IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v45y1996i1-3p443-447.html
   My bibliography  Save this article

The extended EOQ repair and waste disposal model

Author

Listed:
  • Richter, Knut

Abstract

No abstract is available for this item.

Suggested Citation

  • Richter, Knut, 1996. "The extended EOQ repair and waste disposal model," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 443-447, August.
  • Handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:443-447
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00143-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Mabini, Marilyn C. & Pintelon, Liliane M. & Gelders, Ludo F., 1992. "EOQ type formulations for controlling repairable inventories," International Journal of Production Economics, Elsevier, vol. 28(1), pages 21-33, November.
    2. Hahm, Juho & Yano, Candace Arai, 1992. "The economic lot and delivery scheduling problem: The single item case," International Journal of Production Economics, Elsevier, vol. 28(2), pages 235-252, November.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Richter, Knut, 1996. "The EOQ repair and waste disposal model with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 95(2), pages 313-324, December.
    2. Kai-Leung Yung & Jiafu Tang & Andrew W. H. Ip & Dingwei Wang, 2006. "Heuristics for Joint Decisions in Production, Transportation, and Order Quantity," Transportation Science, INFORMS, vol. 40(1), pages 99-116, February.
    3. Hrabec, Dušan & Hvattum, Lars Magnus & Hoff, Arild, 2022. "The value of integrated planning for production, inventory, and routing decisions: A systematic review and meta-analysis," International Journal of Production Economics, Elsevier, vol. 248(C).
    4. Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
    5. Hark-Chin Hwang, 2009. "Inventory Replenishment and Inbound Shipment Scheduling Under a Minimum Replenishment Policy," Transportation Science, INFORMS, vol. 43(2), pages 244-264, May.
    6. Tseng, Chao-Tang & Wu, Mei-Fang & Lin, Hong-Dar & Chiu, Yuan-Shyi Peter, 2014. "Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach," Economic Modelling, Elsevier, vol. 36(C), pages 30-36.
    7. Pundoor, Guruprasad & Chen, Zhi-Long, 2009. "Joint cyclic production and delivery scheduling in a two-stage supply chain," International Journal of Production Economics, Elsevier, vol. 119(1), pages 55-74, May.
    8. Choi, Dae-Won & Hwang, Hark & Koh, Shie-Gheun, 2007. "A generalized ordering and recovery policy for reusable items," European Journal of Operational Research, Elsevier, vol. 182(2), pages 764-774, October.
    9. Omar, Mohd & Yeo, Ivan, 2014. "A production–repair inventory model with time-varying demand and multiple setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 398-405.
    10. Gou, Qinglong & Liang, Liang & Huang, Zhimin & Xu, Chuanyong, 2008. "A joint inventory model for an open-loop reverse supply chain," International Journal of Production Economics, Elsevier, vol. 116(1), pages 28-42, November.
    11. Hallak, Bassam K. & Nasr, Walid W. & Jaber, Mohamad Y., 2021. "Re-ordering policies for inventory systems with recyclable items and stochastic demand – Outsourcing vs. in-house recycling," Omega, Elsevier, vol. 105(C).
    12. Wang, Kung-Jeng & Lin, Y.S. & Yu, Jonas C.P., 2011. "Optimizing inventory policy for products with time-sensitive deteriorating rates in a multi-echelon supply chain," International Journal of Production Economics, Elsevier, vol. 130(1), pages 66-76, March.
    13. Piewthongngam, Kullapapruk & Pathumnakul, Supachai & Homkhampad, Suphakan, 2013. "An interactive approach to optimize production–distribution planning for an integrated feed swinecompany," International Journal of Production Economics, Elsevier, vol. 142(2), pages 290-301.
    14. Sıla Çetinkaya & Chung‐Yee Lee, 2002. "Optimal outbound dispatch policies: Modeling inventory and cargo capacity," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(6), pages 531-556, September.
    15. Eksioglu, Sandra Duni, 2009. "A primal-dual algorithm for the economic lot-sizing problem with multi-mode replenishment," European Journal of Operational Research, Elsevier, vol. 197(1), pages 93-101, August.
    16. El Saadany, Ahmed M.A. & Jaber, Mohamad Y. & Bonney, Maurice, 2013. "How many times to remanufacture?," International Journal of Production Economics, Elsevier, vol. 143(2), pages 598-604.
    17. Bimal Kumar Mawandiya & J. K. Jha & Jitesh J. Thakkar, 2020. "Optimal production-inventory policy for closed-loop supply chain with remanufacturing under random demand and return," Operational Research, Springer, vol. 20(3), pages 1623-1664, September.
    18. Mostafa Parsa & Ali Shahandeh Nookabadi & Zümbül Atan & Yaser Malekian, 2022. "An optimal inventory policy for a multi-echelon closed-loop supply chain of postconsumer recycled content products," Operational Research, Springer, vol. 22(3), pages 1887-1938, July.
    19. Osman, Hany & Demirli, Kudret, 2012. "Economic lot and delivery scheduling problem for multi-stage supply chains," International Journal of Production Economics, Elsevier, vol. 136(2), pages 275-286.
    20. Osman, Hany & Demirli, Kudret, 2012. "Integrated safety stock optimization for multiple sourced stockpoints facing variable demand and lead time," International Journal of Production Economics, Elsevier, vol. 135(1), pages 299-307.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:443-447. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.