The extended EOQ repair and waste disposal model
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Mabini, Marilyn C. & Pintelon, Liliane M. & Gelders, Ludo F., 1992. "EOQ type formulations for controlling repairable inventories," International Journal of Production Economics, Elsevier, vol. 28(1), pages 21-33, November.
- Hahm, Juho & Yano, Candace Arai, 1992. "The economic lot and delivery scheduling problem: The single item case," International Journal of Production Economics, Elsevier, vol. 28(2), pages 235-252, November.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Richter, Knut, 1996. "The EOQ repair and waste disposal model with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 95(2), pages 313-324, December.
- Kai-Leung Yung & Jiafu Tang & Andrew W. H. Ip & Dingwei Wang, 2006. "Heuristics for Joint Decisions in Production, Transportation, and Order Quantity," Transportation Science, INFORMS, vol. 40(1), pages 99-116, February.
- Hrabec, Dušan & Hvattum, Lars Magnus & Hoff, Arild, 2022. "The value of integrated planning for production, inventory, and routing decisions: A systematic review and meta-analysis," International Journal of Production Economics, Elsevier, vol. 248(C).
- Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
- Chung-Yee Lee & Sila Çetinkaya & Wikrom Jaruphongsa, 2003. "A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse," Operations Research, INFORMS, vol. 51(5), pages 735-747, October.
- Byung Duk Song & Young Dae Ko, 2017. "Effect of Inspection Policies and Residual Value of Collected Used Products: A Mathematical Model and Genetic Algorithm for a Closed-Loop Green Manufacturing System," Sustainability, MDPI, vol. 9(9), pages 1-14, September.
- Torabi, S.A. & Fatemi Ghomi, S.M.T. & Karimi, B., 2006. "A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains," European Journal of Operational Research, Elsevier, vol. 173(1), pages 173-189, August.
- Clausen, Jens & Ju, Suquan, 2006. "A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1141-1150, December.
- Hark-Chin Hwang, 2009. "Inventory Replenishment and Inbound Shipment Scheduling Under a Minimum Replenishment Policy," Transportation Science, INFORMS, vol. 43(2), pages 244-264, May.
- Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
- Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
- Tseng, Chao-Tang & Wu, Mei-Fang & Lin, Hong-Dar & Chiu, Yuan-Shyi Peter, 2014. "Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach," Economic Modelling, Elsevier, vol. 36(C), pages 30-36.
- Pundoor, Guruprasad & Chen, Zhi-Long, 2009. "Joint cyclic production and delivery scheduling in a two-stage supply chain," International Journal of Production Economics, Elsevier, vol. 119(1), pages 55-74, May.
- Hsieh, Chung-Chi & Lathifah, Artya, 2022. "Ordering and waste reuse decisions in a make-to-order system under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1290-1303.
- Hall, Randolph W., 1996. "On the integration of production and distribution: Economic order and production quantity implications," Transportation Research Part B: Methodological, Elsevier, vol. 30(5), pages 387-403, October.
- Kunpeng Li & Suman Mallik & Dilip Chhajed, 2012. "Design of Extended Warranties in Supply Chains under Additive Demand," Production and Operations Management, Production and Operations Management Society, vol. 21(4), pages 730-746, July.
- Chiu, Singa Wang & Lin, Li-Wen & Chen, Kuang-Ku & Chou, Chung-Li, 2013. "Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule," Economic Modelling, Elsevier, vol. 33(C), pages 668-675.
- Choi, Dae-Won & Hwang, Hark & Koh, Shie-Gheun, 2007. "A generalized ordering and recovery policy for reusable items," European Journal of Operational Research, Elsevier, vol. 182(2), pages 764-774, October.
- El Saadany, Ahmed M.A. & Jaber, Mohamad Y., 2011. "A production/remanufacture model with returns' subassemblies managed differently," International Journal of Production Economics, Elsevier, vol. 133(1), pages 119-126, September.
- Omar, Mohd & Yeo, Ivan, 2014. "A production–repair inventory model with time-varying demand and multiple setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 398-405.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:443-447. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.