevier, vol. 145(C), pages 83-92.
    4. Zhao, Jiangbin & Si, Shubin & Cai, Zhiqiang, 2019. "A multi-objective reliability optimization for reconfigurable systems considering components degradation," Reliability Engineering and System Safety, Elsevier, vol. 183(C), pages 104-115.
    5. Pradip Kundu, 2021. "A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters," Operational Research, Springer, vol. 21(4), pages 2433-2458, December.
    6. Cao, Ran & Coit, David W. & Hou, Wei & Yang, Yushu, 2020. "Game theory based solution selection for multi-objective redundancy allocation in interval-valued problem parameters," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
    7. Zhang, Enze & Wu, Yifei & Chen, Qingwei, 2014. "A practical approach for solving multi-objective reliability redundancy allocation problems using extended bare-bones particle swarm optimization," Reliability Engineering and System Safety, Elsevier, vol. 127(C), pages 65-76.
    8. Kong, Xiangyong & Gao, Liqun & Ouyang, Haibin & Li, Steven, 2015. "Solving the redundancy allocation problem with multiple strategy choices using a new simplified particle swarm optimization," Reliability Engineering and System Safety, Elsevier, vol. 144(C), pages 147-158.
    9. Ali Salmasnia & Sadegh Noori & Hadi Mokhtari, 2019. "A redundancy allocation problem by using utility function method and ant colony optimization: tradeoff between availability and total cost," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 416-428, June.
    10. Jiangbin Zhao & Shubin Si & Zhiqiang Cai & Ming Su & Wei Wang, 2019. "Multiobjective optimization of reliability–redundancy allocation problems for serial parallel-series systems based on importance measure," Journal of Risk and Reliability, , vol. 233(5), pages 881-897, October.
    11. Guilani, Pardis Pourkarim & Juybari, Mohammad N. & Ardakan, Mostafa Abouei & Kim, Heungseob, 2020. "Sequence optimization in reliability problems with a mixed strategy and heterogeneous backup scheme," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    12. Behzad Karimi & Seyed Taghi Akhavan Niaki & Amir Hossein Niknamfar & Mahsa Gareh Hassanlu, 2021. "Multi-objective optimization of job shops with automated guided vehicles: A non-dominated sorting cuckoo search algorithm," Journal of Risk and Reliability, , vol. 235(2), pages 306-328, April.
    13. Vahid Baradaran & Amir Hossein Hosseinian, 2020. "A bi-objective model for redundancy allocation problem in designing server farms: mathematical formulation and solution approaches," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(5), pages 935-952, October.
    14. Zarezadeh, S. & Mohammadi, L. & Balakrishnan, N., 2018. "On the joint signature of several coherent systems with some shared components," European Journal of Operational Research, Elsevier, vol. 264(3), pages 1092-1100.
    15. Phuc Do & Christophe Bérenguer, 2022. "Residual life-based importance measures for predictive maintenance decision-making," Journal of Risk and Reliability, , vol. 236(1), pages 98-113, February.
    16. Montoro-Cazorla, Delia & Pérez-Ocón, Rafael, 2018. "Constructing a Markov process for modelling a reliability system under multiple failures and replacements," Reliability Engineering and System Safety, Elsevier, vol. 173(C), pages 34-47.
    17. Jørgen Vitting Andersen & Roy Cerqueti & Giulia Rotundo, 2017. "Rational expectations and stochastic systems," Documents de travail du Centre d'Economie de la Sorbonne 17060, Université Panthéon-Sorbonne (Paris 1), Centre d'Economie de la Sorbonne, revised Oct 2019.
    18. Briš, Radim & Byczanski, Petr & Goňo, Radomír & Rusek, Stanislav, 2017. "Discrete maintenance optimization of complex multi-component systems," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 80-89.
    19. Mohammadi, Fatemeh & Saenz-de-Cabezon, Eduardo & Wynn, Henry P., 2018. "Efficient multicut enumeration of k -out-of- n:F and consecutive k -out-of- n:F systems," LSE Research Online Documents on Economics 86460, London School of Economics and Political Science, LSE Library.
    20. Kim, Heungseob, 2018. "Maximization of system reliability with the consideration of component sequencing," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 64-72.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:175:y:2018:i:c:p:92-104. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.